X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475151204000

Well Details

Well ID: 0475151204000
Loading map...
Location: 00/04-12-047-15W5/0
Location Alias: 00/04-12-47-15 W5M
Location Alias 2: 00/04-12-047-15 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 15
Section: 12
County/Municipality: Yellowhead County
Well Name: POCO ET AL BRAZEAU RIVER 4-12-47-15
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0179521
License Date: 1995-07-25
License Status: Re-Entered
Spud Date: 1995-09-12
Final Drill Date: 1995-10-13
Well Total Depth: 3312.00 m
Surface Hole Latitude: 53.035731
Surface Hole Longitude: -116.068067

For data sources see[1][2]

Well History

Date Event
1995-07-25 Obtained License
1995-09-12 Lost Circulation Occurred
1995-09-17 Surface Casing Operation Performed
1995-09-30 Kick Occurred
1995-10-01 Kick Occurred
1995-10-13 Finished Drilling
1995-10-13 Well Log Performed
1995-10-13 Well Mode changed to Drilled and Cased
1995-10-16 Kick Occurred
1995-10-16 Production Casing Operation Performed
1995-10-17 Rig Released
1995-10-28 Well Log Performed
1995-10-30 Perforation Treatment Performed - Jet Perforation
1995-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-11-04 Perforation Treatment Performed - Jet Perforation
1995-11-04 Plug Back Performed
1995-11-04 Well Log Performed
1995-11-07 Perforation Treatment Performed - Remedial Casing
1995-11-12 Perforation Treatment Performed - Fractured
1995-11-12 Perforation Treatment Performed - Jet Perforation
1995-11-12 Well Log Performed
1995-11-13 Well Log Performed
1995-12-18 Well Began Production
1995-12-18 Well Fluid changed to Gas
1995-12-18 Well Mode changed to Flowing
1996-06-01 Well Fluid changed to Gas
1996-06-01 Well Mode changed to Suspended
1997-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-14 Plug Back Performed
1997-09-16 Well Abandoned
1997-09-16 Well Fluid changed to Gas
1997-09-16 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-10-30 Perforation 3265.00 3271.00 20
1995-10-30 Perforation 3275.00 3282.00 20
1995-11-01 Acid Treatment 3265.00 3282.00 0
1995-11-04 Packing Device Capped w/Cement 3212.00 3220.00 0
1995-11-04 Perforation 1549.00 1550.00 14
1995-11-07 Remedial Casing Cementing 1549.00 1550.00 0
1995-11-12 Perforation 3038.00 3041.00 20
1995-11-12 Fracture 3038.00 3041.00 0
1997-09-14 Packing Device Capped w/Cement 3022.00 3030.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 309 0.0 0.0 0.0
1996 136 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1995-09-12 Lost Circulation 55.00 132.00
1995-09-30 Kick 3042.00 3042.00
1995-10-01 Kick 3042.00 3042.00
1995-10-01 Kick 3053.00 3053.00
1995-10-16 Kick 3312.00 3312.00

For data sources see[6]

References