X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475152009000

Well Details

Well ID: 0475152009000
Loading map...
Location: 00/09-20-047-15W5/0
Location Alias: 00/09-20-47-15 W5M
Location Alias 2: 00/09-20-047-15 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 15
Section: 20
County/Municipality: Yellowhead County
Well Name: CVE BRAZR 9-20-47-15
Operator Name: Cenovus Energy Inc.
License Number: 0180908
License Date: 1995-09-22
License Status: Issued
Spud Date: 1995-10-14
Final Drill Date: 1995-11-08
Well Total Depth: 3300.00 m
Surface Hole Latitude: 53.072090
Surface Hole Longitude: -116.152413

For data sources see[1][2]

Well History

Date Event
1995-09-22 Obtained License
1995-10-17 Surface Casing Operation Performed
1995-11-08 Finished Drilling
1995-11-08 Well Mode changed to Drilled and Cased
1995-11-09 Well Log Performed
1995-11-10 Well Log Performed
1995-11-11 Drill Stem Test Performed
1995-11-11 Well Log Performed
1995-11-13 Production Casing Operation Performed
1995-11-15 Rig Released
1995-11-20 Well Log Performed
1995-11-22 Perforation Treatment Performed - Jet Perforation
1995-11-22 Well Log Performed
1995-11-26 Perforation Treatment Performed - Fractured
1996-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-01-08 Perforation Treatment Performed - Fractured
1996-01-08 Perforation Treatment Performed - Jet Perforation
1996-01-08 Plug Back Performed
1996-01-08 Well Log Performed
1996-01-09 Well Log Performed
1996-01-13 Perforation Treatment Performed - Fractured
1996-02-11 Well Began Production
1996-02-11 Well Fluid changed to Gas
1996-02-11 Well Mode changed to Flowing
2003-05-01 Well Fluid changed to Gas
2003-05-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-11-22 Perforation 3273.00 3280.00 20
1995-11-22 Perforation 3263.00 3270.00 20
1995-11-26 Fracture 3263.00 3280.00 0
1996-01-08 Packing Device Capped w/Cement 3245.00 3253.00 0
1996-01-08 Perforation 3193.00 3198.00 20
1996-01-08 Fracture 3193.00 3198.00 0
1996-01-13 Fracture 3193.00 3198.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 7688 0.0 0.0 0.0
1997 8524 0.0 0.0 0.0
1998 8706 0.0 0.0 0.0
1999 8538 0.0 0.0 0.0
2000 8414 0.0 0.0 0.0
2001 8589 0.0 0.0 0.0
2002 8509 0.0 0.0 0.0
2003 7995 0.0 0.0 0.0
2004 8683 0.0 0.0 0.0
2005 8647 0.0 0.0 0.0
2006 8479 0.0 0.0 0.0
2007 8351 0.0 0.0 0.0
2008 7679 0.0 0.0 0.0
2009 8711 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8303 0.0 0.0 0.0
2012 8591 0.0 0.0 0.0
2013 8566 0.0 0.0 0.0
2014 7543 0.0 0.0 0.0
2015 6816 0.0 0.0 0.0
2016 7943 0.0 0.0 0.0
2017 8335 0.0 0.0 0.0
2018 8541 0.0 0.0 0.0
2019 8656 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References