X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0475162703000

Well Details

Well ID: 0475162703000
Loading map...
Location: 00/03-27-047-16W5/0
Location Alias: 00/03-27-47-16 W5M
Location Alias 2: 00/03-27-047-16 W5/00
Country: Canada
Province: Alberta
Township: 047
Meridian: 5
Range: 16
Section: 27
County/Municipality: Yellowhead County
Well Name: CVE PECO 3-27-47-16
Operator Name: Cenovus Energy Inc.
License Number: 0113125
License Date: 1985-02-04
License Status: Abandoned
Spud Date: 1985-03-13
Final Drill Date: 1985-06-24
Well Total Depth: 4070.00 m
Surface Hole Latitude: 53.076811
Surface Hole Longitude: -116.261527

For data sources see[1][2]

Well History

Date Event
1985-02-04 Obtained License
1985-03-17 Surface Casing Operation Performed
1985-04-13 Intermediate Casing Operation Performed
1985-05-01 Well Log Performed
1985-05-23 Well Log Performed
1985-05-28 Production Casing Operation Performed
1985-06-03 Well Log Performed
1985-06-07 Well Log Performed
1985-06-18 Lost Circulation Occurred
1985-06-24 Finished Drilling
1985-06-25 Well Log Performed
1985-06-26 Plug Back Performed
1985-06-27 Plug Back Performed
1985-07-01 Rig Released
1985-07-01 Well Mode changed to Drilled and Cased
1989-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-02-15 Well Log Performed
1989-02-16 Well Log Performed
1989-02-17 Perforation Treatment Performed - Jet Perforation
1989-02-18 Perforation Treatment Performed - Cement Squeeze
1989-02-21 Perforation Treatment Performed - Jet Perforation
1989-02-21 Well Log Performed
1989-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-28 Perforation Treatment Performed - Cement Squeeze
1989-03-06 Well Log Performed
1989-03-08 Perforation Treatment Performed - Jet Perforation
1989-03-08 Well Log Performed
1989-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-03-18 Well Log Performed
1989-03-20 Perforation Treatment Performed - Cement Squeeze
1989-03-24 Perforation Treatment Performed - Jet Perforation
1989-03-24 Well Log Performed
1989-03-26 Well Log Performed
1989-03-30 Perforation Treatment Performed - Fractured
1989-04-04 Well Log Performed
1989-04-07 Perforation Treatment Performed - Cement Plug
1989-04-07 Plug Back Performed
1995-03-27 Perforation Treatment Performed - Chemical Squeeze
1995-03-27 Perforation Treatment Performed - Jet Perforation
2003-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-11 Perforation Treatment Performed - Jet Perforation
2003-03-11 Plug Back Performed
2003-03-11 Well Log Performed
2003-03-13 Perforation Treatment Performed - Cement Squeeze
2003-03-13 Plug Back Performed
2003-03-14 Well Log Performed
2003-03-16 Perforation Treatment Performed - Jet Perforation
2003-03-16 Well Log Performed
2003-03-18 Perforation Treatment Performed - Cement Squeeze
2003-03-18 Plug Back Performed
2003-03-19 Perforation Treatment Performed - Jet Perforation
2003-03-19 Well Log Performed
2003-03-20 Perforation Treatment Performed - Cement Squeeze
2003-03-20 Plug Back Performed
2003-03-20 Well Mode changed to Abandoned Zone
2003-03-21 Well Log Performed
2003-03-27 Well Abandoned
2003-03-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-01-29 Packing Device Capped w/Cement 3782.00 3782.00 0
1989-03-08 Perforation 3284.50 3287.00 16
1989-03-08 Perforation 3290.00 3299.00 16
1989-03-12 Acid Treatment 3284.50 3299.00 0
1989-03-20 Cement Squeeze 3284.50 3299.00 0
1989-03-24 Perforation 3290.00 3299.00 16
1989-03-30 Fracture 3290.00 3299.00 0
1989-04-07 Cement Plug 3236.00 3312.00 0
1995-03-27 Perforation 3192.00 3197.00 20
1995-03-27 Chemical Squeeze 3192.00 3197.00 0
2003-03-11 Packing Device Capped w/Cement 3149.00 3157.00 0
1989-02-15 Packing Device Capped w/Cement 3337.00 3345.00 0
2003-03-11 Perforation 1100.00 1101.00 21
2003-03-13 Cement Squeeze 1100.00 1101.00 0
2003-03-16 Perforation 849.00 849.50 17
2003-03-18 Cement Squeeze 849.00 849.50 0
2003-03-19 Perforation 600.00 600.50 17
2003-03-20 Cement Squeeze 600.00 600.50 0
1989-02-17 Perforation 3302.00 3303.00 7
1989-02-17 Perforation 3319.00 3320.00 7
1989-02-18 Cement Squeeze 3302.00 3320.00 0
1989-02-21 Perforation 3252.00 3253.00 7
1989-02-21 Perforation 3268.00 3269.00 7
1989-02-28 Acid Treatment 3252.00 3269.00 0
1989-02-28 Cement Squeeze 3252.00 3269.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-06-18 Lost Circulation 3993.00 4001.00

For data sources see[5]

References