X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484270906000

Well Details

Well ID: 0484270906000
Loading map...
Location: 00/06-09-048-27W4/0
Location Alias: 00/06-09-48-27 W4M
Location Alias 2: 00/06-09-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 09
County/Municipality: Leduc County
Well Name: ESSO WIZARD LAKE C.P.R. NO. G-12
Operator Name: Imperial Oil Resources Limited
License Number: 0007058
License Date: 1953-09-15
License Status: Abandoned
Spud Date: 1953-09-22
Final Drill Date: 1953-10-18
Well Total Depth: 2045.00 m
Surface Hole Latitude: 53.125050
Surface Hole Longitude: -113.893582

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-09-15 Obtained License
1953-10-15 Production Casing Operation Performed
1953-10-18 Finished Drilling
1953-10-18 Perforation Treatment Performed - Open-Hole Completion
1953-10-18 Well Mode changed to Drilled and Cased
1953-10-22 Well Began Production
1953-10-22 Well Fluid changed to Crude Oil
1953-10-22 Well Mode changed to Flowing
1981-05-28 Perforation Treatment Performed - Chemical Squeeze
1981-05-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-05 Well Log Performed
1985-08-08 Well Log Performed
1985-08-12 Liner Casing Operation Performed
1985-08-12 Perforation Treatment Performed - Cement Squeeze
1985-08-12 Perforation Treatment Performed - Open-Hole Completion
1985-08-15 Well Log Performed
1985-08-16 Perforation Treatment Performed - Jet Perforation
1985-08-16 Well Log Performed
1985-08-17 Perforation Treatment Performed - Acid Wash - No Pressure
1988-09-14 Perforation Treatment Performed - Cement Squeeze
1988-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-16 Perforation Treatment Performed - Jet Perforation
1988-09-16 Well Log Performed
1988-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-09 Well Log Performed
1992-07-14 Perforation Treatment Performed - Jet Perforation
1992-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-28 Perforation Treatment Performed - Cement Squeeze
1995-08-01 Perforation Treatment Performed - Cement Squeeze
1995-08-04 Perforation Treatment Performed - Cement Squeeze
1995-08-06 Perforation Treatment Performed - Jet Perforation
1995-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-09-01 Perforation Treatment Performed - Jet Perforation
1995-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-02-01 Well Fluid changed to Crude Oil
2004-02-01 Well Mode changed to Suspended
2012-08-25 Well Log Performed
2012-08-26 Well Log Performed
2012-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-27 Perforation Treatment Performed - Cement Plug
2012-08-27 Perforation Treatment Performed - Jet Perforation
2012-08-27 Perforation Treatment Performed - Remedial Casing
2012-08-27 Plug Back Performed
2012-08-27 Well Fluid changed to Crude Oil
2012-08-27 Well Mode changed to Abandoned Zone
2012-08-28 Perforation Treatment Performed - Jet Perforation
2012-08-28 Well Log Performed
2012-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-29 Perforation Treatment Performed - Remedial Casing
2012-08-30 Perforation Treatment Performed - Jet Perforation
2012-08-30 Well Log Performed
2012-09-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-04 Perforation Treatment Performed - Cement Plug
2012-09-04 Perforation Treatment Performed - Remedial Casing
2013-05-23 Well Abandoned
2013-05-23 Well Fluid changed to Crude Oil
2013-05-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-10-18 Open Hole/Barefoot Completion 1958.30 2017.80 0
1988-09-16 Perforation 2016.30 2017.30 14
1988-09-16 Acid Treatment 1970.00 1970.50 0
1988-09-21 Acid Treatment 2016.30 2017.30 0
1992-07-14 Perforation 2023.00 2023.50 20
1992-07-14 Perforation 2026.50 2027.00 20
1992-07-16 Acid Treatment 2023.00 2023.50 0
1992-07-31 Acid Treatment 2023.00 2023.50 0
1992-11-10 Acid Treatment 1970.00 1970.50 0
1995-07-28 Cement Squeeze 1970.00 1970.50 0
1995-08-01 Cement Squeeze 2016.30 2027.00 0
1981-05-28 Chemical Squeeze 1958.30 2017.80 0
1995-08-04 Cement Squeeze 2016.30 2027.00 0
1995-08-06 Perforation 1981.00 1981.50 20
1995-08-06 Perforation 2026.50 2027.00 20
1995-08-07 Acid Treatment 2026.50 2027.00 0
1995-08-07 Acid Treatment 1981.00 1981.50 0
1995-08-17 Acid Treatment 2026.00 2027.00 0
1995-09-01 Perforation 2027.10 2028.10 13
1995-09-03 Acid Treatment 2026.00 2028.10 0
2012-08-27 Packing Device Capped w/Cement 856.00 1965.00 0
2012-08-27 Perforation 769.30 770.30 17
1981-05-29 Acid Treatment 1958.30 2017.80 0
2012-08-27 Perforation 752.00 753.00 17
2012-08-27 Remedial Casing Cementing 752.00 770.30 0
2012-08-27 Cement Plug 592.00 856.00 0
2012-08-28 Perforation 502.00 503.00 17
2012-08-29 Remedial Casing Cementing 502.00 503.00 0
2012-08-29 Packing Device Capped w/Cement 478.00 493.00 0
2012-08-30 Perforation 435.00 436.00 17
2012-08-30 Perforation 399.00 400.00 17
2012-08-30 Perforation 343.00 344.00 17
2012-08-30 Perforation 315.00 316.00 17
1985-08-12 Open Hole/Barefoot Completion 1958.30 2045.00 0
2012-08-30 Perforation 233.00 234.00 17
2012-08-30 Perforation 204.00 205.00 17
2012-08-30 Perforation 196.00 197.00 17
2012-09-04 Remedial Casing Cementing 196.00 436.00 0
2012-09-04 Cement Plug 186.50 478.00 0
2012-09-04 Packing Device Capped w/Cement 164.50 186.00 0
1985-08-12 Cement Squeeze 1958.30 2045.00 0
1985-08-16 Perforation 2010.10 2010.60 13
1985-08-17 Acid Wash 2010.10 2010.60 0
1988-09-14 Cement Squeeze 2010.00 2010.60 0
1988-09-16 Perforation 1970.00 1970.50 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1970 1742 0.0 0.0 0.0
1971 1164 0.0 0.0 0.0
1972 919 0.0 0.0 0.0
1973 46 0.0 0.0 0.0
1977 1720 0.0 0.0 0.0
1978 4372 0.0 0.0 0.0
1979 7712 0.0 0.0 0.0
1980 8609 0.0 0.0 0.0
1981 8585 0.0 0.0 0.0
1982 7636 0.0 0.0 0.0
1983 7607 0.0 0.0 0.0
1984 8592 0.0 0.0 0.0
1985 8206 0.0 0.0 0.0
1986 8431 0.0 0.0 0.0
1987 8694 0.0 0.0 0.0
1988 8335 0.0 0.0 0.0
1989 8248 0.0 0.0 0.0
1990 8503 0.0 0.0 0.0
1991 8012 0.0 0.0 0.0
1992 7303 0.0 0.0 0.0
1993 6440 0.0 0.0 0.0
1994 4172 0.0 0.0 0.0
1995 3382 0.0 0.0 0.0
1996 6211 0.0 0.0 0.0
1997 8320 0.0 0.0 0.0
1998 8692 0.0 0.0 0.0
1999 8750 0.0 0.0 0.0
2000 7955 0.0 0.0 0.0
2001 8507 0.0 0.0 0.0
2002 8050 0.0 0.0 0.0
2003 3741 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-05 No Incident Encountered 0.00 0.00

For data sources see[6]

References