If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484270910000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.128656,"lon":-113.887574,"icon":""}]} |
Location: 00/10-09-048-27W4/0 | |
Location Alias: 00/10-09-48-27 W4M | |
Location Alias 2: 00/10-09-048-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 27 | |
Section: 09 | |
County/Municipality: Leduc County | |
Well Name: ESSO WIZARD LAKE CPR NO. G-7 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0005819 | |
License Date: 1952-12-13 | |
License Status: Abandoned | |
Spud Date: 1952-12-23 | |
Final Drill Date: 1953-01-26 | |
Well Total Depth: 2050.50 m | |
Surface Hole Latitude: 53.128656 | |
Surface Hole Longitude: -113.887574 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-12-13 | Obtained License |
1953-01-20 | Production Casing Operation Performed |
1953-01-26 | Finished Drilling |
1953-01-26 | Perforation Treatment Performed - Open-Hole Completion |
1953-01-26 | Well Mode changed to Drilled and Cased |
1953-01-30 | Well Began Production |
1953-01-30 | Well Fluid changed to Crude Oil |
1953-01-30 | Well Mode changed to Flowing |
1958-12-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1958-12-18 | Well Fluid changed to Crude Oil |
1958-12-18 | Well Mode changed to Abandoned Zone |
1958-12-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1958-12-19 | Perforation Treatment Performed - Jet Perforation |
1971-01-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1972-02-24 | Perforation Treatment Performed - Cement Squeeze |
1972-02-25 | Perforation Treatment Performed - Cement Squeeze |
1972-10-20 | Well Began Injection |
1972-10-20 | Well Fluid changed to Solvent |
1972-10-20 | Well Type changed to Injection |
1975-06-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-06-20 | Perforation Treatment Performed - Open-Hole Completion |
1976-05-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-03-11 | Well Log Performed |
1984-03-13 | Perforation Treatment Performed - Open-Hole Completion |
1984-03-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-05-14 | Well Log Performed |
1986-03-10 | Well Fluid changed to Gas |
1986-03-10 | Well Type changed to Injection |
1986-09-07 | Well Log Performed |
1988-02-27 | Well Log Performed |
1989-11-23 | Well Log Performed |
1991-05-16 | Well Log Performed |
1991-06-28 | Well Fluid changed to Solvent |
1991-06-28 | Well Type changed to Injection |
1992-10-20 | Perforation Treatment Performed - Open-Hole Completion |
1992-10-22 | Well Log Performed |
1992-10-24 | Well Log Performed |
1992-11-05 | Liner Casing Operation Performed |
1992-11-05 | Perforation Treatment Performed - Cement Squeeze |
1992-11-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-11-08 | Perforation Treatment Performed - Jet Perforation |
1992-11-08 | Well Log Performed |
1994-01-10 | Perforation Treatment Performed - Chemical Squeeze |
1994-01-12 | Perforation Treatment Performed - Jet Perforation |
1994-01-12 | Well Log Performed |
1994-01-13 | Perforation Treatment Performed - Cement Squeeze |
1994-01-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-01-15 | Perforation Treatment Performed - Jet Perforation |
1994-01-15 | Well Log Performed |
1997-05-13 | Perforation Treatment Performed - Jet Perforation |
1997-05-13 | Well Log Performed |
1997-06-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-11-01 | Well Fluid changed to Solvent |
1998-11-01 | Well Mode changed to Suspended |
1998-11-01 | Well Type changed to Injection |
2007-04-02 | Perforation Treatment Performed - Jet Perforation |
2007-04-03 | Perforation Treatment Performed - Jet Perforation |
2007-04-04 | Well Log Performed |
2007-05-07 | Well Fluid changed to Crude Oil |
2007-05-07 | Well Mode changed to Flowing |
2010-06-01 | Well Fluid changed to Crude Oil |
2010-06-01 | Well Mode changed to Suspended |
2011-10-26 | Well Log Performed |
2012-07-26 | Well Log Performed |
2012-07-31 | Well Log Performed |
2012-08-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-08-01 | Perforation Treatment Performed - Jet Perforation |
2012-08-01 | Plug Back Performed |
2012-08-01 | Well Fluid changed to Crude Oil |
2012-08-01 | Well Mode changed to Abandoned Zone |
2012-08-04 | Perforation Treatment Performed - Remedial Casing |
2012-08-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-08-05 | Perforation Treatment Performed - Jet Perforation |
2012-08-05 | Perforation Treatment Performed - Remedial Casing |
2012-08-05 | Well Log Performed |
2012-08-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-08-08 | Perforation Treatment Performed - Jet Perforation |
2012-08-08 | Perforation Treatment Performed - Remedial Casing |
2012-08-08 | Well Log Performed |
2012-08-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-08-14 | Perforation Treatment Performed - Cement Plug |
2013-05-16 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1953-01-26 | Open Hole/Barefoot Completion | 1870.60 | 2017.80 | 0 |
1976-05-19 | Acid Treatment | 1870.60 | 2017.80 | 0 |
1984-03-13 | Open Hole/Barefoot Completion | 1870.60 | 2045.00 | 0 |
1984-03-21 | Acid Treatment | 1870.60 | 2045.00 | 0 |
1992-10-20 | Open Hole/Barefoot Completion | 1870.60 | 2050.50 | 0 |
1992-11-05 | Cement Squeeze | 1870.60 | 2050.50 | 0 |
1992-11-08 | Perforation | 2012.00 | 2014.00 | 20 |
1992-11-08 | Perforation | 2017.00 | 2019.00 | 20 |
1992-11-08 | Perforation | 2021.00 | 2023.00 | 20 |
1992-11-08 | Acid Treatment | 2012.00 | 2023.00 | 0 |
1994-01-10 | Chemical Squeeze | 2012.00 | 2023.00 | 0 |
1958-12-18 | Packing Device Capped w/Cement | 1837.90 | 1899.50 | 0 |
1994-01-12 | Perforation | 2012.00 | 2012.30 | 99 |
1994-01-12 | Perforation | 2013.70 | 2014.00 | 99 |
1994-01-12 | Perforation | 2018.70 | 2019.00 | 99 |
1994-01-13 | Cement Squeeze | 2012.00 | 2014.00 | 0 |
1994-01-15 | Perforation | 2012.00 | 2014.00 | 13 |
1994-01-15 | Acid Treatment | 2012.00 | 2014.00 | 0 |
1997-05-13 | Perforation | 2020.00 | 2022.00 | 20 |
1997-06-01 | Acid Treatment | 2020.00 | 2022.00 | 0 |
2007-04-02 | Perforation | 1871.00 | 1877.00 | 13 |
2007-04-02 | Perforation | 1881.50 | 1886.00 | 13 |
1958-12-19 | Perforation | 1781.90 | 1783.40 | 13 |
2007-04-03 | Perforation | 1902.50 | 1908.50 | 13 |
2007-04-03 | Perforation | 1925.00 | 1931.00 | 13 |
2012-08-01 | Packing Device Capped w/Cement | 803.00 | 1865.00 | 0 |
2012-08-01 | Perforation | 724.00 | 725.00 | 17 |
2012-08-04 | Remedial Casing Cementing | 724.00 | 725.00 | 0 |
2012-08-05 | Packing Device Capped w/Cement | 478.50 | 498.00 | 0 |
2012-08-05 | Perforation | 490.90 | 491.90 | 17 |
2012-08-05 | Remedial Casing Cementing | 490.90 | 491.90 | 0 |
2012-08-07 | Packing Device Capped w/Cement | 469.50 | 478.20 | 0 |
2012-08-08 | Perforation | 429.00 | 430.00 | 17 |
1958-12-19 | Acid Treatment | 1781.90 | 1783.40 | 0 |
2012-08-08 | Perforation | 370.00 | 371.00 | 17 |
2012-08-08 | Perforation | 316.00 | 317.00 | 17 |
2012-08-08 | Perforation | 280.00 | 281.00 | 17 |
2012-08-08 | Perforation | 254.50 | 255.50 | 17 |
2012-08-08 | Perforation | 226.00 | 227.00 | 17 |
2012-08-08 | Perforation | 205.00 | 206.00 | 17 |
2012-08-08 | Perforation | 199.00 | 200.00 | 17 |
2012-08-08 | Remedial Casing Cementing | 199.00 | 430.00 | 0 |
2012-08-14 | Cement Plug | 21.60 | 469.00 | 0 |
2012-08-14 | Packing Device Capped w/Cement | 11.00 | 21.00 | 0 |
1971-01-28 | Acid Treatment | 1781.90 | 1783.40 | 0 |
1972-02-24 | Cement Squeeze | 1781.90 | 1783.40 | 0 |
1972-02-25 | Cement Squeeze | 1781.90 | 1783.40 | 0 |
1975-06-20 | Open Hole/Barefoot Completion | 1870.60 | 2017.80 | 0 |
1975-06-20 | Acid Treatment | 1870.60 | 2017.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1974 | 0 | 0.0 | 0.0 | 0.0 |
1975 | 0 | 0.0 | 0.0 | 0.0 |
1976 | 0 | 0.0 | 0.0 | 0.0 |
1977 | 0 | 0.0 | 0.0 | 0.0 |
1978 | 0 | 0.0 | 0.0 | 0.0 |
1979 | 0 | 0.0 | 0.0 | 0.0 |
1980 | 0 | 0.0 | 0.0 | 0.0 |
1981 | 0 | 0.0 | 0.0 | 0.0 |
1982 | 0 | 0.0 | 0.0 | 0.0 |
1983 | 0 | 0.0 | 0.0 | 0.0 |
1984 | 0 | 0.0 | 0.0 | 0.0 |
1985 | 0 | 0.0 | 0.0 | 0.0 |
1986 | 0 | 0.0 | 0.0 | 0.0 |
1987 | 0 | 0.0 | 0.0 | 0.0 |
1988 | 0 | 0.0 | 0.0 | 0.0 |
1989 | 0 | 0.0 | 0.0 | 0.0 |
1990 | 0 | 0.0 | 0.0 | 0.0 |
1991 | 0 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
2007 | 5130 | 0.0 | 0.0 | 0.0 |
2008 | 4647 | 0.0 | 0.0 | 0.0 |
2009 | 72 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]