X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484271504000

Well Details

Well ID: 0484271504000
Loading map...
Location: 00/04-15-048-27W4/0
Location Alias: 00/04-15-48-27 W4M
Location Alias 2: 00/04-15-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 15
County/Municipality: Leduc County
Well Name: ESSO WIZARD LAKE CPR NO. F-2
Operator Name: Imperial Oil Resources Limited
License Number: 0005069
License Date: 1952-07-26
License Status: Abandoned
Spud Date: 1952-07-30
Final Drill Date: 1952-08-27
Well Total Depth: 2045.00 m
Surface Hole Latitude: 53.136077
Surface Hole Longitude: -113.875249

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-07-26 Obtained License
1952-08-25 Production Casing Operation Performed
1952-08-27 Finished Drilling
1952-08-27 Perforation Treatment Performed - Open-Hole Completion
1952-08-27 Well Mode changed to Drilled and Cased
1952-08-30 Well Began Production
1952-08-30 Well Fluid changed to Crude Oil
1952-08-30 Well Mode changed to Flowing
1970-07-22 Well Fluid changed to Crude Oil
1970-07-22 Well Mode changed to Suspended
1984-06-13 Well Log Performed
1984-06-23 Perforation Treatment Performed - Open-Hole Completion
1984-06-23 Well Log Performed
1987-11-26 Well Fluid changed to Crude Oil
1987-11-26 Well Mode changed to Pumping
1989-08-11 Well Log Performed
1989-10-01 Well Fluid changed to Crude Oil
1989-10-01 Well Mode changed to Gas Lift
1989-10-09 Well Log Performed
1989-10-15 Perforation Treatment Performed - Open-Hole Completion
1989-10-18 Liner Casing Operation Performed
1989-10-18 Perforation Treatment Performed - Cement Squeeze
1989-10-20 Well Log Performed
1989-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-10-22 Perforation Treatment Performed - Jet Perforation
1989-10-22 Well Log Performed
1989-10-23 Well Log Performed
1992-12-01 Perforation Treatment Performed - Jet Perforation
1992-12-01 Well Log Performed
1992-12-02 Well Log Performed
2004-02-01 Well Fluid changed to Crude Oil
2004-02-01 Well Mode changed to Suspended
2012-07-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-03 Perforation Treatment Performed - Jet Perforation
2012-07-03 Plug Back Performed
2012-07-03 Well Fluid changed to Crude Oil
2012-07-03 Well Log Performed
2012-07-03 Well Mode changed to Abandoned Zone
2012-07-05 Perforation Treatment Performed - Cement Plug
2012-07-05 Perforation Treatment Performed - Remedial Casing
2012-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-07 Perforation Treatment Performed - Jet Perforation
2012-07-07 Perforation Treatment Performed - Remedial Casing
2012-07-07 Well Log Performed
2012-07-09 Perforation Treatment Performed - Jet Perforation
2012-07-09 Well Log Performed
2012-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-10 Perforation Treatment Performed - Cement Plug
2012-07-10 Perforation Treatment Performed - Remedial Casing
2013-06-11 Well Abandoned
2013-06-11 Well Fluid changed to Crude Oil
2013-06-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-08-27 Open Hole/Barefoot Completion 1999.80 2008.60 0
2012-07-03 Packing Device Capped w/Cement 1377.00 2002.00 0
2012-07-03 Perforation 1274.70 1275.70 17
2012-07-03 Perforation 738.00 739.00 17
2012-07-05 Remedial Casing Cementing 738.00 1275.70 0
2012-07-05 Cement Plug 536.00 1377.00 0
2012-07-07 Perforation 477.60 478.60 17
2012-07-07 Remedial Casing Cementing 477.60 478.60 0
2012-07-07 Packing Device Capped w/Cement 447.00 465.00 0
2012-07-09 Perforation 416.00 417.00 17
2012-07-09 Perforation 342.00 343.00 17
1984-06-23 Open Hole/Barefoot Completion 1999.80 2034.00 0
2012-07-09 Perforation 315.00 316.00 17
2012-07-09 Perforation 270.00 271.00 17
2012-07-09 Perforation 247.00 248.00 17
2012-07-09 Perforation 226.00 227.00 17
2012-07-09 Perforation 206.00 207.00 17
2012-07-10 Remedial Casing Cementing 206.00 417.00 0
2012-07-10 Cement Plug 207.00 447.00 0
2012-07-10 Packing Device Capped w/Cement 192.00 201.60 0
1989-10-15 Open Hole/Barefoot Completion 1999.80 2045.00 0
1989-10-18 Cement Squeeze 1998.80 2045.00 0
1989-10-22 Perforation 2007.50 2008.50 20
1989-10-22 Perforation 2012.50 2013.50 20
1989-10-22 Acid Treatment 2007.50 2013.50 0
1992-12-01 Perforation 2016.00 2016.50 20
1992-12-01 Perforation 2019.00 2019.50 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1987 422 0.0 0.0 0.0
1988 3791 0.0 0.0 0.0
1990 7874 0.0 0.0 0.0
1991 8003 0.0 0.0 0.0
1992 7245 0.0 0.0 0.0
1993 715 0.0 0.0 0.0
1994 4944 0.0 0.0 0.0
1995 5151 0.0 0.0 0.0
1996 8728 0.0 0.0 0.0
1997 8362 0.0 0.0 0.0
1998 8078 0.0 0.0 0.0
1999 8512 0.0 0.0 0.0
2000 7215 0.0 0.0 0.0
2001 4800 0.0 0.0 0.0
2002 6499 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-11 No Incident Encountered 0.00 0.00

For data sources see[6]

References