X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484271602000

Well Details

Well ID: 0484271602000
Loading map...
Location: 00/02-16-048-27W4/0
Location Alias: 00/02-16-48-27 W4M
Location Alias 2: 00/02-16-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 16
County/Municipality: Leduc County
Well Name: ESSO WIZARD LAKE NO C-8
Operator Name: Imperial Oil Resources Limited
License Number: 0005367
License Date: 1952-09-25
License Status: Abandoned
Spud Date: 1952-10-14
Final Drill Date: 1952-11-11
Well Total Depth: 2044.90 m
Surface Hole Latitude: 53.136073
Surface Hole Longitude: -113.887582

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-09-25 Obtained License
1952-11-07 Production Casing Operation Performed
1952-11-11 Finished Drilling
1952-11-11 Perforation Treatment Performed - Open-Hole Completion
1952-11-11 Well Mode changed to Drilled and Cased
1952-11-14 Well Began Production
1952-11-14 Well Fluid changed to Crude Oil
1952-11-14 Well Mode changed to Flowing
1970-12-08 Perforation Treatment Performed - Acid Wash - No Pressure
1972-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-01 Well Log Performed
1984-02-02 Perforation Treatment Performed - Open-Hole Completion
1984-02-03 Well Log Performed
1985-06-20 Perforation Treatment Performed - Open-Hole Completion
1985-06-26 Liner Casing Operation Performed
1985-06-26 Perforation Treatment Performed - Cement Squeeze
1985-06-29 Well Log Performed
1985-07-01 Perforation Treatment Performed - Jet Perforation
1985-07-01 Well Log Performed
1985-07-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-24 Perforation Treatment Performed - Cement Squeeze
1988-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-27 Perforation Treatment Performed - Jet Perforation
1992-01-09 Well Log Performed
1992-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-21 Perforation Treatment Performed - Jet Perforation
1997-09-04 Perforation Treatment Performed - Jet Perforation
2003-06-16 Well Log Performed
2003-06-24 Perforation Treatment Performed - Jet Perforation
2003-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-06-14 Perforation Treatment Performed - Casing Patch (Over Perfs)
2006-03-28 Perforation Treatment Performed - Jet Perforation
2006-03-28 Well Log Performed
2006-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-10-02 Perforation Treatment Performed - Jet Perforation
2006-10-02 Well Log Performed
2006-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-03-20 Perforation Treatment Performed - Jet Perforation
2007-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-03-28 Perforation Treatment Performed - Jet Perforation
2007-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-06-12 Perforation Treatment Performed - Jet Perforation
2007-06-12 Well Log Performed
2007-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-10-17 Well Log Performed
2010-06-01 Well Fluid changed to Crude Oil
2010-06-01 Well Mode changed to Suspended
2013-09-16 Well Log Performed
2013-09-17 Well Log Performed
2013-09-18 Well Log Performed
2013-09-26 Perforation Treatment Performed - Jet Perforation
2013-09-26 Well Log Performed
2013-09-28 Perforation Treatment Performed - Cement Plug
2013-09-28 Perforation Treatment Performed - Remedial Casing
2013-09-28 Plug Back Performed
2013-09-28 Well Fluid changed to Crude Oil
2013-09-28 Well Mode changed to Abandoned Zone
2013-09-29 Perforation Treatment Performed - Cement Plug
2013-09-30 Perforation Treatment Performed - Jet Perforation
2013-09-30 Well Log Performed
2013-10-01 Perforation Treatment Performed - Cement Plug
2013-10-01 Perforation Treatment Performed - Remedial Casing
2013-10-02 Perforation Treatment Performed - Cement Plug
2013-10-02 Perforation Treatment Performed - Jet Perforation
2013-10-02 Perforation Treatment Performed - Remedial Casing
2013-10-02 Well Log Performed
2014-12-13 Well Abandoned
2014-12-13 Well Fluid changed to Crude Oil
2014-12-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-11-11 Open Hole/Barefoot Completion 1851.10 1927.90 0
1988-10-27 Perforation 1935.60 1936.10 14
1988-10-27 Perforation 2009.80 2010.80 14
1988-10-27 Acid Treatment 1935.60 1936.10 0
1992-01-21 Acid Treatment 1935.60 1936.10 0
1992-01-21 Perforation 2016.00 2016.50 20
1992-01-21 Perforation 2019.50 2020.00 20
1997-09-04 Perforation 2022.60 2023.00 20
2003-06-24 Perforation 1992.50 1997.50 13
2003-06-26 Acid Treatment 1935.60 1997.50 0
2005-06-14 Casing Patch 1935.60 1936.10 0
1970-12-08 Acid Wash 1851.10 1927.90 0
2006-03-28 Perforation 1961.00 1967.00 20
2006-03-29 Acid Treatment 1961.00 1967.00 0
2006-10-02 Perforation 1935.00 1941.00 13
2006-10-03 Acid Treatment 1935.00 1941.00 0
2007-03-20 Perforation 1913.00 1919.00 13
2007-03-21 Acid Treatment 1913.00 1919.00 0
2007-03-28 Perforation 1922.00 1926.00 13
2007-03-29 Acid Treatment 1922.00 1926.00 0
2007-06-12 Perforation 1888.00 1894.00 20
2007-06-13 Acid Treatment 1888.00 1894.00 0
1972-09-29 Acid Treatment 1850.10 1927.90 0
2013-09-26 Perforation 1491.70 1492.70 17
2013-09-26 Perforation 1450.80 1451.80 17
2013-09-26 Perforation 1273.50 1274.50 17
2013-09-26 Perforation 732.00 733.00 17
2013-09-26 Perforation 474.90 475.90 17
2013-09-28 Remedial Casing Cementing 474.90 1492.70 0
2013-09-28 Cement Plug 1494.00 1845.00 0
2013-09-29 Cement Plug 465.40 1494.00 0
2013-09-30 Perforation 442.00 443.00 17
2013-09-30 Perforation 416.00 417.00 17
1984-02-02 Open Hole/Barefoot Completion 1851.10 2034.00 0
2013-09-30 Perforation 392.00 393.00 17
2013-09-30 Perforation 335.00 336.00 17
2013-09-30 Perforation 325.00 326.00 17
2013-09-30 Perforation 296.00 297.00 17
2013-09-30 Perforation 265.00 266.00 17
2013-09-30 Perforation 234.00 235.00 17
2013-09-30 Perforation 206.00 207.00 17
2013-09-30 Perforation 200.00 201.00 17
2013-10-01 Remedial Casing Cementing 200.00 443.00 0
2013-10-01 Cement Plug 201.00 465.00 0
1985-06-20 Open Hole/Barefoot Completion 1851.10 2044.90 0
2013-10-02 Perforation 183.00 183.20 12
2013-10-02 Remedial Casing Cementing 183.00 183.20 0
2013-10-02 Cement Plug 183.20 195.00 0
2013-10-02 Cement Plug 164.00 173.00 0
1985-06-26 Cement Squeeze 1851.10 2044.90 0
1985-07-01 Perforation 2003.70 2004.20 13
1985-07-02 Acid Treatment 2003.70 2004.20 0
1988-10-24 Cement Squeeze 2003.70 2004.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4849 0.0 0.0 0.0
1968 4593 0.0 0.0 0.0
1969 7536 0.0 0.0 0.0
1970 7528 0.0 0.0 0.0
1971 7372 0.0 0.0 0.0
1972 7445 0.0 0.0 0.0
1973 8317 0.0 0.0 0.0
1974 6982 0.0 0.0 0.0
1975 5449 0.0 0.0 0.0
1976 3751 0.0 0.0 0.0
1977 4614 0.0 0.0 0.0
1978 4663 0.0 0.0 0.0
1979 7308 0.0 0.0 0.0
1980 7929 0.0 0.0 0.0
1981 7482 0.0 0.0 0.0
1982 5021 0.0 0.0 0.0
1983 6804 0.0 0.0 0.0
1984 7909 0.0 0.0 0.0
1985 8076 0.0 0.0 0.0
1986 8395 0.0 0.0 0.0
1987 8341 0.0 0.0 0.0
1988 7383 0.0 0.0 0.0
1989 8274 0.0 0.0 0.0
1990 8516 0.0 0.0 0.0
1991 6754 0.0 0.0 0.0
1992 6908 0.0 0.0 0.0
1993 7462 0.0 0.0 0.0
1994 8415 0.0 0.0 0.0
1995 8523 0.0 0.0 0.0
1996 8512 0.0 0.0 0.0
1997 7581 0.0 0.0 0.0
1998 8748 0.0 0.0 0.0
1999 8711 0.0 0.0 0.0
2000 8206 0.0 0.0 0.0
2001 6187 0.0 0.0 0.0
2002 6211 0.0 0.0 0.0
2003 5475 0.0 0.0 0.0
2004 8663 0.0 0.0 0.0
2005 8510 0.0 0.0 0.0
2006 8576 0.0 0.0 0.0
2007 8451 0.0 0.0 0.0
2008 4060 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-10-03 No Incident Encountered 0.00 0.00

For data sources see[6]

References