X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484271603000

Well Details

Well ID: 0484271603000
Loading map...
Location: 00/03-16-048-27W4/0
Location Alias: 00/03-16-48-27 W4M
Location Alias 2: 00/03-16-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 16
County/Municipality: Leduc County
Well Name: ESSO WIZARD LAKE C-5
Operator Name: Imperial Oil Resources Limited
License Number: 0005786
License Date: 1952-12-08
License Status: Abandoned
Spud Date: 1953-01-05
Final Drill Date: 1953-02-08
Well Total Depth: 2035.00 m
Surface Hole Latitude: 53.135907
Surface Hole Longitude: -113.893594

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-12-08 Obtained License
1953-02-05 Production Casing Operation Performed
1953-02-08 Finished Drilling
1953-02-08 Perforation Treatment Performed - Open-Hole Completion
1953-02-08 Well Mode changed to Drilled and Cased
1953-02-10 Well Began Production
1953-02-10 Well Fluid changed to Crude Oil
1953-02-10 Well Mode changed to Flowing
1971-02-01 Perforation Treatment Performed - Fractured
1971-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-11-04 Perforation Treatment Performed - Fractured
1988-05-27 Well Log Performed
1988-07-07 Perforation Treatment Performed - Open-Hole Completion
1990-08-23 Well Log Performed
1991-05-21 Well Log Performed
1992-07-13 Well Log Performed
1992-07-22 Well Log Performed
1997-05-18 Well Log Performed
2004-03-01 Well Fluid changed to Crude Oil
2004-03-01 Well Mode changed to Suspended
2010-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-26 Plug Back Performed
2010-11-26 Well Fluid changed to Crude Oil
2010-11-26 Well Log Performed
2010-11-26 Well Mode changed to Abandoned Zone
2010-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-27 Perforation Treatment Performed - Jet Perforation
2010-11-27 Perforation Treatment Performed - Remedial Casing
2010-11-27 Well Log Performed
2010-11-28 Perforation Treatment Performed - Jet Perforation
2010-11-28 Well Log Performed
2010-11-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-29 Perforation Treatment Performed - Remedial Casing
2010-11-30 Perforation Treatment Performed - Jet Perforation
2010-11-30 Well Log Performed
2010-12-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-12-01 Perforation Treatment Performed - Remedial Casing
2010-12-02 Perforation Treatment Performed - Jet Perforation
2010-12-02 Well Log Performed
2010-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-12-03 Perforation Treatment Performed - Remedial Casing
2011-11-09 Well Abandoned
2011-11-09 Well Fluid changed to Crude Oil
2011-11-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-02-08 Open Hole/Barefoot Completion 1968.40 2011.70 0
2010-11-27 Packing Device Capped w/Cement 1310.00 1320.00 0
2010-11-28 Perforation 731.00 732.00 17
2010-11-29 Remedial Casing Cementing 731.00 732.00 0
2010-11-29 Packing Device Capped w/Cement 714.00 724.00 0
2010-11-30 Perforation 478.00 479.00 17
2010-12-01 Remedial Casing Cementing 478.00 479.00 0
2010-12-01 Packing Device Capped w/Cement 458.00 468.00 0
2010-12-02 Perforation 226.00 227.00 17
2010-12-03 Remedial Casing Cementing 226.00 227.00 0
2010-12-03 Packing Device Capped w/Cement 209.00 218.00 0
1971-02-01 Fracture 1968.40 2011.70 0
1971-02-02 Acid Treatment 1968.40 2011.70 0
1972-11-04 Fracture 1968.40 2011.70 0
1972-11-04 Acid Treatment 1968.40 2011.70 0
1988-07-07 Open Hole/Barefoot Completion 1968.40 2035.00 0
2010-11-26 Packing Device Capped w/Cement 1416.00 1890.00 0
2010-11-27 Perforation 1330.00 1331.00 17
2010-11-27 Remedial Casing Cementing 1330.00 1331.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6356 0.0 0.0 0.0
1968 6927 0.0 0.0 0.0
1969 5888 0.0 0.0 0.0
1970 4917 0.0 0.0 0.0
1971 4929 0.0 0.0 0.0
1972 5649 0.0 0.0 0.0
1973 2474 0.0 0.0 0.0
1974 3562 0.0 0.0 0.0
1975 5035 0.0 0.0 0.0
1976 3811 0.0 0.0 0.0
1977 5277 0.0 0.0 0.0
1978 4826 0.0 0.0 0.0
1979 6139 0.0 0.0 0.0
1980 7486 0.0 0.0 0.0
1981 7787 0.0 0.0 0.0
1982 5621 0.0 0.0 0.0
1983 6730 0.0 0.0 0.0
1984 8020 0.0 0.0 0.0
1985 7503 0.0 0.0 0.0
1986 4766 0.0 0.0 0.0
1987 1341 0.0 0.0 0.0
1988 2736 0.0 0.0 0.0
1989 8298 0.0 0.0 0.0
1990 7039 0.0 0.0 0.0
1991 7388 0.0 0.0 0.0
1992 7712 0.0 0.0 0.0
1993 6310 0.0 0.0 0.0
1994 7340 0.0 0.0 0.0
1995 6517 0.0 0.0 0.0
1996 6484 0.0 0.0 0.0
1997 6856 0.0 0.0 0.0
1998 7163 0.0 0.0 0.0
1999 24 0.0 0.0 0.0
2000 96 0.0 0.0 0.0

For data sources see[5]

References