X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484271607000

Well Details

Well ID: 0484271607000
Loading map...
Location: 00/07-16-048-27W4/0
Location Alias: 00/07-16-48-27 W4M
Location Alias 2: 00/07-16-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 16
County/Municipality: Leduc County
Well Name: ESSO C7 WIZARD 7-16MU-48-27
Operator Name: Imperial Oil Resources Limited
License Number: 0004748
License Date: 1952-06-02
License Status: Abandoned
Spud Date: 1953-08-08
Final Drill Date: 1953-09-15
Well Total Depth: 2047.00 m
Surface Hole Latitude: 53.139691
Surface Hole Longitude: -113.887586

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-06-02 Obtained License
1953-09-07 Production Casing Operation Performed
1953-09-15 Finished Drilling
1953-09-15 Perforation Treatment Performed - Open-Hole Completion
1953-09-15 Well Mode changed to Drilled and Cased
1953-09-18 Well Began Production
1953-09-18 Well Fluid changed to Crude Oil
1953-09-18 Well Log Performed
1953-09-18 Well Mode changed to Flowing
1953-09-25 Well Log Performed
1958-11-18 Perforation Treatment Performed - Bullet Perforation
1958-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-01-25 Well Fluid changed to Crude Oil
1959-01-25 Well Mode changed to Flowing
1962-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-02-28 Well Log Performed
1972-05-24 Well Log Performed
1972-05-25 Perforation Treatment Performed - Cement Squeeze
1972-05-25 Well Fluid changed to Crude Oil
1972-05-25 Well Mode changed to Flowing
1972-06-07 Perforation Treatment Performed - Acid Wash - No Pressure
1972-06-07 Well Type changed to Observation
1972-07-10 Well Log Performed
1972-11-13 Well Log Performed
1973-05-23 Well Log Performed
1973-11-24 Well Log Performed
1974-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-02-28 Well Log Performed
1974-03-29 Well Log Performed
1974-05-03 Well Log Performed
1974-05-29 Well Log Performed
1974-06-26 Well Log Performed
1974-07-29 Well Log Performed
1974-09-02 Well Log Performed
1974-10-01 Well Log Performed
1974-10-29 Well Log Performed
1975-03-06 Well Log Performed
1975-03-26 Well Log Performed
1975-06-06 Well Log Performed
1975-09-12 Well Log Performed
1975-11-20 Well Log Performed
1976-06-14 Well Log Performed
1976-11-23 Well Log Performed
1977-05-24 Well Log Performed
1977-12-07 Well Log Performed
1978-02-28 Well Log Performed
1978-05-23 Well Log Performed
1978-11-21 Well Log Performed
1980-08-07 Well Log Performed
1982-05-10 Well Log Performed
1982-08-24 Well Log Performed
1982-09-08 Well Log Performed
1982-11-06 Perforation Treatment Performed - Open-Hole Completion
1982-11-07 Well Log Performed
1982-11-08 Well Log Performed
1983-02-10 Well Fluid changed to Crude Oil
1983-02-10 Well Mode changed to Flowing
1983-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-08-03 Well Log Performed
1983-08-04 Well Log Performed
1984-05-11 Perforation Treatment Performed - Chemical Squeeze
1984-05-12 Perforation Treatment Performed - Fractured
1985-01-16 Well Log Performed
1985-01-17 Perforation Treatment Performed - Open-Hole Completion
1985-01-22 Liner Casing Operation Performed
1985-01-22 Perforation Treatment Performed - Cement Squeeze
1985-01-25 Well Log Performed
1985-02-05 Perforation Treatment Performed - Jet Perforation
1985-02-05 Well Log Performed
1985-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-06 Perforation Treatment Performed - Chemical Squeeze
1987-03-25 Perforation Treatment Performed - Chemical Squeeze
1987-08-24 Perforation Treatment Performed - Chemical Squeeze
1987-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-06 Perforation Treatment Performed - Cement Squeeze
1988-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-08 Perforation Treatment Performed - Jet Perforation
1988-02-08 Well Log Performed
1989-04-24 Perforation Treatment Performed - Chemical Squeeze
1989-08-22 Perforation Treatment Performed - Chemical Squeeze
1990-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-12 Perforation Treatment Performed - Cement Squeeze
1990-10-13 Perforation Treatment Performed - Jet Perforation
1990-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-14 Well Log Performed
1990-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-17 Perforation Treatment Performed - Cement Squeeze
1990-10-20 Perforation Treatment Performed - Jet Perforation
1990-10-20 Well Log Performed
1990-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-21 Well Log Performed
1990-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-23 Well Log Performed
1992-07-14 Well Log Performed
1997-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-10-14 Well Log Performed
2006-10-15 Perforation Treatment Performed - Jet Perforation
2006-10-16 Perforation Treatment Performed - Jet Perforation
2006-10-16 Well Log Performed
2006-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-06-01 Well Fluid changed to Crude Oil
2010-06-01 Well Mode changed to Suspended
2011-06-27 Well Log Performed
2011-09-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-17 Plug Back Performed
2011-09-17 Well Fluid changed to Crude Oil
2011-09-17 Well Mode changed to Abandoned Zone
2011-09-18 Perforation Treatment Performed - Jet Perforation
2011-09-18 Well Log Performed
2011-09-19 Perforation Treatment Performed - Jet Perforation
2011-09-21 Perforation Treatment Performed - Jet Perforation
2011-09-21 Perforation Treatment Performed - Remedial Casing
2011-09-21 Well Log Performed
2011-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-29 Perforation Treatment Performed - Remedial Casing
2011-09-30 Perforation Treatment Performed - Jet Perforation
2011-09-30 Well Log Performed
2011-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-10-01 Perforation Treatment Performed - Cement Plug
2011-10-01 Perforation Treatment Performed - Remedial Casing
2012-05-06 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-09-15 Open Hole/Barefoot Completion 1855.90 2008.60 0
1983-05-11 Acid Treatment 1855.90 2036.00 0
1984-05-11 Chemical Squeeze 1855.90 2036.00 0
1984-05-12 Fracture 1855.90 2036.00 0
1985-01-17 Open Hole/Barefoot Completion 1855.90 2047.00 0
1985-01-22 Cement Squeeze 1855.90 2047.00 0
1985-02-05 Perforation 1998.50 1999.00 13
1985-02-06 Chemical Squeeze 1998.50 1999.00 0
1985-02-06 Acid Treatment 1998.50 1999.00 0
1987-03-25 Chemical Squeeze 1998.50 1999.00 0
1987-08-24 Chemical Squeeze 1998.50 1999.00 0
1958-11-18 Bullet Perforation 1757.20 1763.00 13
1987-10-15 Acid Treatment 1998.50 1999.00 0
1988-02-06 Cement Squeeze 1998.50 1999.00 0
1988-02-08 Perforation 1878.00 1878.50 13
1988-02-08 Perforation 2005.90 2006.90 13
1988-02-08 Acid Treatment 1878.00 2006.90 0
1989-04-24 Chemical Squeeze 2005.90 2006.90 0
1989-08-22 Chemical Squeeze 2005.90 2006.90 0
1990-04-10 Acid Treatment 2005.90 2006.90 0
1990-10-12 Acid Treatment 1878.00 1878.50 0
1990-10-12 Cement Squeeze 1878.00 1878.50 0
1958-11-18 Bullet Perforation 1767.80 1770.90 13
1990-10-13 Perforation 1998.50 1999.00 13
1990-10-14 Acid Treatment 1998.50 1999.00 0
1990-10-17 Acid Treatment 1998.50 1999.00 0
1990-10-17 Cement Squeeze 1998.50 1999.00 0
1990-10-20 Perforation 1878.00 1878.50 7
1990-10-20 Perforation 2005.90 2006.90 13
1990-10-20 Perforation 2008.90 2009.90 13
1990-10-20 Perforation 2011.90 2012.90 13
1990-10-21 Acid Treatment 2005.90 2012.90 0
1990-10-22 Acid Treatment 1878.00 1878.50 0
1958-11-19 Acid Treatment 1757.20 1770.90 0
1997-09-17 Acid Treatment 1878.00 1878.50 0
2006-10-15 Perforation 1922.00 1928.00 13
2006-10-16 Perforation 1864.50 1868.50 13
2006-10-16 Perforation 1891.50 1897.50 13
2006-10-25 Acid Treatment 1922.00 1928.00 0
2006-10-25 Acid Treatment 1864.50 1897.50 0
2011-09-17 Packing Device Capped w/Cement 553.00 1860.00 0
2011-09-18 Perforation 1322.80 1323.80 17
2011-09-18 Perforation 1267.40 1268.40 17
2011-09-19 Perforation 718.00 719.00 17
1962-03-22 Acid Treatment 1757.20 1770.90 0
2011-09-21 Remedial Casing Cementing 718.00 1323.80 0
2011-09-21 Perforation 470.90 471.90 17
2011-09-29 Remedial Casing Cementing 470.90 471.90 0
2011-09-29 Packing Device Capped w/Cement 452.00 461.00 0
2011-09-30 Perforation 382.50 383.50 17
2011-09-30 Perforation 355.00 356.00 17
2011-09-30 Perforation 320.50 321.50 17
2011-09-30 Perforation 220.00 221.00 17
2011-09-30 Perforation 194.00 195.00 17
2011-10-01 Remedial Casing Cementing 194.00 383.50 0
1972-05-25 Cement Squeeze 1757.20 1770.90 0
2011-10-01 Cement Plug 195.00 451.00 0
2011-10-01 Packing Device Capped w/Cement 175.00 184.50 0
1972-06-07 Acid Wash 1855.90 2008.60 0
1974-02-18 Acid Treatment 1855.90 2008.60 0
1982-11-06 Open Hole/Barefoot Completion 1855.90 2036.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5119 0.0 0.0 0.0
1968 6649 0.0 0.0 0.0
1969 8120 0.0 0.0 0.0
1970 5518 0.0 0.0 0.0
1971 1819 0.0 0.0 0.0
1983 2157 0.0 0.0 0.0
1984 7102 0.0 0.0 0.0
1985 7463 0.0 0.0 0.0
1986 7764 0.0 0.0 0.0
1987 5551 0.0 0.0 0.0
1988 7710 0.0 0.0 0.0
1989 8260 0.0 0.0 0.0
1990 5865 0.0 0.0 0.0
1991 6825 0.0 0.0 0.0
1992 7974 0.0 0.0 0.0
1993 6714 0.0 0.0 0.0
1994 6202 0.0 0.0 0.0
1995 8098 0.0 0.0 0.0
1996 4236 0.0 0.0 0.0
1997 5513 0.0 0.0 0.0
1998 7557 0.0 0.0 0.0
1999 8741 0.0 0.0 0.0
2000 8564 0.0 0.0 0.0
2001 8676 0.0 0.0 0.0
2002 8652 0.0 0.0 0.0
2003 6061 0.0 0.0 0.0
2004 8487 0.0 0.0 0.0
2005 509 0.0 0.0 0.0
2006 4124 0.0 0.0 0.0
2007 8321 0.0 0.0 0.0

For data sources see[5]

References