If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484272107000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.154023,"lon":-113.886462,"icon":""}]} |
Location: 00/07-21-048-27W4/0 | |
Location Alias: 00/07-21-48-27 W4M | |
Location Alias 2: 00/07-21-048-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 27 | |
Section: 21 | |
County/Municipality: Leduc County | |
Well Name: ESSO WIZARD LAKE CPR NO. C-4 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0006360 | |
License Date: 1953-04-28 | |
License Status: RecCertified | |
Spud Date: 1953-04-29 | |
Final Drill Date: 1953-06-01 | |
Well Total Depth: 2028.00 m | |
Surface Hole Latitude: 53.154023 | |
Surface Hole Longitude: -113.886462 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1953-04-28 | Obtained License |
1953-05-01 | Perforation Treatment Performed - Open-Hole Completion |
1953-05-01 | Production Casing Operation Performed |
1953-06-01 | Finished Drilling |
1953-06-01 | Well Mode changed to Drilled and Cased |
1953-06-02 | Well Began Production |
1953-06-02 | Well Fluid changed to Crude Oil |
1953-06-02 | Well Mode changed to Flowing |
1970-07-22 | Well Fluid changed to Crude Oil |
1970-07-22 | Well Mode changed to Suspended |
1984-07-02 | Well Log Performed |
1984-07-03 | Perforation Treatment Performed - Open-Hole Completion |
1984-07-03 | Well Log Performed |
1987-07-15 | Well Fluid changed to Crude Oil |
1987-07-15 | Well Mode changed to Pumping |
1991-05-29 | Well Log Performed |
1998-04-17 | Well Log Performed |
2010-06-01 | Well Fluid changed to Crude Oil |
2010-06-01 | Well Mode changed to Suspended |
2012-10-18 | Well Log Performed |
2012-10-19 | Well Log Performed |
2012-10-20 | Well Log Performed |
2012-10-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-10-21 | Perforation Treatment Performed - Cement Plug |
2012-10-21 | Perforation Treatment Performed - Jet Perforation |
2012-10-21 | Perforation Treatment Performed - Remedial Casing |
2012-10-21 | Plug Back Performed |
2012-10-21 | Well Fluid changed to Crude Oil |
2012-10-21 | Well Mode changed to Abandoned Zone |
2012-10-22 | Perforation Treatment Performed - Jet Perforation |
2012-10-22 | Perforation Treatment Performed - Remedial Casing |
2012-10-22 | Well Log Performed |
2012-10-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-10-23 | Perforation Treatment Performed - Cement Plug |
2012-10-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-10-31 | Perforation Treatment Performed - Cement Plug |
2013-05-21 | Well Abandoned |
2013-05-21 | Well Fluid changed to Crude Oil |
2013-05-21 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1953-05-01 | Open Hole/Barefoot Completion | 1984.60 | 2001.00 | 0 |
2012-10-22 | Perforation | 249.00 | 250.00 | 17 |
2012-10-22 | Perforation | 236.00 | 237.00 | 17 |
2012-10-22 | Perforation | 222.50 | 223.50 | 17 |
2012-10-22 | Perforation | 198.00 | 199.00 | 17 |
2012-10-22 | Remedial Casing Cementing | 198.00 | 462.20 | 0 |
2012-10-23 | Cement Plug | 455.00 | 462.20 | 0 |
2012-10-23 | Packing Device Capped w/Cement | 365.00 | 454.50 | 0 |
2012-10-31 | Cement Plug | 190.30 | 365.80 | 0 |
2012-10-31 | Packing Device Capped w/Cement | 172.00 | 190.00 | 0 |
1984-07-03 | Open Hole/Barefoot Completion | 1984.60 | 2028.00 | 0 |
2012-10-21 | Packing Device Capped w/Cement | 876.00 | 1982.00 | 0 |
2012-10-21 | Perforation | 721.00 | 722.00 | 17 |
2012-10-21 | Remedial Casing Cementing | 721.00 | 722.00 | 0 |
2012-10-21 | Cement Plug | 585.00 | 876.00 | 0 |
2012-10-22 | Perforation | 461.20 | 462.20 | 17 |
2012-10-22 | Perforation | 399.00 | 400.00 | 17 |
2012-10-22 | Perforation | 324.00 | 325.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1987 | 2552 | 0.0 | 0.0 | 0.0 |
1988 | 5634 | 0.0 | 0.0 | 0.0 |
1989 | 7455 | 0.0 | 0.0 | 0.0 |
1990 | 5677 | 0.0 | 0.0 | 0.0 |
1991 | 5450 | 0.0 | 0.0 | 0.0 |
1992 | 7775 | 0.0 | 0.0 | 0.0 |
1993 | 3885 | 0.0 | 0.0 | 0.0 |
1994 | 3616 | 0.0 | 0.0 | 0.0 |
1995 | 8126 | 0.0 | 0.0 | 0.0 |
1996 | 7459 | 0.0 | 0.0 | 0.0 |
1997 | 7761 | 0.0 | 0.0 | 0.0 |
1998 | 8471 | 0.0 | 0.0 | 0.0 |
1999 | 8369 | 0.0 | 0.0 | 0.0 |
2000 | 8337 | 0.0 | 0.0 | 0.0 |
2001 | 8558 | 0.0 | 0.0 | 0.0 |
2002 | 7784 | 0.0 | 0.0 | 0.0 |
2003 | 5588 | 0.0 | 0.0 | 0.0 |
2004 | 7555 | 0.0 | 0.0 | 0.0 |
2005 | 6394 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-11-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]