X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484272109000

Well Details

Well ID: 0484272109000
Loading map...
Location: 00/09-21-048-27W4/0
Location Alias: 00/09-21-48-27 W4M
Location Alias 2: 00/09-21-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 21
County/Municipality: Leduc County
Well Name: ESSO WIZARD LAKE C.P.R. B-1
Operator Name: Imperial Oil Resources Limited
License Number: 0003262
License Date: 1951-07-28
License Status: Abandoned
Spud Date: 1951-08-07
Final Drill Date: 1951-09-12
Well Total Depth: 2014.00 m
Surface Hole Latitude: 53.157749
Surface Hole Longitude: -113.881588

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-07-28 Obtained License
1951-08-19 Drill Stem Test Performed
1951-08-29 Drill Stem Test Performed
1951-08-30 Drill Stem Test Performed
1951-09-06 Drill Stem Test Performed
1951-09-07 Production Casing Operation Performed
1951-09-12 Finished Drilling
1951-09-12 Well Mode changed to Drilled and Cased
1951-09-14 Well Began Production
1951-09-14 Well Fluid changed to Crude Oil
1951-09-14 Well Mode changed to Flowing
1965-09-12 Perforation Treatment Performed - Open-Hole Completion
1981-09-06 Perforation Treatment Performed - Open-Hole Completion
1981-12-15 Well Log Performed
1982-06-21 Perforation Treatment Performed - Chemical Squeeze
1983-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-08-05 Well Log Performed
1984-08-16 Well Log Performed
1984-11-07 Well Log Performed
1985-05-30 Well Log Performed
1985-06-06 Well Log Performed
1985-08-20 Well Log Performed
1985-11-12 Well Log Performed
1985-11-20 Well Log Performed
1986-02-17 Well Log Performed
1986-03-18 Well Log Performed
1986-06-17 Well Log Performed
1986-08-10 Well Log Performed
1986-09-21 Well Log Performed
1986-11-07 Well Log Performed
1987-02-11 Well Log Performed
1987-06-09 Well Log Performed
1987-08-11 Well Log Performed
1987-11-11 Well Log Performed
1988-02-09 Well Log Performed
1988-05-10 Well Log Performed
1988-08-02 Well Log Performed
1988-11-03 Well Log Performed
1989-02-20 Well Log Performed
1989-05-25 Well Log Performed
1989-08-16 Well Log Performed
1989-10-08 Well Log Performed
1989-11-07 Perforation Treatment Performed - Jet Perforation
1990-02-22 Well Log Performed
1990-05-26 Well Log Performed
1990-08-13 Well Log Performed
1991-05-14 Well Log Performed
1991-08-28 Well Log Performed
1992-08-12 Well Log Performed
1998-05-04 Well Log Performed
2009-06-04 Well Log Performed
2009-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-06-11 Plug Back Performed
2009-06-11 Well Fluid changed to Crude Oil
2009-06-11 Well Mode changed to Abandoned Zone
2009-06-12 Perforation Treatment Performed - Jet Perforation
2009-06-12 Well Log Performed
2009-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-06-13 Perforation Treatment Performed - Jet Perforation
2009-06-13 Perforation Treatment Performed - Remedial Casing
2009-06-13 Well Log Performed
2009-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-06-14 Perforation Treatment Performed - Remedial Casing
2009-06-15 Perforation Treatment Performed - Jet Perforation
2009-06-15 Well Log Performed
2009-06-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-06-16 Perforation Treatment Performed - Remedial Casing
2009-06-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-06-17 Perforation Treatment Performed - Jet Perforation
2009-06-17 Perforation Treatment Performed - Remedial Casing
2012-06-16 Well Abandoned
2012-06-16 Well Fluid changed to Crude Oil
2012-06-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-09-12 Open Hole/Barefoot Completion 1940.10 1955.30 0
2009-06-13 Perforation 721.50 722.50 17
2009-06-14 Remedial Casing Cementing 721.50 722.50 0
2009-06-14 Packing Device Capped w/Cement 689.00 714.00 0
2009-06-15 Perforation 453.50 454.50 17
2009-06-15 Perforation 416.50 417.50 17
2009-06-15 Perforation 360.50 361.50 17
2009-06-15 Perforation 316.50 317.50 17
2009-06-15 Perforation 301.50 302.50 17
2009-06-16 Remedial Casing Cementing 301.50 454.50 0
2009-06-16 Packing Device Capped w/Cement 283.50 293.00 0
1981-09-06 Open Hole/Barefoot Completion 1940.10 2014.00 0
2009-06-17 Perforation 198.00 199.00 17
2009-06-17 Remedial Casing Cementing 198.00 199.00 0
2009-06-17 Packing Device Capped w/Cement 178.00 187.50 0
1982-06-21 Chemical Squeeze 1940.10 2014.00 0
1983-03-08 Acid Treatment 1940.10 2014.00 0
1989-11-07 Perforation 1992.20 1992.70 20
2009-06-11 Packing Device Capped w/Cement 1390.00 1930.00 0
2009-06-12 Perforation 1246.50 1247.50 17
2009-06-13 Remedial Casing Cementing 1246.50 1247.50 0
2009-06-13 Packing Device Capped w/Cement 1210.20 1235.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1970 191 0.0 0.0 0.0
1977 1549 0.0 0.0 0.0
1978 4096 0.0 0.0 0.0
1979 5966 0.0 0.0 0.0
1980 6314 0.0 0.0 0.0
1981 1311 0.0 0.0 0.0
1982 3843 0.0 0.0 0.0
1983 6514 0.0 0.0 0.0
1984 6948 0.0 0.0 0.0
1985 5733 0.0 0.0 0.0
1986 948 0.0 0.0 0.0
1988 832 0.0 0.0 0.0
1989 72 0.0 0.0 0.0
1990 7599 0.0 0.0 0.0
1991 3932 0.0 0.0 0.0
1992 876 0.0 0.0 0.0
1993 2187 0.0 0.0 0.0
1994 46 0.0 0.0 0.0
1995 1684 0.0 0.0 0.0
1996 4168 0.0 0.0 0.0
1997 7093 0.0 0.0 0.0
1998 8245 0.0 0.0 0.0
1999 8625 0.0 0.0 0.0
2000 8454 0.0 0.0 0.0
2001 8702 0.0 0.0 0.0
2002 8700 0.0 0.0 0.0
2003 7578 0.0 0.0 0.0
2004 8090 0.0 0.0 0.0
2005 7405 0.0 0.0 0.0
2006 6991 0.0 0.0 0.0

For data sources see[5]

References