If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484272203000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.150539,"lon":-113.869243,"icon":""}]} |
Location: 00/03-22-048-27W4/0 | |
Location Alias: 00/03-22-48-27 W4M | |
Location Alias 2: 00/03-22-048-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 27 | |
Section: 22 | |
County/Municipality: Leduc County | |
Well Name: ESSO WIZARD LAKE B-9 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0004466 | |
License Date: 1952-04-02 | |
License Status: Abandoned | |
Spud Date: 1952-04-21 | |
Final Drill Date: 1952-07-09 | |
Well Total Depth: 2183.90 m | |
Surface Hole Latitude: 53.150539 | |
Surface Hole Longitude: -113.869243 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-04-02 | Obtained License |
1952-05-29 | Drill Stem Test Performed |
1952-06-05 | Drill Stem Test Performed |
1952-06-07 | Drill Stem Test Performed |
1952-06-08 | Drill Stem Test Performed |
1952-06-09 | Drill Stem Test Performed |
1952-06-11 | Production Casing Operation Performed |
1952-06-25 | Drill Stem Test Performed |
1952-07-01 | Drill Stem Test Performed |
1952-07-09 | Finished Drilling |
1952-07-09 | Well Mode changed to Drilled and Cased |
1952-07-11 | Drill Stem Test Performed |
1952-07-14 | Perforation Treatment Performed - Bullet Perforation |
1952-07-14 | Perforation Treatment Performed - Jet Perforation |
1952-07-16 | Well Began Production |
1952-07-16 | Well Fluid changed to Crude Oil |
1952-07-16 | Well Mode changed to Flowing |
1970-07-22 | Well Fluid changed to Crude Oil |
1970-07-22 | Well Mode changed to Suspended |
1977-09-29 | Perforation Treatment Performed - Fractured |
1977-09-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-07-15 | Well Log Performed |
1984-07-16 | Well Log Performed |
1984-08-11 | Well Log Performed |
1985-03-12 | Well Fluid changed to Crude Oil |
1985-03-12 | Well Mode changed to Flowing |
1986-06-15 | Perforation Treatment Performed - Chemical Squeeze |
1986-06-15 | Well Log Performed |
1989-08-04 | Perforation Treatment Performed - Cement Squeeze |
1989-08-09 | Perforation Treatment Performed - Jet Perforation |
1989-08-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-02-03 | Perforation Treatment Performed - Cement Squeeze |
1997-02-06 | Perforation Treatment Performed - Jet Perforation |
1997-02-06 | Well Log Performed |
1997-02-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-05-12 | Perforation Treatment Performed - Jet Perforation |
1999-05-12 | Well Log Performed |
1999-05-19 | Well Log Performed |
1999-05-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2004-07-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2004-07-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-06-01 | Well Fluid changed to Crude Oil |
2010-06-01 | Well Mode changed to Suspended |
2011-10-04 | Well Log Performed |
2011-10-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-10-12 | Perforation Treatment Performed - Jet Perforation |
2011-10-12 | Perforation Treatment Performed - Remedial Casing |
2011-10-12 | Plug Back Performed |
2011-10-12 | Well Fluid changed to Crude Oil |
2011-10-12 | Well Mode changed to Abandoned Zone |
2011-10-13 | Perforation Treatment Performed - Jet Perforation |
2011-10-13 | Well Log Performed |
2011-10-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-10-14 | Perforation Treatment Performed - Remedial Casing |
2011-10-15 | Perforation Treatment Performed - Jet Perforation |
2011-10-15 | Well Log Performed |
2011-10-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-10-16 | Perforation Treatment Performed - Remedial Casing |
2012-10-31 | Well Abandoned |
2012-10-31 | Well Fluid changed to Crude Oil |
2012-10-31 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-07-14 | Perforation | 1983.60 | 1999.50 | 13 |
1997-02-06 | Perforation | 2009.70 | 2010.40 | 17 |
1997-02-09 | Acid Treatment | 2009.70 | 2010.40 | 0 |
1999-05-12 | Perforation | 2013.50 | 2014.10 | 17 |
1999-05-21 | Acid Treatment | 2013.50 | 2014.10 | 0 |
2004-07-02 | Acid Treatment | 2009.70 | 2010.40 | 0 |
2004-07-29 | Acid Treatment | 2009.70 | 2010.40 | 0 |
2011-10-12 | Packing Device Capped w/Cement | 620.00 | 1975.00 | 0 |
2011-10-12 | Perforation | 707.50 | 708.50 | 17 |
2011-10-12 | Remedial Casing Cementing | 707.50 | 708.50 | 0 |
2011-10-13 | Perforation | 443.50 | 444.50 | 17 |
1952-07-14 | Bullet Perforation | 1983.60 | 1999.50 | 13 |
2011-10-14 | Remedial Casing Cementing | 443.50 | 444.50 | 0 |
2011-10-14 | Packing Device Capped w/Cement | 231.00 | 431.00 | 0 |
2011-10-15 | Perforation | 289.00 | 290.00 | 17 |
2011-10-15 | Perforation | 242.00 | 243.00 | 17 |
2011-10-15 | Perforation | 209.00 | 210.00 | 17 |
2011-10-16 | Remedial Casing Cementing | 209.00 | 290.00 | 0 |
2011-10-16 | Packing Device Capped w/Cement | 185.00 | 195.50 | 0 |
1977-09-29 | Fracture | 1983.60 | 1999.50 | 0 |
1977-09-30 | Acid Treatment | 1983.60 | 1999.50 | 0 |
1986-06-15 | Chemical Squeeze | 1983.60 | 1999.50 | 0 |
1989-08-04 | Cement Squeeze | 1983.60 | 1999.50 | 0 |
1989-08-09 | Perforation | 2002.30 | 2003.30 | 20 |
1989-08-11 | Acid Treatment | 2002.30 | 2003.30 | 0 |
1997-02-03 | Cement Squeeze | 2002.30 | 2003.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1985 | 6973 | 0.0 | 0.0 | 0.0 |
1986 | 3750 | 0.0 | 0.0 | 0.0 |
1987 | 1675 | 0.0 | 0.0 | 0.0 |
1988 | 2162 | 0.0 | 0.0 | 0.0 |
1991 | 4102 | 0.0 | 0.0 | 0.0 |
1992 | 8569 | 0.0 | 0.0 | 0.0 |
1993 | 3713 | 0.0 | 0.0 | 0.0 |
1994 | 8658 | 0.0 | 0.0 | 0.0 |
1995 | 7063 | 0.0 | 0.0 | 0.0 |
1996 | 8732 | 0.0 | 0.0 | 0.0 |
1997 | 7982 | 0.0 | 0.0 | 0.0 |
1998 | 8751 | 0.0 | 0.0 | 0.0 |
1999 | 8281 | 0.0 | 0.0 | 0.0 |
2000 | 8561 | 0.0 | 0.0 | 0.0 |
2001 | 8753 | 0.0 | 0.0 | 0.0 |
2002 | 8703 | 0.0 | 0.0 | 0.0 |
2003 | 5642 | 0.0 | 0.0 | 0.0 |
2004 | 7320 | 0.0 | 0.0 | 0.0 |
2005 | 227 | 0.0 | 0.0 | 0.0 |
For data sources see[5]