X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484272211000

Well Details

Well ID: 0484272211000
Loading map...
Location: 00/11-22-048-27W4/0
Location Alias: 00/11-22-48-27 W4M
Location Alias 2: 00/11-22-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 22
County/Municipality: Leduc County
Well Name: ESSO WIZARD LAKE NO B-3
Operator Name: Imperial Oil Resources Limited
License Number: 0002997
License Date: 1951-06-07
License Status: Abandoned
Spud Date: 1951-06-23
Final Drill Date: 1951-08-26
Well Total Depth: 2033.00 m
Surface Hole Latitude: 53.157756
Surface Hole Longitude: -113.869222

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-06-07 Obtained License
1951-07-10 Drill Stem Test Performed
1951-07-16 Drill Stem Test Performed
1951-07-19 Drill Stem Test Performed
1951-07-24 Drill Stem Test Performed
1951-07-25 Drill Stem Test Performed
1951-08-08 Drill Stem Test Performed
1951-08-18 Production Casing Operation Performed
1951-08-23 Drill Stem Test Performed
1951-08-26 Drill Stem Test Performed
1951-08-26 Finished Drilling
1951-08-26 Perforation Treatment Performed - Open-Hole Completion
1951-08-26 Well Mode changed to Drilled and Cased
1951-08-28 Well Began Production
1951-08-28 Well Fluid changed to Crude Oil
1951-08-28 Well Log Performed
1951-08-28 Well Mode changed to Flowing
1951-09-05 Well Log Performed
1958-10-09 Perforation Treatment Performed - Cement Plug
1958-10-09 Perforation Treatment Performed - Jet Perforation
1958-10-09 Well Fluid changed to Crude Oil
1958-10-09 Well Mode changed to Abandoned Zone
1958-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-10-10 Perforation Treatment Performed - Jet Perforation
1958-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-05-28 Perforation Treatment Performed - Cement Squeeze
1973-06-01 Perforation Treatment Performed - Open-Hole Completion
1973-06-09 Well Fluid changed to Crude Oil
1973-06-09 Well Mode changed to Suspended
1973-12-07 Well Log Performed
1974-02-28 Well Log Performed
1974-05-02 Well Log Performed
1974-05-28 Well Log Performed
1974-06-25 Well Log Performed
1974-07-29 Well Log Performed
1974-08-29 Well Log Performed
1974-09-30 Well Log Performed
1974-10-29 Well Log Performed
1975-01-03 Well Log Performed
1975-02-05 Well Log Performed
1975-03-31 Well Log Performed
1975-06-06 Well Log Performed
1975-09-12 Well Log Performed
1975-11-20 Well Log Performed
1976-03-09 Well Log Performed
1976-05-26 Well Log Performed
1976-11-22 Well Log Performed
1977-02-28 Well Log Performed
1977-05-24 Well Log Performed
1977-12-07 Well Log Performed
1978-02-27 Well Log Performed
1978-05-24 Well Log Performed
1978-11-20 Well Log Performed
1980-08-06 Well Log Performed
1981-05-27 Well Log Performed
1983-02-10 Well Fluid changed to Crude Oil
1983-02-10 Well Mode changed to Flowing
1983-03-01 Perforation Treatment Performed - Open-Hole Completion
1983-03-02 Well Log Performed
1983-05-11 Perforation Treatment Performed - Chemical Squeeze
1983-05-12 Perforation Treatment Performed - Fractured
1983-08-04 Well Log Performed
1984-06-28 Well Log Performed
1984-06-29 Well Log Performed
1984-06-30 Well Log Performed
1984-11-16 Perforation Treatment Performed - Open-Hole Completion
1984-12-03 Liner Casing Operation Performed
1984-12-03 Perforation Treatment Performed - Cement Squeeze
1984-12-06 Well Log Performed
1984-12-07 Perforation Treatment Performed - Jet Perforation
1984-12-07 Well Log Performed
1984-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-09-26 Perforation Treatment Performed - Cement Squeeze
1985-09-28 Perforation Treatment Performed - Acid Wash - No Pressure
1985-09-28 Perforation Treatment Performed - Cement Squeeze
1985-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-09-30 Perforation Treatment Performed - Jet Perforation
1985-09-30 Well Log Performed
1986-08-25 Perforation Treatment Performed - Jet Perforation
1986-08-26 Well Log Performed
1986-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-06-24 Well Log Performed
1987-07-22 Perforation Treatment Performed - Cement Squeeze
1987-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-07-24 Perforation Treatment Performed - Jet Perforation
1989-11-24 Perforation Treatment Performed - Jet Perforation
1989-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-11-25 Well Log Performed
1989-11-26 Perforation Treatment Performed - Cement Squeeze
1989-11-26 Well Log Performed
1989-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-11-28 Well Log Performed
1994-06-22 Well Fluid changed to Crude Oil
1994-06-22 Well Mode changed to Suspended
1995-01-12 Well Fluid changed to Crude Oil
1995-01-12 Well Mode changed to Gas Lift
1996-02-24 Perforation Treatment Performed - Cement Squeeze
1996-02-25 Perforation Treatment Performed - Jet Perforation
1996-02-27 Perforation Treatment Performed - Cement Squeeze
1996-03-01 Perforation Treatment Performed - Jet Perforation
1996-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-04-09 Well Log Performed
1998-04-12 Perforation Treatment Performed - Jet Perforation
2004-10-06 Well Log Performed
2004-10-22 Perforation Treatment Performed - Jet Perforation
2004-10-22 Well Log Performed
2004-10-23 Perforation Treatment Performed - Casing Patch (Over Perfs)
2004-10-23 Well Log Performed
2004-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-01-05 Perforation Treatment Performed - Jet Perforation
2005-01-05 Well Log Performed
2005-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-08-03 Perforation Treatment Performed - Jet Perforation
2005-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-09-27 Well Log Performed
2005-09-28 Perforation Treatment Performed - Jet Perforation
2005-09-28 Well Log Performed
2005-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-08-15 Perforation Treatment Performed - Jet Perforation
2006-08-15 Well Log Performed
2006-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-01-16 Perforation Treatment Performed - Jet Perforation
2007-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-07-30 Perforation Treatment Performed - Jet Perforation
2007-07-30 Well Log Performed
2007-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-02-01 Perforation Treatment Performed - Jet Perforation
2008-02-01 Well Log Performed
2008-02-02 Well Log Performed
2008-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-06-01 Well Fluid changed to Crude Oil
2010-06-01 Well Mode changed to Suspended
2013-05-28 Well Log Performed
2013-05-29 Well Log Performed
2013-05-30 Well Log Performed
2013-05-31 Perforation Treatment Performed - Jet Perforation
2013-05-31 Perforation Treatment Performed - Remedial Casing
2013-05-31 Well Log Performed
2013-06-01 Perforation Treatment Performed - Cement Plug
2013-06-01 Plug Back Performed
2013-06-01 Well Fluid changed to Crude Oil
2013-06-01 Well Mode changed to Abandoned Zone
2013-06-02 Perforation Treatment Performed - Jet Perforation
2013-06-02 Perforation Treatment Performed - Remedial Casing
2013-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-06-03 Perforation Treatment Performed - Cement Plug
2013-06-04 Perforation Treatment Performed - Jet Perforation
2013-06-04 Perforation Treatment Performed - Remedial Casing
2013-06-04 Well Log Performed
2013-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-06-05 Perforation Treatment Performed - Cement Plug
2014-07-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-08-26 Open Hole/Barefoot Completion 1814.20 1843.10 0
1983-03-01 Open Hole/Barefoot Completion 1814.20 2031.00 0
1983-05-11 Chemical Squeeze 1814.20 2031.00 0
1983-05-12 Fracture 1814.20 2031.00 0
1984-11-16 Open Hole/Barefoot Completion 1814.20 2033.00 0
1984-12-03 Cement Squeeze 1814.20 2033.00 0
1984-12-07 Perforation 1982.20 1982.70 13
1984-12-10 Acid Treatment 1982.20 1982.70 0
1985-09-26 Cement Squeeze 1982.20 1982.50 0
1985-09-28 Acid Wash 1982.20 1982.50 0
1985-09-28 Cement Squeeze 1982.20 1982.50 0
1958-10-09 Cement Plug 1761.70 1761.70 0
1985-09-30 Perforation 1983.50 1984.00 13
1985-09-30 Acid Treatment 1983.50 1984.00 0
1986-08-25 Perforation 1986.00 1986.50 13
1986-08-27 Acid Treatment 1986.00 1986.50 0
1987-07-22 Cement Squeeze 1983.50 1986.50 0
1987-07-24 Perforation 1991.50 1992.00 13
1987-07-24 Perforation 1920.00 1920.50 13
1987-07-24 Acid Treatment 1991.50 1992.00 0
1987-07-24 Acid Treatment 1920.00 1920.50 0
1989-11-24 Perforation 1995.20 1996.20 20
1958-10-09 Perforation 1747.10 1748.90 13
1989-11-24 Perforation 1999.20 2000.20 20
1989-11-25 Acid Treatment 1995.20 2000.20 0
1989-11-26 Cement Squeeze 1991.50 1992.00 0
1989-11-27 Acid Treatment 1995.20 1996.20 0
1989-11-27 Acid Treatment 1920.00 1920.50 0
1996-02-24 Cement Squeeze 1920.00 1920.50 0
1996-02-25 Perforation 1999.70 2000.00 72
1996-02-27 Cement Squeeze 1999.70 2000.20 0
1996-03-01 Perforation 1914.50 1915.00 20
1996-03-01 Perforation 2001.60 2002.10 20
1958-10-09 Perforation 1750.20 1751.40 13
1996-03-01 Perforation 2004.40 2004.90 20
1996-03-03 Acid Treatment 1914.50 2002.10 0
1998-04-12 Perforation 2008.10 2008.60 13
2004-10-22 Perforation 2002.10 2004.40 14
2004-10-23 Casing Patch 1914.50 1915.00 0
2004-11-19 Acid Treatment 2001.60 2004.90 0
2005-01-05 Perforation 1991.50 1994.50 14
2005-01-23 Acid Treatment 1991.50 1994.50 0
2005-08-03 Perforation 1974.00 1982.00 13
2005-08-23 Acid Treatment 1974.00 1982.00 0
1958-10-10 Perforation 1736.80 1738.60 13
2005-09-28 Perforation 1959.00 1965.00 20
2005-09-29 Acid Treatment 1959.00 1965.00 0
2006-08-15 Perforation 1928.00 1934.00 20
2006-08-17 Acid Treatment 1928.00 1934.00 0
2007-01-16 Perforation 1902.00 1908.00 13
2007-01-17 Acid Treatment 1902.00 1908.00 0
2007-07-30 Perforation 1850.00 1856.00 13
2007-07-30 Perforation 1875.00 1881.00 13
2007-07-31 Acid Treatment 1850.00 1881.00 0
2008-02-01 Perforation 1826.00 1830.00 13
1958-10-10 Acid Treatment 1736.80 1751.40 0
2008-02-03 Acid Treatment 1826.00 1830.00 0
2013-05-31 Perforation 1234.70 1235.70 17
2013-05-31 Perforation 708.00 709.00 17
2013-05-31 Perforation 451.10 452.10 17
2013-05-31 Remedial Casing Cementing 451.10 1235.70 0
2013-06-01 Cement Plug 441.50 1815.00 0
2013-06-02 Perforation 386.00 387.00 17
2013-06-02 Perforation 353.00 354.00 17
2013-06-02 Perforation 322.00 323.00 17
2013-06-02 Perforation 275.00 276.00 17
1958-10-15 Acid Treatment 1736.80 1751.40 0
2013-06-02 Perforation 241.00 242.00 17
2013-06-02 Remedial Casing Cementing 241.00 387.00 0
2013-06-03 Cement Plug 196.50 441.00 0
2013-06-03 Packing Device Capped w/Cement 185.00 195.00 0
2013-06-04 Perforation 182.00 182.40 12
2013-06-04 Remedial Casing Cementing 182.00 182.40 0
2013-06-05 Cement Plug 178.40 185.00 0
2013-06-05 Packing Device Capped w/Cement 168.00 178.00 0
1973-05-28 Cement Squeeze 1736.80 1751.40 0
1973-06-01 Open Hole/Barefoot Completion 1814.20 1993.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1983 5087 0.0 0.0 0.0
1984 4942 0.0 0.0 0.0
1985 7848 0.0 0.0 0.0
1986 6546 0.0 0.0 0.0
1987 4993 0.0 0.0 0.0
1988 8657 0.0 0.0 0.0
1989 6350 0.0 0.0 0.0
1990 4973 0.0 0.0 0.0
1991 6389 0.0 0.0 0.0
1992 8551 0.0 0.0 0.0
1993 5849 0.0 0.0 0.0
1994 1062 0.0 0.0 0.0
1995 7964 0.0 0.0 0.0
1996 6095 0.0 0.0 0.0
1997 6033 0.0 0.0 0.0
1998 7253 0.0 0.0 0.0
1999 8715 0.0 0.0 0.0
2000 8101 0.0 0.0 0.0
2001 8223 0.0 0.0 0.0
2002 8320 0.0 0.0 0.0
2003 6788 0.0 0.0 0.0
2004 6114 0.0 0.0 0.0
2005 6484 0.0 0.0 0.0
2006 8519 0.0 0.0 0.0
2007 8618 0.0 0.0 0.0
2008 2582 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-06-06 No Incident Encountered 0.00 0.00

For data sources see[6]

References