X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484272212000

Well Details

Well ID: 0484272212000
Loading map...
Location: 00/12-22-048-27W4/0
Location Alias: 00/12-22-48-27 W4M
Location Alias 2: 00/12-22-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 22
County/Municipality: Leduc County
Well Name: ESSO B1 WIZARD 12-22MU-48-27
Operator Name: Imperial Oil Resources Limited
License Number: 0002671
License Date: 1951-03-05
License Status: Abandoned
Spud Date: 1951-03-14
Final Drill Date: 1951-05-14
Well Total Depth: 2042.20 m
Surface Hole Latitude: 53.157755
Surface Hole Longitude: -113.875258

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-03-05 Obtained License
1951-04-01 Drill Stem Test Performed
1951-04-02 Drill Stem Test Performed
1951-04-07 Drill Stem Test Performed
1951-04-11 Drill Stem Test Performed
1951-04-13 Drill Stem Test Performed
1951-04-15 Drill Stem Test Performed
1951-04-16 Drill Stem Test Performed
1951-04-19 Drill Stem Test Performed
1951-05-03 Drill Stem Test Performed
1951-05-04 Drill Stem Test Performed
1951-05-05 Drill Stem Test Performed
1951-05-06 Drill Stem Test Performed
1951-05-07 Drill Stem Test Performed
1951-05-08 Drill Stem Test Performed
1951-05-09 Drill Stem Test Performed
1951-05-14 Finished Drilling
1951-05-14 Well Mode changed to Drilled and Cased
1951-05-16 Perforation Treatment Performed - Open-Hole Completion
1951-05-16 Production Casing Operation Performed
1951-05-23 Well Began Production
1951-05-23 Well Fluid changed to Crude Oil
1951-05-23 Well Mode changed to Flowing
1956-11-09 Perforation Treatment Performed - Open-Hole Completion
1958-09-04 Well Fluid changed to Crude Oil
1958-09-04 Well Mode changed to Suspended
1958-09-21 Perforation Treatment Performed - Jet Perforation
1958-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-10-17 Well Fluid changed to Crude Oil
1958-10-17 Well Mode changed to Suspended
1958-11-13 Well Log Performed
1961-09-07 Well Log Performed
1965-12-22 Well Log Performed
1965-12-30 Well Log Performed
1969-05-23 Well Log Performed
1969-10-27 Well Log Performed
1970-05-05 Well Log Performed
1972-11-14 Well Log Performed
1973-11-29 Well Log Performed
1974-02-27 Well Log Performed
1974-03-28 Well Log Performed
1974-05-01 Well Log Performed
1974-05-27 Well Log Performed
1977-07-28 Well Fluid changed to Crude Oil
1977-07-28 Well Mode changed to Flowing
1977-10-12 Perforation Treatment Performed - Fractured
1977-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-14 Perforation Treatment Performed - Chemical Squeeze
1983-01-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-31 Well Log Performed
1984-05-01 Well Log Performed
1984-07-02 Perforation Treatment Performed - Cement Squeeze
1984-07-02 Well Log Performed
1984-07-06 Well Log Performed
1984-07-08 Well Log Performed
1984-12-03 Well Log Performed
1985-01-05 Liner Casing Operation Performed
1985-01-05 Perforation Treatment Performed - Cement Squeeze
1985-01-07 Well Log Performed
1985-01-10 Perforation Treatment Performed - Jet Perforation
1985-01-10 Well Log Performed
1985-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-16 Perforation Treatment Performed - Jet Perforation
1985-03-16 Well Log Performed
1985-03-17 Perforation Treatment Performed - Cement Squeeze
1985-03-21 Perforation Treatment Performed - Jet Perforation
1985-03-21 Well Log Performed
1985-03-22 Well Log Performed
1985-06-23 Well Log Performed
1985-06-24 Perforation Treatment Performed - Jet Perforation
1985-06-24 Well Log Performed
1985-07-02 Perforation Treatment Performed - Fractured
1985-07-10 Well Began Injection
1985-07-10 Well Fluid changed to Gas
1985-07-10 Well Type changed to Injection
1988-03-05 Perforation Treatment Performed - Cement Squeeze
1988-03-07 Perforation Treatment Performed - Jet Perforation
1988-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-28 Perforation Treatment Performed - Jet Perforation
1992-08-01 Well Fluid changed to Solvent
1992-08-01 Well Type changed to Injection
1993-10-01 Perforation Treatment Performed - Cement Squeeze
1993-10-12 Well Log Performed
1997-09-25 Well Log Performed
1999-02-01 Well Fluid changed to Solvent
1999-02-01 Well Mode changed to Suspended
1999-02-01 Well Type changed to Injection
2003-06-06 Perforation Treatment Performed - Jet Perforation
2003-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-07-03 Well Fluid changed to Crude Oil
2003-07-03 Well Mode changed to Flowing
2006-10-26 Perforation Treatment Performed - Jet Perforation
2006-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-06-18 Perforation Treatment Performed - Jet Perforation
2007-06-18 Well Log Performed
2007-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-11-28 Perforation Treatment Performed - Jet Perforation
2007-11-28 Well Log Performed
2007-11-29 Well Log Performed
2007-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-06-01 Well Fluid changed to Crude Oil
2010-06-01 Well Mode changed to Suspended
2013-04-24 Well Log Performed
2013-04-30 Perforation Treatment Performed - Jet Perforation
2013-04-30 Perforation Treatment Performed - Remedial Casing
2013-04-30 Well Log Performed
2013-05-02 Perforation Treatment Performed - Cement Plug
2013-05-02 Plug Back Performed
2013-05-02 Well Fluid changed to Crude Oil
2013-05-02 Well Mode changed to Abandoned Zone
2013-05-03 Perforation Treatment Performed - Jet Perforation
2013-05-03 Perforation Treatment Performed - Remedial Casing
2013-05-03 Well Log Performed
2013-05-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-05-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-05-16 Open Hole/Barefoot Completion 1801.40 1823.90 0
1984-07-02 Cement Squeeze 1745.60 1749.20 0
1985-01-05 Cement Squeeze 1801.00 2042.00 0
1985-01-10 Perforation 1974.80 1975.30 7
1985-01-11 Acid Treatment 1974.80 1975.30 0
1985-03-16 Perforation 1967.50 1968.50 13
1985-03-17 Cement Squeeze 1967.50 1968.50 0
1985-03-21 Perforation 1974.60 1975.30 13
1985-06-24 Perforation 1965.30 1967.30 13
1985-07-02 Fracture 1965.30 1967.30 0
1988-03-05 Cement Squeeze 1965.30 1975.30 0
1956-11-09 Open Hole/Barefoot Completion 1801.40 2042.20 0
1988-03-07 Perforation 1977.40 1979.40 14
1988-03-11 Acid Treatment 1977.40 1979.40 0
1992-07-28 Perforation 1997.10 1999.10 20
1992-07-28 Perforation 1992.10 1994.10 20
1993-10-01 Cement Squeeze 1977.40 1979.40 0
2003-06-06 Perforation 1966.00 1972.00 13
2003-06-11 Acid Treatment 1966.00 1972.00 0
2006-10-26 Perforation 1911.50 1917.50 13
2006-10-27 Acid Treatment 1911.50 1917.50 0
2007-06-18 Perforation 1881.50 1887.50 13
1958-09-21 Perforation 1745.60 1749.20 13
2007-06-19 Acid Treatment 1881.50 1887.50 0
2007-11-28 Perforation 1856.00 1862.00 13
2007-11-28 Perforation 1826.00 1832.00 13
2007-12-05 Acid Treatment 1826.00 1862.00 0
2013-04-30 Perforation 710.00 711.00 17
2013-04-30 Perforation 452.60 453.60 17
2013-04-30 Remedial Casing Cementing 452.60 711.00 0
2013-05-02 Cement Plug 446.50 1820.00 0
2013-05-03 Perforation 200.00 201.00 17
2013-05-03 Perforation 206.00 207.00 17
1958-09-22 Acid Treatment 1745.60 1749.20 0
2013-05-03 Perforation 217.00 218.00 17
2013-05-03 Perforation 231.00 232.00 17
2013-05-03 Perforation 247.00 248.00 17
2013-05-03 Perforation 310.00 311.00 17
2013-05-03 Perforation 321.00 322.00 17
2013-05-03 Perforation 344.00 345.00 17
2013-05-03 Perforation 363.00 364.00 17
2013-05-03 Perforation 413.00 414.00 17
2013-05-03 Remedial Casing Cementing 200.00 414.00 0
2013-05-04 Packing Device Capped w/Cement 196.50 446.00 0
1958-09-26 Acid Treatment 1745.60 1749.20 0
2013-05-04 Packing Device Capped w/Cement 186.00 196.00 0
1977-10-12 Fracture 1801.40 2042.20 0
1977-10-13 Acid Treatment 1801.40 2042.20 0
1981-01-14 Chemical Squeeze 1801.40 2042.20 0
1983-01-05 Acid Treatment 1801.40 2042.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 142 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 177 0.0 0.0 0.0
1978 1119 0.0 0.0 0.0
1979 1851 0.0 0.0 0.0
1980 2144 0.0 0.0 0.0
1981 5465 0.0 0.0 0.0
1982 7892 0.0 0.0 0.0
1983 5579 0.0 0.0 0.0
1984 6711 0.0 0.0 0.0
1985 503 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
2003 3710 0.0 0.0 0.0
2004 8444 0.0 0.0 0.0
2005 8579 0.0 0.0 0.0
2006 8240 0.0 0.0 0.0
2007 8372 0.0 0.0 0.0
2008 5818 0.0 0.0 0.0
2009 1624 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-05-05 No Incident Encountered 0.00 0.00

For data sources see[6]

References