X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484272214000

Well Details

Well ID: 0484272214000
Loading map...
Location: 00/14-22-048-27W4/0
Location Alias: 00/14-22-48-27 W4M
Location Alias 2: 00/14-22-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 22
County/Municipality: Leduc County
Well Name: ESSO B8 WIZARD 14-22MU-48-27
Operator Name: Imperial Oil Resources Limited
License Number: 0004218
License Date: 1952-02-13
License Status: Abandoned
Spud Date: 1952-02-21
Final Drill Date: 1952-04-09
Well Total Depth: 2011.40 m
Surface Hole Latitude: 53.161097
Surface Hole Longitude: -113.869109

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-02-13 Obtained License
1952-03-15 Drill Stem Test Performed
1952-03-31 Drill Stem Test Performed
1952-04-01 Drill Stem Test Performed
1952-04-06 Production Casing Operation Performed
1952-04-09 Drill Stem Test Performed
1952-04-09 Finished Drilling
1952-04-09 Perforation Treatment Performed - Open-Hole Completion
1952-04-09 Well Mode changed to Drilled and Cased
1952-04-13 Well Began Production
1952-04-13 Well Fluid changed to Crude Oil
1952-04-13 Well Mode changed to Flowing
1958-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1958-10-16 Perforation Treatment Performed - Abrasa-Jet Perforation
1958-10-16 Perforation Treatment Performed - Cement Squeeze
1958-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-10-17 Perforation Treatment Performed - Acid Wash - No Pressure
1958-10-17 Perforation Treatment Performed - Jet Perforation
1958-10-18 Perforation Treatment Performed - Jet Perforation
1958-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-10-27 Well Fluid changed to Crude Oil
1958-10-27 Well Mode changed to Suspended
1960-04-16 Perforation Treatment Performed - Cement Squeeze
1960-04-17 Perforation Treatment Performed - Jet Perforation
1960-04-23 Perforation Treatment Performed - Condensate Squeeze
1960-04-26 Perforation Treatment Performed - Condensate Squeeze
1960-05-04 Perforation Treatment Performed - Jet Perforation
1960-05-08 Perforation Treatment Performed - Jet Perforation
1960-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-05-12 Perforation Treatment Performed - Cement Squeeze
1960-05-13 Perforation Treatment Performed - Jet Perforation
1960-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-06-09 Perforation Treatment Performed - Cement Squeeze
1969-06-16 Perforation Treatment Performed - Open-Hole Completion
1969-11-28 Well Began Injection
1969-11-28 Well Fluid changed to Solvent
1969-11-28 Well Type changed to Injection
1969-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-11-13 Perforation Treatment Performed - Open-Hole Completion
1984-10-25 Well Log Performed
1984-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-11-02 Perforation Treatment Performed - Remedial Casing
1984-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-11-05 Well Log Performed
1985-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-03-07 Plug Back Performed
1985-03-07 Well Fluid changed to Solvent
1985-03-07 Well Mode changed to Abandoned
1985-03-07 Well Type changed to Injection
1985-03-08 Well Abandoned
2004-05-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-04-09 Open Hole/Barefoot Completion 1814.80 1860.80 0
1960-04-16 Cement Squeeze 1483.50 1483.80 0
1960-04-17 Perforation 1446.60 1449.60 13
1960-04-23 Condensate Squeeze 1446.60 1449.60 0
1960-04-26 Condensate Squeeze 1446.60 1449.60 0
1960-05-04 Perforation 1449.60 1451.50 7
1960-05-08 Perforation 1449.60 1451.50 7
1960-05-09 Acid Treatment 1446.60 1451.50 0
1960-05-12 Cement Squeeze 1446.60 1451.50 0
1960-05-13 Perforation 1232.60 1235.70 13
1960-05-20 Acid Treatment 1741.60 1745.90 0
1958-10-15 Packing Device Capped w/Cement 1783.10 1783.10 0
1969-06-09 Cement Squeeze 1741.60 1745.90 0
1969-06-09 Cement Squeeze 1232.60 1235.70 0
1969-06-16 Open Hole/Barefoot Completion 1814.80 1860.80 0
1969-12-12 Acid Treatment 1794.40 1860.80 0
1974-11-13 Open Hole/Barefoot Completion 1814.80 2011.40 0
1984-11-02 Remedial Casing Cementing 1741.60 1745.60 0
1984-11-02 Packing Device Capped w/Cement 1730.00 1745.60 0
1984-11-04 Packing Device Capped w/Cement 323.00 325.00 0
1985-03-07 Packing Device Capped w/Cement 255.80 263.80 0
1958-10-16 Hydra Jet Perforation 1485.60 1485.60 0
1958-10-16 Cement Squeeze 1485.60 1485.60 0
1958-10-17 Perforation 1741.60 1745.90 13
1958-10-17 Acid Treatment 1741.60 1745.90 0
1958-10-17 Acid Wash 1741.60 1745.90 0
1958-10-18 Perforation 1483.50 1483.80 26
1958-10-19 Acid Treatment 1483.50 1483.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0

For data sources see[5]

References