X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484272215000

Well Details

Well ID: 0484272215000
Loading map...
Location: 00/15-22-048-27W4/0
Location Alias: 00/15-22-48-27 W4M
Location Alias 2: 00/15-22-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 22
County/Municipality: Leduc County
Well Name: ESSO B4 WIZARD 15-22MU-48-27
Operator Name: Imperial Oil Resources Limited
License Number: 0003411
License Date: 1951-08-30
License Status: Abandoned
Spud Date: 1951-09-30
Final Drill Date: 1951-12-06
Well Total Depth: 2137.80 m
Surface Hole Latitude: 53.161368
Surface Hole Longitude: -113.863243

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-08-30 Obtained License
1951-10-10 Drill Stem Test Performed
1951-10-11 Drill Stem Test Performed
1951-10-13 Drill Stem Test Performed
1951-10-22 Drill Stem Test Performed
1951-10-25 Drill Stem Test Performed
1951-10-27 Drill Stem Test Performed
1951-10-30 Drill Stem Test Performed
1951-11-17 Drill Stem Test Performed
1951-11-19 Drill Stem Test Performed
1951-11-25 Production Casing Operation Performed
1951-12-06 Finished Drilling
1951-12-06 Perforation Treatment Performed - Open-Hole Completion
1951-12-06 Well Mode changed to Drilled and Cased
1951-12-07 Well Began Production
1951-12-07 Well Fluid changed to Crude Oil
1951-12-07 Well Mode changed to Flowing
1955-08-31 Well Fluid changed to Liquid Petroleum Gas
1955-08-31 Well Type changed to Storage
1960-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-05-26 Perforation Treatment Performed - Jet Perforation
1960-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-09-28 Perforation Treatment Performed - Cement Squeeze
1969-10-06 Perforation Treatment Performed - Cement Squeeze
1969-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-10-08 Perforation Treatment Performed - Cement Squeeze
1969-10-14 Perforation Treatment Performed - Open-Hole Completion
1969-12-01 Well Began Injection
1969-12-01 Well Fluid changed to Gas
1969-12-01 Well Type changed to Injection
1971-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-08-23 Perforation Treatment Performed - Condensate Squeeze
1972-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-12-01 Well Log Performed
1983-12-13 Perforation Treatment Performed - Open-Hole Completion
1983-12-13 Well Log Performed
1983-12-14 Well Log Performed
1983-12-17 Well Log Performed
1983-12-19 Perforation Treatment Performed - Chemical Squeeze
1983-12-20 Perforation Treatment Performed - Fractured
1984-02-28 Well Log Performed
1984-05-10 Well Log Performed
1984-08-20 Well Log Performed
1984-12-03 Well Log Performed
1985-05-16 Well Log Performed
1985-08-06 Well Log Performed
1985-11-02 Well Log Performed
1985-11-05 Perforation Treatment Performed - Fractured
1985-12-05 Well Log Performed
1986-06-17 Well Log Performed
1986-08-02 Well Log Performed
1986-10-02 Well Log Performed
1986-11-04 Well Log Performed
1987-02-09 Well Log Performed
1987-06-11 Well Log Performed
1987-08-10 Well Log Performed
1987-11-16 Well Log Performed
1988-11-02 Well Log Performed
1989-02-06 Well Log Performed
1989-02-24 Well Log Performed
1989-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-25 Perforation Treatment Performed - Cement Squeeze
1989-02-25 Perforation Treatment Performed - Jet Perforation
1989-03-03 Perforation Treatment Performed - Open-Hole Completion
1989-03-03 Well Log Performed
1989-05-01 Well Fluid changed to Water
1989-05-01 Well Type changed to Injection
1992-12-06 Well Log Performed
1993-02-24 Well Log Performed
1993-06-03 Well Log Performed
1993-09-01 Well Fluid changed to Water
1993-09-01 Well Mode changed to Suspended
1993-09-01 Well Type changed to Injection
2003-03-11 Well Log Performed
2003-06-05 Perforation Treatment Performed - Cement Plug
2003-06-06 Perforation Treatment Performed - Cement Plug
2003-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-07-07 Well Fluid changed to Crude Oil
2003-07-07 Well Mode changed to Flowing
2007-06-14 Perforation Treatment Performed - Cement Plug
2007-06-14 Well Log Performed
2010-06-01 Well Fluid changed to Crude Oil
2010-06-01 Well Mode changed to Suspended
2013-06-01 Well Fluid changed to Crude Oil
2013-06-01 Well Mode changed to Flowing
2013-06-14 Well Log Performed
2013-06-17 Well Log Performed
2013-06-18 Perforation Treatment Performed - Jet Perforation
2013-06-18 Well Log Performed
2013-07-01 Well Fluid changed to Crude Oil
2013-07-01 Well Mode changed to Suspended
2013-07-04 Perforation Treatment Performed - Cement Plug
2013-07-04 Perforation Treatment Performed - Remedial Casing
2013-07-04 Plug Back Performed
2013-07-04 Well Fluid changed to Crude Oil
2013-07-04 Well Mode changed to Abandoned Zone
2013-07-11 Perforation Treatment Performed - Jet Perforation
2013-07-11 Well Log Performed
2013-07-12 Perforation Treatment Performed - Cement Plug
2013-07-12 Perforation Treatment Performed - Remedial Casing
2014-11-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-12-06 Open Hole/Barefoot Completion 1809.30 1863.20 0
1969-10-14 Open Hole/Barefoot Completion 1809.30 1863.20 0
1971-08-03 Acid Treatment 1809.30 1863.20 0
1972-08-20 Acid Treatment 1809.30 1863.20 0
1972-08-23 Condensate Squeeze 1809.30 1863.20 0
1972-08-24 Acid Treatment 1809.30 1863.20 0
1972-08-31 Acid Treatment 1809.30 1863.20 0
1973-09-10 Acid Treatment 1809.30 1863.20 0
1983-12-13 Open Hole/Barefoot Completion 1809.30 2020.00 0
1983-12-19 Chemical Squeeze 1809.30 2020.00 0
1983-12-20 Fracture 1809.30 2020.00 0
1960-05-25 Packing Device Capped w/Cement 1787.70 1787.70 0
1985-11-05 Fracture 1809.30 2020.00 0
1989-02-25 Perforation 1425.20 1429.50 7
1989-02-25 Perforation 1448.40 1452.10 13
1989-02-25 Acid Treatment 1425.20 1452.10 0
1989-02-25 Cement Squeeze 1425.20 1452.10 0
1989-03-03 Open Hole/Barefoot Completion 1809.00 2137.80 0
2003-06-05 Cement Plug 1940.00 1942.00 0
2003-06-06 Cement Plug 1936.00 1940.00 0
2003-06-24 Acid Treatment 1811.20 1936.00 0
2007-06-14 Cement Plug 1900.00 1902.00 0
1960-05-26 Perforation 1448.40 1452.10 13
2013-06-18 Perforation 716.00 717.00 17
2013-06-18 Perforation 450.20 451.20 17
2013-07-04 Remedial Casing Cementing 450.20 717.00 0
2013-07-04 Cement Plug 1593.00 1936.00 0
2013-07-04 Cement Plug 440.40 1592.00 0
2013-07-11 Perforation 411.00 412.00 17
2013-07-11 Perforation 385.00 386.00 17
2013-07-11 Perforation 345.00 346.00 17
2013-07-11 Perforation 304.00 305.00 17
2013-07-11 Perforation 274.00 275.00 17
1960-05-26 Perforation 1425.20 1429.50 7
2013-07-11 Perforation 233.00 234.00 17
2013-07-11 Perforation 209.00 210.00 17
2013-07-11 Perforation 202.00 203.00 17
2013-07-12 Remedial Casing Cementing 202.00 412.00 0
2013-07-12 Cement Plug 195.50 440.00 0
2013-07-12 Cement Plug 187.00 195.00 0
1960-05-28 Acid Treatment 1448.40 1452.10 0
1969-09-28 Cement Squeeze 1425.20 1452.10 0
1969-10-06 Cement Squeeze 1448.40 1452.10 0
1969-10-08 Acid Treatment 1448.40 1452.10 0
1969-10-08 Cement Squeeze 1448.40 1452.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
2003 2127 0.0 0.0 0.0
2004 579 0.0 0.0 0.0
2005 2863 0.0 0.0 0.0
2006 7823 0.0 0.0 0.0
2007 8692 0.0 0.0 0.0
2008 2317 0.0 0.0 0.0
2013 8 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-07-13 No Incident Encountered 0.00 0.00
2013-08-22 No Incident Encountered 0.00 0.00
2013-07-12 No Incident Encountered 0.00 0.00

For data sources see[6]

References