X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484272702003

Well Details

Well ID: 0484272702003
Loading map...
Location: 00/02-27-048-27W4/3
Location Alias: 00/02-27-48-27 W4M
Location Alias 2: 00/02-27-048-27 W4/03
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 27
County/Municipality: Leduc County
Well Name: ESSO CPR A1 WIZARD 2-27MU-48-27
Operator Name: Imperial Oil Resources Limited
License Number: 0003775
License Date: 1951-11-14
License Status: Abandoned
Spud Date: 1951-12-11
Final Drill Date: 1952-02-14
Well Total Depth: 2024.00 m
Surface Hole Latitude: 53.165278
Surface Hole Longitude: -113.863406

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-11-14 Obtained License
1952-01-01 Drill Stem Test Performed
1952-01-03 Drill Stem Test Performed
1952-01-05 Drill Stem Test Performed
1952-01-06 Drill Stem Test Performed
1952-01-07 Drill Stem Test Performed
1952-01-26 Drill Stem Test Performed
1952-01-28 Drill Stem Test Performed
1952-02-07 Production Casing Operation Performed
1952-02-14 Finished Drilling
1952-02-14 Perforation Treatment Performed - Open-Hole Completion
1952-02-14 Well Mode changed to Drilled and Cased
1958-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1958-09-13 Perforation Treatment Performed - Jet Perforation
1958-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-09-14 Perforation Treatment Performed - Jet Perforation
1958-09-19 Well Began Production
1958-09-19 Well Fluid changed to Crude Oil
1958-09-19 Well Mode changed to Flowing
1958-10-29 Perforation Treatment Performed - Cement Squeeze
1958-10-31 Perforation Treatment Performed - Abrasa-Jet Perforation
1958-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-11-01 Perforation Treatment Performed - Cement Squeeze
1958-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-11-04 Perforation Treatment Performed - Jet Perforation
1958-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-11-05 Perforation Treatment Performed - Jet Perforation
1958-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-11-08 Perforation Treatment Performed - Jet Perforation
1958-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-12-04 Well Fluid changed to Crude Oil
1958-12-04 Well Mode changed to Pumping
1960-02-15 Perforation Treatment Performed - Cement Squeeze
1960-02-16 Perforation Treatment Performed - Jet Perforation
1960-04-06 Well Fluid changed to Gas
1960-04-06 Well Mode changed to Flowing
1981-06-11 Perforation Treatment Performed - Cement Squeeze
1981-06-16 Perforation Treatment Performed - Cement Squeeze
1981-06-20 Perforation Treatment Performed - Open-Hole Completion
1981-06-20 Well Fluid changed to Gas
1981-06-20 Well Mode changed to Abandoned Zone
1984-01-25 Well Log Performed
1984-05-09 Well Log Performed
1984-08-17 Well Log Performed
1984-12-04 Well Log Performed
1985-05-16 Well Log Performed
1985-05-23 Perforation Treatment Performed - Open-Hole Completion
1985-05-27 Liner Casing Operation Performed
1985-05-27 Perforation Treatment Performed - Cement Squeeze
1985-05-29 Well Log Performed
1985-05-30 Perforation Treatment Performed - Jet Perforation
1985-05-31 Well Log Performed
1985-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-20 Well Log Performed
1987-03-07 Perforation Treatment Performed - Jet Perforation
1987-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-23 Perforation Treatment Performed - Cement Squeeze
1988-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-24 Perforation Treatment Performed - Jet Perforation
1988-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-05 Perforation Treatment Performed - Cement Squeeze
1991-02-06 Perforation Treatment Performed - Cement Squeeze
1991-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-11 Perforation Treatment Performed - Cement Squeeze
1991-02-13 Perforation Treatment Performed - Jet Perforation
1991-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-15 Perforation Treatment Performed - Cement Squeeze
1991-02-17 Perforation Treatment Performed - Jet Perforation
1991-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-06-17 Perforation Treatment Performed - Jet Perforation
1999-06-18 Well Log Performed
1999-06-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-10-04 Perforation Treatment Performed - Jet Perforation
2006-10-04 Well Log Performed
2008-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-07 Plug Back Performed
2008-03-07 Well Log Performed
2008-03-08 Perforation Treatment Performed - Jet Perforation
2008-03-08 Well Log Performed
2008-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-09 Perforation Treatment Performed - Jet Perforation
2008-03-09 Perforation Treatment Performed - Remedial Casing
2008-03-09 Well Log Performed
2008-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-10 Perforation Treatment Performed - Remedial Casing
2008-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-11 Perforation Treatment Performed - Jet Perforation
2008-03-11 Perforation Treatment Performed - Remedial Casing
2008-03-11 Well Log Performed
2008-03-12 Perforation Treatment Performed - Jet Perforation
2008-03-12 Well Log Performed
2008-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-14 Perforation Treatment Performed - Remedial Casing
2010-10-26 Well Abandoned
2010-10-26 Well Fluid changed to Gas
2010-10-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-02-14 Open Hole/Barefoot Completion 1885.20 1930.00 0
1958-11-01 Acid Treatment 1470.10 1470.10 0
1958-11-01 Cement Squeeze 1470.10 1470.10 0
1958-11-04 Perforation 1749.60 1751.10 13
1958-11-04 Perforation 1743.80 1745.30 13
1958-11-04 Acid Treatment 1743.80 1751.10 0
1958-11-05 Acid Treatment 1743.80 1751.10 0
1958-11-05 Perforation 1734.30 1738.00 13
1958-11-07 Acid Treatment 1734.30 1751.10 0
1958-11-08 Perforation 1468.50 1468.80 26
1958-11-09 Acid Treatment 1468.50 1468.80 0
1958-09-12 Packing Device Capped w/Cement 1770.90 1770.90 0
1960-02-15 Cement Squeeze 1468.50 1468.80 0
1960-02-16 Perforation 1449.60 1453.90 7
1981-06-11 Cement Squeeze 1449.60 1453.90 0
1981-06-16 Cement Squeeze 1734.30 1751.10 0
1981-06-20 Open Hole/Barefoot Completion 1885.20 2011.00 0
1985-05-23 Open Hole/Barefoot Completion 1885.20 2024.00 0
1985-05-27 Cement Squeeze 1885.20 2024.00 0
1985-05-30 Perforation 1973.20 1973.70 13
1985-06-01 Acid Treatment 1973.20 1973.70 0
1987-03-07 Perforation 1979.30 1979.80 7
1958-09-13 Perforation 1729.70 1732.20 13
1987-03-10 Acid Treatment 1973.20 1979.80 0
1988-02-23 Cement Squeeze 1973.20 1979.80 0
1988-02-24 Perforation 1895.00 1895.50 13
1988-02-24 Perforation 1987.50 1988.50 13
1988-02-24 Acid Treatment 1987.50 1988.50 0
1988-02-25 Acid Treatment 1895.00 1895.50 0
1991-02-05 Cement Squeeze 1895.00 1895.50 0
1991-02-06 Cement Squeeze 1895.00 1895.50 0
1991-02-11 Acid Treatment 1987.50 1988.50 0
1991-02-11 Cement Squeeze 1987.50 1988.50 0
1958-09-13 Perforation 1733.40 1735.80 13
1991-02-13 Perforation 1895.00 1895.50 7
1991-02-13 Perforation 1990.50 1991.50 13
1991-02-13 Perforation 1993.50 1994.50 13
1991-02-13 Perforation 1996.50 1997.50 13
1991-02-14 Acid Treatment 1990.50 1995.00 0
1991-02-15 Cement Squeeze 1987.50 1988.50 0
1991-02-17 Perforation 1990.50 1991.50 13
1991-02-17 Perforation 1993.50 1994.50 13
1991-02-17 Perforation 1996.50 1997.50 13
1991-02-18 Acid Treatment 1996.50 1997.50 0
1958-09-14 Acid Treatment 1729.70 1735.80 0
1991-02-19 Acid Treatment 1895.00 1997.50 0
1999-06-17 Perforation 2003.00 2003.50 20
1999-06-17 Perforation 2005.60 2006.10 20
1999-06-23 Acid Treatment 2003.00 2006.10 0
2006-10-04 Perforation 1924.00 1928.00 13
2006-10-04 Perforation 1885.00 1891.00 13
2008-03-07 Packing Device Capped w/Cement 1343.00 1874.00 0
2008-03-08 Perforation 1235.00 1236.00 17
2008-03-09 Remedial Casing Cementing 1235.00 1236.00 0
2008-03-09 Packing Device Capped w/Cement 1150.00 1225.00 0
1958-09-14 Perforation 1468.80 1469.10 13
2008-03-09 Perforation 437.00 438.00 17
2008-03-10 Remedial Casing Cementing 437.00 438.00 0
2008-03-10 Packing Device Capped w/Cement 420.50 428.50 0
2008-03-11 Perforation 285.00 286.00 17
2008-03-11 Remedial Casing Cementing 285.00 286.00 0
2008-03-11 Packing Device Capped w/Cement 264.50 272.50 0
2008-03-12 Perforation 230.00 231.00 17
2008-03-12 Perforation 210.00 211.00 17
2008-03-12 Perforation 197.00 198.00 17
2008-03-14 Remedial Casing Cementing 197.00 231.00 0
1958-10-29 Cement Squeeze 1729.70 1735.80 0
2008-03-14 Packing Device Capped w/Cement 180.00 186.00 0
1958-10-29 Cement Squeeze 1468.80 1469.10 0
1958-10-31 Hydra Jet Perforation 1470.10 1470.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1701 0.0 0.0 0.0
1969 3901 0.0 0.0 0.0
1970 1387 0.0 0.0 0.0
1971 2574 0.0 0.0 0.0
1972 566 0.0 0.0 0.0
1973 14 0.0 0.0 0.0
1974 2698 0.0 0.0 0.0
1975 8015 0.0 0.0 0.0

For data sources see[5]

References