If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485121615000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.12611,"lon":-115.692112,"icon":""}]} |
Location: 00/15-16-048-12W5/0 | |
Location Alias: 00/15-16-48-12 W5M | |
Location Alias 2: 00/15-16-048-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 12 | |
Section: 16 | |
County/Municipality: Yellowhead County | |
Well Name: BACCALIEU BRAZR 15-16-48-12 | |
Operator Name: Baccalieu Energy Inc. | |
License Number: 0487084 | |
License Date: 2017-12-12 | |
License Status: Amended | |
Spud Date: 2018-01-30 | |
Final Drill Date: 2018-02-09 | |
Well Total Depth: 4257.00 m | |
Surface Hole Latitude: 53.126110 | |
Surface Hole Longitude: -115.692112 |
Date | Event |
---|---|
2017-12-12 | Obtained License |
2018-02-01 | Surface Casing Operation Performed |
2018-02-04 | Direction Drilling Operation Performed - Deviate |
2018-02-05 | Direction Drilling Operation Performed - Horizontal |
2018-02-09 | Finished Drilling |
2018-02-09 | Well Log Performed |
2018-02-09 | Well Mode changed to Drilled and Cased |
2018-02-10 | Well Log Performed |
2018-02-11 | Production Casing Operation Performed |
2018-02-11 | Rig Released |
2018-02-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-05 | Well Began Production |
2018-03-05 | Well Fluid changed to Crude Oil |
2018-03-05 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-01-30 | Ensign Drilling Inc. | 544 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-02-04 | 1725.80 | Deviate (5 - 79 degrees) |
2018-02-05 | 2059.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-02-28 | Multi-Stage Fracture | 4213.60 | 4213.70 | 0 |
2018-03-01 | Multi-Stage Fracture | 3727.10 | 3727.20 | 0 |
2018-03-01 | Multi-Stage Fracture | 3668.90 | 3669.00 | 0 |
2018-03-01 | Multi-Stage Fracture | 3611.50 | 3611.60 | 0 |
2018-03-01 | Multi-Stage Fracture | 3553.70 | 3553.80 | 0 |
2018-03-01 | Multi-Stage Fracture | 3496.20 | 3496.30 | 0 |
2018-03-01 | Multi-Stage Fracture | 3438.90 | 3439.00 | 0 |
2018-03-01 | Multi-Stage Fracture | 3381.90 | 3382.00 | 0 |
2018-03-01 | Multi-Stage Fracture | 3327.20 | 3327.30 | 0 |
2018-03-01 | Multi-Stage Fracture | 3269.40 | 3269.50 | 0 |
2018-03-01 | Multi-Stage Fracture | 3210.60 | 3210.70 | 0 |
2018-02-28 | Multi-Stage Fracture | 4171.20 | 4171.30 | 0 |
2018-03-01 | Multi-Stage Fracture | 3152.50 | 3152.60 | 0 |
2018-03-01 | Multi-Stage Fracture | 3094.10 | 3094.20 | 0 |
2018-03-01 | Multi-Stage Fracture | 3035.50 | 3035.60 | 0 |
2018-03-01 | Multi-Stage Fracture | 2976.80 | 2976.90 | 0 |
2018-03-01 | Multi-Stage Fracture | 2918.30 | 2918.40 | 0 |
2018-03-01 | Multi-Stage Fracture | 2859.20 | 2859.30 | 0 |
2018-03-01 | Multi-Stage Fracture | 2800.40 | 2800.50 | 0 |
2018-03-01 | Multi-Stage Fracture | 2741.40 | 2741.50 | 0 |
2018-03-01 | Multi-Stage Fracture | 2682.50 | 2682.60 | 0 |
2018-03-01 | Multi-Stage Fracture | 2623.50 | 2623.60 | 0 |
2018-02-28 | Multi-Stage Fracture | 4126.40 | 4126.50 | 0 |
2018-03-01 | Multi-Stage Fracture | 2565.20 | 2565.30 | 0 |
2018-03-01 | Multi-Stage Fracture | 2506.30 | 2506.40 | 0 |
2018-03-01 | Multi-Stage Fracture | 2447.40 | 2447.50 | 0 |
2018-03-01 | Multi-Stage Fracture | 2388.50 | 2388.60 | 0 |
2018-03-01 | Multi-Stage Fracture | 2329.50 | 2329.60 | 0 |
2018-03-01 | Multi-Stage Fracture | 2270.60 | 2270.70 | 0 |
2018-03-01 | Multi-Stage Fracture | 2211.60 | 2211.70 | 0 |
2018-03-02 | Multi-Stage Fracture | 2166.20 | 2166.30 | 0 |
2018-03-02 | Multi-Stage Fracture | 2120.80 | 2120.90 | 0 |
2018-03-02 | Multi-Stage Fracture | 2075.30 | 2075.40 | 0 |
2018-02-28 | Multi-Stage Fracture | 4067.80 | 4067.90 | 0 |
2018-02-28 | Multi-Stage Fracture | 4009.50 | 4009.60 | 0 |
2018-02-28 | Multi-Stage Fracture | 3954.60 | 3954.70 | 0 |
2018-02-28 | Multi-Stage Fracture | 3896.10 | 3896.20 | 0 |
2018-03-01 | Multi-Stage Fracture | 3841.10 | 3841.20 | 0 |
2018-03-01 | Multi-Stage Fracture | 3784.30 | 3784.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-02-28 | 2018-03-02 | 1,954 | 5,303 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 95.2101 | N/A | |||
30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 5.0487 | N/A | ||
ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0101 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0101 | N/A | ||||
ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.1014 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.1014 | N/A | ||||
ELEFR-3A | Element | Friction Reducer | Non-hazardous Ingredients | Not Available | 100 | 0.0486 | N/A | |
Tergitol 15-S-20 | 68131-40-8 | 100 | 0.0486 | N/A | ||||
ELEScale-2 | Element | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 100 | 0.0247 | N/A | |
Methanol | 67-56-1 | 100 | 0.0246 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0246 | N/A | ||||
Organophosphonate | 15827-60-8 | 100 | 0.0246 | N/A | ||||
ELEFE-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0486 | N/A | |
Methanol | 67-56-1 | 100 | 0.0486 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0486 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-02-27 | 2018-03-01 | Surface Water - River | 4020 |
2018-03-01 | 2018-03-01 | Surface Water - River | 1215 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 7032 | 0.0 | 0.0 | 0.0 |
2019 | 7734 | 0.0 | 0.0 | 0.0 |
2020 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-02-11 | No Incident Encountered | 0.00 | 0.00 |
2018-03-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]