X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485121902020

Well Details

Well ID: 0485121902020
Loading map...
Location: 02/02-19-048-12W5/0
Location Alias: 02/02-19-48-12 W5M
Location Alias 2: 02/02-19-048-12 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 12
Section: 19
County/Municipality: Yellowhead County
Well Name: TIDEWATER BRAZR 2-19-48-12
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0078309
License Date: 1979-09-27
License Status: Abandoned
Spud Date: 1979-09-17
Final Drill Date: 1979-12-30
Well Total Depth: 3265.00 m
Surface Hole Latitude: 53.150732
Surface Hole Longitude: -115.740314

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-09-17 Direction Drilling Operation Performed - 98
1979-09-27 Obtained License
1979-12-30 Finished Drilling
1979-12-31 Well Log Performed
1980-01-05 Liner Casing Operation Performed
1980-05-22 Perforation Treatment Performed - Jet Perforation
1980-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-28 Perforation Treatment Performed - Jet Perforation
1980-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-01 Well Mode changed to Drilled and Cased
1981-07-23 Perforation Treatment Performed - Fractured
1986-03-04 Well Began Production
1986-03-04 Well Fluid changed to Gas
1986-03-04 Well Mode changed to Flowing
1988-05-16 Well Fluid changed to Gas
1988-05-16 Well Mode changed to Suspended
1998-01-16 Perforation Treatment Performed - Cement Squeeze
1998-01-16 Plug Back Performed
1998-01-21 Well Log Performed
1998-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-01-22 Perforation Treatment Performed - Jet Perforation
1998-01-22 Well Log Performed
1998-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-01-24 Perforation Treatment Performed - Remedial Casing
1998-01-24 Well Log Performed
1998-01-26 Well Abandoned
1998-01-26 Well Fluid changed to Gas
1998-01-26 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1979-09-17 2102.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-05-22 Perforation 3161.00 3166.00 6
1998-01-24 Remedial Casing Cementing 600.00 601.00 0
1998-01-24 Packing Device Capped w/Cement 213.00 592.00 0
1980-05-25 Acid Treatment 3161.00 3166.00 0
1980-05-27 Acid Treatment 3161.00 3166.00 0
1980-05-28 Perforation 3145.00 3155.00 7
1980-05-31 Acid Treatment 3145.00 3166.00 0
1981-07-23 Fracture 3145.00 3166.00 0
1998-01-16 Cement Squeeze 3145.00 3166.00 0
1998-01-22 Packing Device Capped w/Cement 2953.00 2962.00 0
1998-01-22 Perforation 600.00 601.00 15

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 81 0.0 0.0 0.0
1981 50 0.0 0.0 0.0
1986 361 0.0 0.0 0.0
1987 1 0.0 0.0 0.0
1988 3 0.0 0.0 0.0

For data sources see[6]

References