If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485122312000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.159573,"lon":-115.632392,"icon":""}]} |
Location: 00/12-23-048-12W5/0 | |
Location Alias: 00/12-23-48-12 W5M | |
Location Alias 2: 00/12-23-048-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 12 | |
Section: 23 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK PEMBINA 12-23-48-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0448217 | |
License Date: 2012-09-04 | |
License Status: Issued | |
Spud Date: 2012-10-09 | |
Final Drill Date: 2012-10-26 | |
Well Total Depth: 3539.00 m | |
Surface Hole Latitude: 53.159573 | |
Surface Hole Longitude: -115.632392 |
Date | Event |
---|---|
2012-09-04 | Obtained License |
2012-10-11 | Surface Casing Operation Performed |
2012-10-12 | Lost Circulation Occurred |
2012-10-15 | Well Log Performed |
2012-10-16 | Direction Drilling Operation Performed - Deviate |
2012-10-17 | Direction Drilling Operation Performed - Horizontal |
2012-10-17 | Well Log Performed |
2012-10-19 | Well Log Performed |
2012-10-25 | Well Log Performed |
2012-10-26 | Finished Drilling |
2012-10-26 | Well Mode changed to Drilled and Cased |
2012-10-27 | Production Casing Operation Performed |
2012-10-28 | Perforation Treatment Performed - Open-Hole Completion |
2012-10-28 | Rig Released |
2012-10-30 | Well Log Performed |
2012-11-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-13 | Well Began Production |
2012-11-13 | Well Fluid changed to Crude Oil |
2012-11-13 | Well Mode changed to Flowing |
2012-11-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-16 | Well Log Performed |
2012-12-22 | Well Fluid changed to Crude Oil |
2012-12-22 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-10-09 | Precision Drilling Corporation | 309 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-10-16 | 1609.00 | Deviate (5 - 79 degrees) |
2012-10-17 | 2098.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-10-28 | Open Hole/Barefoot Completion | 3534.00 | 3539.00 | 0 |
2012-11-14 | Multi-Stage Fracture | 2954.30 | 2954.40 | 0 |
2012-11-14 | Multi-Stage Fracture | 2892.20 | 2892.30 | 0 |
2012-11-15 | Multi-Stage Fracture | 2681.30 | 2681.40 | 0 |
2012-11-12 | Multi-Stage Fracture | 3509.30 | 3509.40 | 0 |
2012-11-12 | Multi-Stage Fracture | 3443.10 | 3443.20 | 0 |
2012-11-12 | Multi-Stage Fracture | 3370.10 | 3370.20 | 0 |
2012-11-12 | Multi-Stage Fracture | 3297.30 | 3297.40 | 0 |
2012-11-12 | Multi-Stage Fracture | 3237.90 | 3238.00 | 0 |
2012-11-12 | Multi-Stage Fracture | 3164.90 | 3165.00 | 0 |
2012-11-12 | Multi-Stage Fracture | 3091.30 | 3091.40 | 0 |
2012-11-14 | Multi-Stage Fracture | 3030.00 | 3030.10 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 268 | 0.0 | 0.0 | 0.0 |
2013 | 8685 | 0.0 | 0.0 | 0.0 |
2014 | 8567 | 0.0 | 0.0 | 0.0 |
2015 | 8703 | 0.0 | 0.0 | 0.0 |
2016 | 8743 | 0.0 | 0.0 | 0.0 |
2017 | 8664 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8613 | 0.0 | 0.0 | 0.0 |
2020 | 2125 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-10-12 | Lost Circulation | 833.00 | 1076.00 |
2012-12-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]