X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485122312000

Well Details

Well ID: 0485122312000
Loading map...
Location: 00/12-23-048-12W5/0
Location Alias: 00/12-23-48-12 W5M
Location Alias 2: 00/12-23-048-12 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 12
Section: 23
County/Municipality: Yellowhead County
Well Name: RIDGEBACK PEMBINA 12-23-48-12
Operator Name: Ridgeback Resources Inc.
License Number: 0448217
License Date: 2012-09-04
License Status: Issued
Spud Date: 2012-10-09
Final Drill Date: 2012-10-26
Well Total Depth: 3539.00 m
Surface Hole Latitude: 53.159573
Surface Hole Longitude: -115.632392

For data sources see[1][2]

Well History

Date Event
2012-09-04 Obtained License
2012-10-11 Surface Casing Operation Performed
2012-10-12 Lost Circulation Occurred
2012-10-15 Well Log Performed
2012-10-16 Direction Drilling Operation Performed - Deviate
2012-10-17 Direction Drilling Operation Performed - Horizontal
2012-10-17 Well Log Performed
2012-10-19 Well Log Performed
2012-10-25 Well Log Performed
2012-10-26 Finished Drilling
2012-10-26 Well Mode changed to Drilled and Cased
2012-10-27 Production Casing Operation Performed
2012-10-28 Perforation Treatment Performed - Open-Hole Completion
2012-10-28 Rig Released
2012-10-30 Well Log Performed
2012-11-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-13 Well Began Production
2012-11-13 Well Fluid changed to Crude Oil
2012-11-13 Well Mode changed to Flowing
2012-11-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-16 Well Log Performed
2012-12-22 Well Fluid changed to Crude Oil
2012-12-22 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-10-09 Precision Drilling Corporation 309 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-10-16 1609.00 Deviate (5 - 79 degrees)
2012-10-17 2098.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-28 Open Hole/Barefoot Completion 3534.00 3539.00 0
2012-11-14 Multi-Stage Fracture 2954.30 2954.40 0
2012-11-14 Multi-Stage Fracture 2892.20 2892.30 0
2012-11-15 Multi-Stage Fracture 2681.30 2681.40 0
2012-11-12 Multi-Stage Fracture 3509.30 3509.40 0
2012-11-12 Multi-Stage Fracture 3443.10 3443.20 0
2012-11-12 Multi-Stage Fracture 3370.10 3370.20 0
2012-11-12 Multi-Stage Fracture 3297.30 3297.40 0
2012-11-12 Multi-Stage Fracture 3237.90 3238.00 0
2012-11-12 Multi-Stage Fracture 3164.90 3165.00 0
2012-11-12 Multi-Stage Fracture 3091.30 3091.40 0
2012-11-14 Multi-Stage Fracture 3030.00 3030.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 268 0.0 0.0 0.0
2013 8685 0.0 0.0 0.0
2014 8567 0.0 0.0 0.0
2015 8703 0.0 0.0 0.0
2016 8743 0.0 0.0 0.0
2017 8664 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8613 0.0 0.0 0.0
2020 2125 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-12 Lost Circulation 833.00 1076.00
2012-12-07 No Incident Encountered 0.00 0.00

For data sources see[8]

References