X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485123508020

Well Details

Well ID: 0485123508020
Loading map...
Location: 02/08-35-048-12W5/0
Location Alias: 02/08-35-48-12 W5M
Location Alias 2: 02/08-35-048-12 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 12
Section: 35
County/Municipality: Yellowhead County
Well Name: 1107882 ACC BRAZEAU RIVER 8-35-48-12
Operator Name: Obsidian Energy Ltd.
License Number: 0134473
License Date: 1988-06-21
License Status: Issued
Spud Date: 1988-07-21
Final Drill Date: 1988-10-25
Well Total Depth: 3215.00 m
Surface Hole Latitude: 53.180023
Surface Hole Longitude: -115.640216

For data sources see[1][2]

Well History

Date Event
1988-06-21 Obtained License
1988-07-21 Lost Circulation Occurred
1988-07-24 Surface Casing Operation Performed
1988-07-27 Lost Circulation Occurred
1988-08-01 Direction Drilling Operation Performed - Deviate
1988-09-25 Well Log Performed
1988-09-29 Intermediate Casing Operation Performed
1988-09-30 Well Log Performed
1988-10-25 Finished Drilling
1988-10-25 Well Log Performed
1988-10-25 Well Mode changed to Drilled and Cased
1988-10-29 Well Log Performed
1988-10-31 Well Log Performed
1988-11-02 Liner Casing Operation Performed
1988-11-03 Well Log Performed
1988-11-04 Rig Released
1988-11-18 Well Log Performed
1988-11-24 Well Log Performed
1988-11-27 Perforation Treatment Performed - Jet Perforation
1988-11-27 Well Began Production
1988-11-27 Well Fluid changed to Crude Oil
1988-11-27 Well Log Performed
1988-11-27 Well Mode changed to Flowing
1988-12-07 Well Log Performed
1988-12-09 Perforation Treatment Performed - Jet Perforation
1988-12-09 Well Log Performed
1988-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-03-17 Perforation Treatment Performed - Jet Perforation
1989-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-03-20 Well Log Performed
1989-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-03-21 Perforation Treatment Performed - Cement Squeeze
1989-03-27 Well Log Performed
1989-03-29 Perforation Treatment Performed - Jet Perforation
1989-03-29 Well Log Performed
1989-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-04-21 Well Log Performed
1989-07-21 Perforation Treatment Performed - Cement Squeeze
1989-07-24 Perforation Treatment Performed - Jet Perforation
1989-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-08-31 Perforation Treatment Performed - Cement Squeeze
1989-09-16 Perforation Treatment Performed - Jet Perforation
1989-09-16 Well Log Performed
1989-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-01-08 Well Log Performed
1990-02-14 Perforation Treatment Performed - Jet Perforation
1990-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-05-13 Perforation Treatment Performed - Cement Plug
1995-05-15 Perforation Treatment Performed - Jet Perforation
1995-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-02-23 Well Fluid changed to Crude Oil
1999-02-23 Well Mode changed to Suspended
2005-03-03 Well Log Performed
2005-06-02 Well Fluid changed to Crude Oil
2005-06-02 Well Mode changed to Pumping
2006-04-26 Perforation Treatment Performed - Jet Perforation
2006-04-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-08-01 1601.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-11-27 Perforation 3142.00 3145.50 13
1989-07-21 Cement Squeeze 3132.50 3135.50 0
1989-07-24 Perforation 3101.50 3111.50 13
1989-07-25 Acid Treatment 3101.50 3111.50 0
1989-08-31 Cement Squeeze 3101.50 3111.50 0
1989-09-16 Perforation 3142.00 3145.50 20
1989-09-17 Acid Treatment 3142.00 3145.50 0
1990-02-14 Perforation 3155.50 3158.50 20
1990-02-20 Acid Treatment 3142.00 3158.50 0
1995-05-13 Cement Plug 3135.00 3138.00 0
1995-05-15 Perforation 3108.00 3111.00 13
1988-12-09 Perforation 3130.00 3135.00 13
1995-05-18 Acid Treatment 3108.00 3111.00 0
2006-04-26 Perforation 3126.00 3130.00 13
2006-04-27 Acid Treatment 3126.00 3130.00 0
2017-12-03 Acid Treatment 3108.00 3130.00 0
2018-06-28 Acid Treatment 3108.00 3130.00 0
1988-12-10 Acid Treatment 3130.00 3135.00 0
1989-03-17 Perforation 3130.00 3131.00 10
1989-03-19 Acid Treatment 3130.00 3135.00 0
1989-03-21 Acid Treatment 3130.00 3135.00 0
1989-03-21 Cement Squeeze 3130.00 3135.00 0
1989-03-29 Perforation 3132.50 3135.50 13
1989-03-30 Acid Treatment 3132.50 3135.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 697 0.0 0.0 0.0
1989 6757 0.0 0.0 0.0
1990 5447 0.0 0.0 0.0
1991 4361 0.0 0.0 0.0
1992 5453 0.0 0.0 0.0
1993 3794 0.0 0.0 0.0
1994 3548 0.0 0.0 0.0
1995 7890 0.0 0.0 0.0
1996 8549 0.0 0.0 0.0
1997 3990 0.0 0.0 0.0
2005 854 0.0 0.0 0.0
2006 5466 0.0 0.0 0.0
2007 8585 0.0 0.0 0.0
2008 8712 0.0 0.0 0.0
2009 8541 0.0 0.0 0.0
2010 8738 0.0 0.0 0.0
2011 7953 0.0 0.0 0.0
2012 7029 0.0 0.0 0.0
2013 7710 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8400 0.0 0.0 0.0
2016 6326 0.0 0.0 0.0
2017 8085 0.0 0.0 0.0
2018 8266 0.0 0.0 0.0
2019 8676 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-07-21 Lost Circulation 43.00 43.00
1988-07-27 Lost Circulation 835.00 870.00
2017-12-03 No Incident Encountered 0.00 0.00
2018-06-28 No Incident Encountered 0.00 0.00

For data sources see[7]

References