X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485123509000

Well Details

Well ID: 0485123509000
Loading map...
Location: 00/09-35-048-12W5/0
Location Alias: 00/09-35-48-12 W5M
Location Alias 2: 00/09-35-048-12 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 12
Section: 35
County/Municipality: Yellowhead County
Well Name: VEI PEMBINA 9-35-48-12
Operator Name: Vermilion Energy Inc.
License Number: 0065757
License Date: 1977-09-16
License Status: Issued
Spud Date: 1977-10-12
Final Drill Date: 1977-11-30
Well Total Depth: 3172.10 m
Surface Hole Latitude: 53.188797
Surface Hole Longitude: -115.637982

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-09-16 Obtained License
1977-11-14 Drill Stem Test Performed
1977-11-30 Finished Drilling
1977-11-30 Perforation Treatment Performed - Open-Hole Completion
1977-11-30 Well Mode changed to Drilled and Cased
1977-12-04 Drill Stem Test Performed
1977-12-09 Rig Released
1978-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-08 Perforation Treatment Performed - Jet Perforation
1978-01-09 Well Began Production
1978-01-09 Well Fluid changed to Crude Oil
1978-01-09 Well Mode changed to Flowing
1979-06-29 Liner Casing Operation Performed
1981-06-12 Perforation Treatment Performed - Cement Squeeze
1981-06-19 Perforation Treatment Performed - Jet Perforation
1981-06-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-15 Perforation Treatment Performed - Jet Perforation
1982-11-15 Well Began Injection
1982-11-15 Well Fluid changed to Water
1982-11-15 Well Type changed to Injection
1982-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-20 Perforation Treatment Performed - Cement Squeeze
1982-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-15 Well Log Performed
1985-05-10 Well Fluid changed to Crude Oil
1985-05-10 Well Mode changed to Flowing
1985-05-25 Well Log Performed
1986-01-11 Perforation Treatment Performed - Bridge Plug No Cement Required
1986-01-11 Perforation Treatment Performed - Jet Perforation
1986-01-15 Perforation Treatment Performed - Cement Squeeze
1986-01-19 Perforation Treatment Performed - Jet Perforation
1986-01-20 Perforation Treatment Performed - Cement Squeeze
1986-01-27 Perforation Treatment Performed - Jet Perforation
1986-01-29 Perforation Treatment Performed - Jet Perforation
1986-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-01-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-31 Perforation Treatment Performed - Jet Perforation
1990-06-29 Perforation Treatment Performed - Cement Squeeze
1990-07-10 Well Log Performed
1990-07-11 Well Log Performed
1990-07-12 Perforation Treatment Performed - Jet Perforation
1990-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-30 Perforation Treatment Performed - Jet Perforation
1990-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-23 Well Fluid changed to Crude Oil
1999-03-23 Well Mode changed to Suspended
2006-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-12-15 Plug Back Performed
2006-12-15 Well Fluid changed to Crude Oil
2006-12-15 Well Log Performed
2006-12-15 Well Mode changed to Abandoned Zone
2006-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-12-16 Well Log Performed
2006-12-19 Perforation Treatment Performed - Jet Perforation
2006-12-20 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-11-30 Open Hole/Barefoot Completion 3032.80 3172.10 0
1982-11-20 Cement Squeeze 3035.80 3048.60 0
1982-11-26 Acid Treatment 3093.70 3108.90 0
1984-02-15 Acid Treatment 3093.70 3108.90 0
1986-01-11 Bridge Plug, No Cement 3089.10 3092.00 0
1986-01-11 Perforation 3081.00 3083.00 13
1986-01-15 Cement Squeeze 3081.00 3083.00 0
1986-01-19 Perforation 3079.50 3081.50 13
1986-01-20 Cement Squeeze 3079.50 3108.90 0
1986-01-27 Perforation 3096.70 3098.50 13
1986-01-29 Perforation 3093.70 3096.70 13
1978-01-08 Perforation 3037.30 3043.40 13
1986-01-30 Acid Treatment 3093.70 3098.50 0
1987-01-16 Acid Treatment 3093.70 3098.50 0
1987-08-31 Perforation 3073.60 3079.10 13
1990-06-29 Cement Squeeze 3073.60 3098.50 0
1990-07-12 Perforation 3105.90 3108.90 20
1990-07-13 Acid Treatment 3105.90 3108.90 0
1990-07-30 Perforation 3110.50 3113.50 20
1990-07-31 Acid Treatment 3110.50 3113.50 0
2006-12-13 Packing Device Capped w/Cement 3093.00 3101.00 0
2006-12-15 Packing Device Capped w/Cement 3015.00 3023.00 0
1978-01-08 Acid Treatment 3032.80 3172.10 0
2006-12-15 Packing Device Capped w/Cement 2967.00 2975.00 0
2006-12-16 Packing Device Capped w/Cement 2330.00 2335.00 0
2006-12-19 Perforation 2270.00 2276.00 20
2006-12-20 Fracture 2270.00 2276.00 0
1981-06-12 Cement Squeeze 3032.80 3172.10 0
1981-06-19 Perforation 3035.80 3048.60 7
1981-06-23 Acid Treatment 3035.80 3048.60 0
1982-11-15 Perforation 3093.70 3096.70 13
1982-11-15 Perforation 3105.90 3108.90 13
1982-11-16 Acid Treatment 3093.70 3108.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 3837 0.0 0.0 0.0
1979 4344 0.0 0.0 0.0
1980 7435 0.0 0.0 0.0
1981 5543 0.0 0.0 0.0
1982 5330 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 4016 0.0 0.0 0.0
1986 4110 0.0 0.0 0.0
1987 3072 0.0 0.0 0.0
1988 87 0.0 0.0 0.0
1990 621 0.0 0.0 0.0
1991 21 0.0 0.0 0.0
1994 117 0.0 0.0 0.0
1997 24 0.0 0.0 0.0

For data sources see[5]

References