X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485123509002

Well Details

Well ID: 0485123509002
Loading map...
Location: 00/09-35-048-12W5/2
Location Alias: 00/09-35-48-12 W5M
Location Alias 2: 00/09-35-048-12 W5/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 12
Section: 35
County/Municipality: Yellowhead County
Well Name: VEI PEMBINA 9-35-48-12
Operator Name: Vermilion Energy Inc.
License Number: 0065757
License Date: 1977-09-16
License Status: Issued
Spud Date: 1977-10-12
Final Drill Date: 1977-11-30
Well Total Depth: 3172.10 m
Surface Hole Latitude: 53.188797
Surface Hole Longitude: -115.637982

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-09-16 Obtained License
1977-11-14 Drill Stem Test Performed
1977-11-30 Finished Drilling
1977-11-30 Perforation Treatment Performed - Open-Hole Completion
1977-11-30 Well Mode changed to Drilled and Cased
1977-12-04 Drill Stem Test Performed
1977-12-09 Rig Released
1978-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-08 Perforation Treatment Performed - Jet Perforation
1979-06-29 Liner Casing Operation Performed
1981-06-12 Perforation Treatment Performed - Cement Squeeze
1981-06-19 Perforation Treatment Performed - Jet Perforation
1981-06-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-15 Perforation Treatment Performed - Jet Perforation
1982-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-20 Perforation Treatment Performed - Cement Squeeze
1982-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-15 Well Log Performed
1985-05-25 Well Log Performed
1986-01-11 Perforation Treatment Performed - Bridge Plug No Cement Required
1986-01-11 Perforation Treatment Performed - Jet Perforation
1986-01-15 Perforation Treatment Performed - Cement Squeeze
1986-01-19 Perforation Treatment Performed - Jet Perforation
1986-01-20 Perforation Treatment Performed - Cement Squeeze
1986-01-27 Perforation Treatment Performed - Jet Perforation
1986-01-29 Perforation Treatment Performed - Jet Perforation
1986-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-01-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-31 Perforation Treatment Performed - Jet Perforation
1990-06-29 Perforation Treatment Performed - Cement Squeeze
1990-07-10 Well Log Performed
1990-07-11 Well Log Performed
1990-07-12 Perforation Treatment Performed - Jet Perforation
1990-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-30 Perforation Treatment Performed - Jet Perforation
1990-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-12-15 Plug Back Performed
2006-12-15 Well Log Performed
2006-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-12-16 Well Log Performed
2006-12-19 Perforation Treatment Performed - Jet Perforation
2006-12-20 Perforation Treatment Performed - Fractured
2007-03-09 Well Began Production
2007-03-09 Well Fluid changed to Gas
2007-03-09 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-11-30 Open Hole/Barefoot Completion 3032.80 3172.10 0
1982-11-20 Cement Squeeze 3035.80 3048.60 0
1982-11-26 Acid Treatment 3093.70 3108.90 0
1984-02-15 Acid Treatment 3093.70 3108.90 0
1986-01-11 Bridge Plug, No Cement 3089.10 3092.00 0
1986-01-11 Perforation 3081.00 3083.00 13
1986-01-15 Cement Squeeze 3081.00 3083.00 0
1986-01-19 Perforation 3079.50 3081.50 13
1986-01-20 Cement Squeeze 3079.50 3108.90 0
1986-01-27 Perforation 3096.70 3098.50 13
1986-01-29 Perforation 3093.70 3096.70 13
1978-01-08 Perforation 3037.30 3043.40 13
1986-01-30 Acid Treatment 3093.70 3098.50 0
1987-01-16 Acid Treatment 3093.70 3098.50 0
1987-08-31 Perforation 3073.60 3079.10 13
1990-06-29 Cement Squeeze 3073.60 3098.50 0
1990-07-12 Perforation 3105.90 3108.90 20
1990-07-13 Acid Treatment 3105.90 3108.90 0
1990-07-30 Perforation 3110.50 3113.50 20
1990-07-31 Acid Treatment 3110.50 3113.50 0
2006-12-13 Packing Device Capped w/Cement 3093.00 3101.00 0
2006-12-15 Packing Device Capped w/Cement 3015.00 3023.00 0
1978-01-08 Acid Treatment 3032.80 3172.10 0
2006-12-15 Packing Device Capped w/Cement 2967.00 2975.00 0
2006-12-16 Packing Device Capped w/Cement 2330.00 2335.00 0
2006-12-19 Perforation 2270.00 2276.00 20
2006-12-20 Fracture 2270.00 2276.00 0
1981-06-12 Cement Squeeze 3032.80 3172.10 0
1981-06-19 Perforation 3035.80 3048.60 7
1981-06-23 Acid Treatment 3035.80 3048.60 0
1982-11-15 Perforation 3093.70 3096.70 13
1982-11-15 Perforation 3105.90 3108.90 13
1982-11-16 Acid Treatment 3093.70 3108.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 5055 0.0 0.0 0.0
2008 8695 0.0 0.0 0.0
2009 8027 0.0 0.0 0.0
2010 8568 0.0 0.0 0.0
2011 8720 0.0 0.0 0.0
2012 8321 0.0 0.0 0.0
2013 8705 0.0 0.0 0.0
2014 8039 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8585 0.0 0.0 0.0
2018 8034 0.0 0.0 0.0
2019 8328 0.0 0.0 0.0
2020 1955 0.0 0.0 0.0

For data sources see[5]

References