X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485123509022

Well Details

Well ID: 0485123509022
Loading map...
Location: 02/09-35-048-12W5/2
Location Alias: 02/09-35-48-12 W5M
Location Alias 2: 02/09-35-048-12 W5/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 12
Section: 35
County/Municipality: Yellowhead County
Well Name: RIDGEBACK PEMBINA 9-35-48-12
Operator Name: Ridgeback Resources Inc.
License Number: 0075222
License Date: 1979-04-12
License Status: Suspension
Spud Date: 1979-05-07
Final Drill Date: 1979-06-24
Well Total Depth: 3176.00 m
Surface Hole Latitude: 53.186176
Surface Hole Longitude: -115.637896

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-04-12 Obtained License
1979-06-24 Finished Drilling
1979-06-24 Well Mode changed to Drilled and Cased
1979-06-29 Production Casing Operation Performed
1979-07-23 Perforation Treatment Performed - Jet Perforation
1979-10-18 Perforation Treatment Performed - Fractured
1979-10-18 Perforation Treatment Performed - Jet Perforation
1981-12-09 Perforation Treatment Performed - Fractured
1982-06-17 Perforation Treatment Performed - Jet Perforation
1982-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-21 Well Log Performed
1984-08-22 Well Log Performed
1984-08-27 Perforation Treatment Performed - Jet Perforation
1984-08-27 Well Log Performed
1984-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-15 Perforation Treatment Performed - Jet Perforation
1985-05-30 Perforation Treatment Performed - Fractured
1985-11-04 Well Log Performed
1985-11-05 Well Log Performed
1985-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-20 Perforation Treatment Performed - Cement Squeeze
1986-01-01 Perforation Treatment Performed - Cement Squeeze
1986-01-05 Well Log Performed
1986-01-07 Perforation Treatment Performed - Jet Perforation
1986-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-08 Perforation Treatment Performed - Cement Squeeze
1986-01-11 Well Log Performed
1986-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-15 Perforation Treatment Performed - Jet Perforation
1986-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-21 Perforation Treatment Performed - Cement Squeeze
1986-01-29 Perforation Treatment Performed - Jet Perforation
1986-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-08 Perforation Treatment Performed - Jet Perforation
1986-03-05 Perforation Treatment Performed - Jet Perforation
1986-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-04-03 Perforation Treatment Performed - Fractured
1987-08-20 Well Log Performed
1988-01-17 Well Log Performed
2006-09-20 Well Log Performed
2006-09-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-09-21 Plug Back Performed
2006-09-22 Perforation Treatment Performed - Jet Perforation
2006-09-25 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-07-23 Perforation 3111.00 3114.00 13
1982-06-22 Acid Treatment 3095.50 3132.00 0
1984-08-27 Perforation 3031.00 3036.00 13
1984-08-28 Acid Treatment 3031.00 3036.00 0
1984-09-04 Acid Treatment 3031.00 3036.00 0
1985-02-15 Perforation 3036.00 3038.50 13
1985-02-15 Acid Treatment 3036.00 3038.50 0
1985-05-30 Fracture 3031.00 3038.50 0
1985-12-20 Acid Treatment 3031.00 3038.50 0
1985-12-20 Cement Squeeze 3031.00 3038.50 0
1986-01-01 Cement Squeeze 3088.00 3125.00 0
1979-07-23 Perforation 3117.00 3121.00 13
1986-01-07 Perforation 3104.00 3107.00 13
1986-01-08 Acid Treatment 3104.00 3107.00 0
1986-01-08 Cement Squeeze 3104.00 3107.00 0
1986-01-15 Perforation 3055.50 3057.50 13
1986-01-15 Acid Treatment 3055.50 3057.50 0
1986-01-20 Acid Treatment 3055.50 3057.50 0
1986-01-21 Acid Treatment 3055.50 3057.50 0
1986-01-21 Cement Squeeze 3055.50 3057.50 0
1986-01-29 Perforation 3033.00 3045.00 13
1986-02-06 Acid Treatment 3033.00 3045.00 0
1979-07-23 Perforation 3122.00 3125.00 13
1986-02-07 Acid Treatment 3033.00 3045.00 0
1986-02-08 Perforation 3044.80 3050.00 13
1986-02-08 Acid Treatment 3033.00 3050.00 0
1986-03-05 Perforation 3053.00 3061.00 13
1986-03-06 Acid Treatment 3033.00 3061.00 0
1986-04-03 Fracture 3033.00 3061.00 0
2006-09-21 Packing Device Capped w/Cement 2565.00 2570.00 0
2006-09-22 Perforation 2507.00 2510.00 20
2006-09-25 Fracture 2507.00 2510.00 0
1979-07-23 Perforation 3130.00 3132.00 13
1979-10-18 Perforation 3105.00 3108.00 13
1979-10-18 Fracture 3105.00 3132.00 0
1981-12-09 Fracture 3105.00 3132.00 0
1982-06-17 Perforation 3088.00 3093.00 13
1982-06-17 Perforation 3095.50 3101.50 13

For data sources see[4]



References