If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485123515000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.17325,"lon":-115.638573,"icon":""}]} |
Location: 00/15-35-048-12W5/0 | |
Location Alias: 00/15-35-48-12 W5M | |
Location Alias 2: 00/15-35-048-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 12 | |
Section: 35 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK HZ PEMBINA 15-35-48-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0485891 | |
License Date: 2017-10-17 | |
License Status: Issued | |
Spud Date: 2017-12-12 | |
Final Drill Date: 2017-12-20 | |
Well Total Depth: 3955.00 m | |
Surface Hole Latitude: 53.173250 | |
Surface Hole Longitude: -115.638573 |
Date | Event |
---|---|
2017-10-17 | Obtained License |
2017-12-12 | Surface Casing Operation Performed |
2017-12-13 | Intermediate Casing Operation Performed |
2017-12-15 | Direction Drilling Operation Performed - Deviate |
2017-12-16 | Direction Drilling Operation Performed - Horizontal |
2017-12-20 | Finished Drilling |
2017-12-20 | Well Log Performed |
2017-12-20 | Well Mode changed to Drilled and Cased |
2017-12-21 | Well Log Performed |
2017-12-22 | Perforation Treatment Performed - Open-Hole Completion |
2017-12-22 | Production Casing Operation Performed |
2017-12-22 | Rig Released |
2018-01-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-01-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-01-30 | Well Began Production |
2018-01-30 | Well Fluid changed to Crude Oil |
2018-01-30 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-12-12 | Precision Drilling Corporation | 183 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-12-15 | 1436.30 | Deviate (5 - 79 degrees) |
2017-12-16 | 2296.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-12-22 | Open Hole/Barefoot Completion | 3949.00 | 3955.00 | 0 |
2018-01-16 | Multi-Stage Fracture | 3609.00 | 3609.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3570.00 | 3570.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3531.00 | 3531.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3492.00 | 3492.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3453.00 | 3453.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3414.00 | 3414.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3375.00 | 3375.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3336.00 | 3336.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3297.00 | 3297.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3258.00 | 3258.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3921.00 | 3921.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3219.00 | 3219.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3180.00 | 3180.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3141.00 | 3141.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3102.00 | 3102.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3063.00 | 3063.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3024.00 | 3024.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 2985.00 | 2985.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 2946.00 | 2946.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 2907.00 | 2907.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 2868.00 | 2868.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3882.00 | 3882.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 2829.00 | 2829.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 2790.00 | 2790.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 2751.00 | 2751.10 | 0 |
2018-01-17 | Multi-Stage Fracture | 2712.00 | 2712.10 | 0 |
2018-01-17 | Multi-Stage Fracture | 2673.00 | 2673.10 | 0 |
2018-01-17 | Multi-Stage Fracture | 2634.00 | 2634.10 | 0 |
2018-01-17 | Multi-Stage Fracture | 2595.00 | 2595.10 | 0 |
2018-01-17 | Multi-Stage Fracture | 2556.00 | 2556.10 | 0 |
2018-01-17 | Multi-Stage Fracture | 2517.00 | 2517.10 | 0 |
2018-01-17 | Multi-Stage Fracture | 2478.00 | 2478.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3843.00 | 3843.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3804.00 | 3804.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3765.00 | 3765.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3726.00 | 3726.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3687.00 | 3687.10 | 0 |
2018-01-16 | Multi-Stage Fracture | 3648.00 | 3648.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-01-16 | 2018-01-17 | 1,951 | 5,466 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 95.0203 | N/A | |||
30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 3.3171 | N/A | ||
40/70 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 1.7074 | N/A | ||
ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0086 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0086 | N/A | ||||
ELEFR-3A | Element | Friction Reducer | Non-hazardous Ingredients | Not Available | 100 | 0.0738 | N/A | |
Tergitol 15-S-20 | 68131-40-8 | 100 | 0.0738 | N/A | ||||
ELEFE-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0982 | N/A | |
Methanol | 67-56-1 | 100 | 0.0982 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0982 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-01-11 | 2018-01-16 | Surface Water - Runoff | 6690 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 7810 | 0.0 | 0.0 | 0.0 |
2019 | 8749 | 0.0 | 0.0 | 0.0 |
2020 | 2164 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-12-22 | No Incident Encountered | 0.00 | 0.00 |
2018-01-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]