If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485131102000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.120795,"lon":-115.788857,"icon":""}]} |
Location: 00/02-11-048-13W5/0 | |
Location Alias: 00/02-11-48-13 W5M | |
Location Alias 2: 00/02-11-048-13 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 13 | |
Section: 11 | |
County/Municipality: Yellowhead County | |
Well Name: TIDEWATER BRAZR 2-11-48-13 | |
Operator Name: Tidewater Midstream and Infrastructure Ltd. | |
License Number: 0068630 | |
License Date: 1978-03-01 | |
License Status: Suspension | |
Spud Date: 1978-03-16 | |
Final Drill Date: 1978-06-13 | |
Well Total Depth: 3342.40 m | |
Surface Hole Latitude: 53.120795 | |
Surface Hole Longitude: -115.788857 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-03-01 | Obtained License |
1978-03-16 | Direction Drilling Operation Performed - 98 |
1978-05-29 | Well Log Performed |
1978-06-13 | Finished Drilling |
1978-06-13 | Well Log Performed |
1978-06-19 | Liner Casing Operation Performed |
1978-06-26 | Perforation Treatment Performed - Jet Perforation |
1978-06-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-07-02 | Well Mode changed to Drilled and Cased |
1987-03-02 | Well Began Production |
1987-03-02 | Well Fluid changed to Gas |
1987-03-02 | Well Mode changed to Flowing |
1987-12-11 | Perforation Treatment Performed - Jet Perforation |
1987-12-11 | Well Log Performed |
1987-12-12 | Perforation Treatment Performed - Cement Squeeze |
1987-12-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-12-18 | Perforation Treatment Performed - Cement Squeeze |
1988-01-05 | Well Log Performed |
1988-01-07 | Perforation Treatment Performed - Jet Perforation |
1988-01-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-01-19 | Perforation Treatment Performed - Jet Perforation |
1988-01-19 | Well Log Performed |
1988-01-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-03-01 | Well Fluid changed to Gas |
1989-03-01 | Well Mode changed to Suspended |
1991-06-13 | Well Fluid changed to Gas |
1991-06-13 | Well Mode changed to Flowing |
1993-02-10 | Well Log Performed |
1993-03-20 | Well Log Performed |
1993-03-24 | Well Log Performed |
1996-06-12 | Well Fluid changed to Gas |
1996-06-12 | Well Mode changed to Suspended |
1996-11-02 | Well Log Performed |
1996-12-11 | Perforation Treatment Performed - Bridge Plug No Cement Required |
1996-12-11 | Plug Back Performed |
1996-12-11 | Well Fluid changed to Gas |
1996-12-11 | Well Mode changed to Abandoned and Whipstocked |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1978-03-16 | 2194.60 | Conversion |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1978-06-26 | Perforation | 3221.10 | 3223.60 | 7 |
1988-01-20 | Acid Treatment | 3211.10 | 3219.30 | 0 |
1996-12-11 | Bridge Plug, No Cement | 2758.00 | 2758.00 | 0 |
1978-06-27 | Acid Treatment | 3221.10 | 3223.60 | 0 |
1987-12-11 | Perforation | 3241.50 | 3242.50 | 13 |
1987-12-12 | Cement Squeeze | 3221.10 | 3223.60 | 0 |
1987-12-18 | Acid Treatment | 3241.50 | 3242.50 | 0 |
1987-12-18 | Cement Squeeze | 3241.50 | 3242.50 | 0 |
1988-01-07 | Perforation | 3211.10 | 3215.10 | 13 |
1988-01-15 | Acid Treatment | 3211.10 | 3215.10 | 0 |
1988-01-19 | Perforation | 3217.50 | 3219.30 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1978 | 18 | 0.0 | 0.0 | 0.0 |
1979 | 46 | 0.0 | 0.0 | 0.0 |
1981 | 191 | 0.0 | 0.0 | 0.0 |
1987 | 1854 | 0.0 | 0.0 | 0.0 |
1988 | 393 | 0.0 | 0.0 | 0.0 |
1991 | 3970 | 0.0 | 0.0 | 0.0 |
1992 | 7314 | 0.0 | 0.0 | 0.0 |
1993 | 5581 | 0.0 | 0.0 | 0.0 |
1994 | 2928 | 0.0 | 0.0 | 0.0 |
1995 | 6690 | 0.0 | 0.0 | 0.0 |
1996 | 1789 | 0.0 | 0.0 | 0.0 |
For data sources see[6]