X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485132508000

Well Details

Well ID: 0485132508000
Loading map...
Location: 00/08-25-048-13W5/0
Location Alias: 00/08-25-48-13 W5M
Location Alias 2: 00/08-25-048-13 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 13
Section: 25
County/Municipality: Yellowhead County
Well Name: PCP ET AL BRAZR 8-25-48-13
Operator Name: Ovintiv Canada ULC
License Number: 0073226
License Date: 1978-11-29
License Status: RecCertified
Spud Date: 1978-11-29
Final Drill Date: 1979-01-22
Well Total Depth: 3264.00 m
Surface Hole Latitude: 53.167035
Surface Hole Longitude: -115.762063

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-11-29 Obtained License
1979-01-20 Kick Occurred
1979-01-22 Finished Drilling
1979-01-25 Drill Stem Test Performed
1979-01-26 Drill Stem Test Performed
1979-01-29 Liner Casing Operation Performed
1979-01-31 Drill Stem Test Performed
1979-01-31 Perforation Treatment Performed - Jet Perforation
1979-02-04 Perforation Treatment Performed - Jet Perforation
1979-02-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-07-25 Well Mode changed to Drilled and Cased
1980-01-22 Perforation Treatment Performed - Jet Perforation
1980-01-23 Perforation Treatment Performed - Cement Squeeze
1980-02-09 Perforation Treatment Performed - Cement Squeeze
1980-02-09 Perforation Treatment Performed - Jet Perforation
1980-02-14 Perforation Treatment Performed - Jet Perforation
1980-02-16 Perforation Treatment Performed - Jet Perforation
1980-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-24 Perforation Treatment Performed - Cement Squeeze
1980-08-10 Perforation Treatment Performed - Jet Perforation
1980-08-11 Perforation Treatment Performed - Casing Patch (Over Perfs)
1980-08-26 Perforation Treatment Performed - Fractured
1989-06-09 Well Log Performed
1989-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-06-10 Plug Back Performed
1989-06-10 Well Mode changed to Abandoned
1989-06-11 Well Abandoned
2004-12-04 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-01-31 Perforation 3134.00 3138.00 6
1980-02-09 Cement Squeeze 1950.00 1951.00 0
1980-02-14 Perforation 1950.30 1950.80 7
1980-02-16 Perforation 1960.00 1962.50 7
1980-02-16 Perforation 1963.50 1964.50 7
1980-02-16 Perforation 1968.00 1969.00 7
1980-02-20 Acid Treatment 1950.30 1969.00 0
1980-02-24 Cement Squeeze 1950.30 1969.00 0
1980-08-10 Perforation 2573.50 2576.50 3
1980-08-10 Perforation 2579.50 2584.00 3
1980-08-10 Perforation 2587.00 2591.50 3
1979-02-04 Perforation 3134.00 3138.00 6
1980-08-11 Casing Patch 1958.50 1970.50 0
1980-08-26 Fracture 2573.50 2591.50 0
1989-06-10 Packing Device Capped w/Cement 2517.00 2525.00 0
1989-06-10 Packing Device Capped w/Cement 1932.00 1940.00 0
1979-02-05 Packing Device Capped w/Cement 3122.00 3130.00 0
1979-02-05 Packing Device Capped w/Cement 2300.00 2305.00 0
1980-01-22 Perforation 1978.00 1979.00 14
1980-01-22 Perforation 1950.00 1951.00 14
1980-01-23 Cement Squeeze 1950.00 1979.00 0
1980-02-09 Perforation 1974.80 1975.30 7
1980-02-09 Cement Squeeze 1974.80 1975.30 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-01-20 Kick 3184.00 3184.00

For data sources see[5]

References