X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485132510002

Well Details

Well ID: 0485132510002
Loading map...
Location: 00/10-25-048-13W5/2
Location Alias: 00/10-25-48-13 W5M
Location Alias 2: 00/10-25-048-13 W5/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 13
Section: 25
County/Municipality: Yellowhead County
Well Name: ELK ET AL BRAZEAU RIVER 10-25-48-13
Operator Name: Obsidian Energy Ltd.
License Number: 0069304
License Date: 1978-05-01
License Status: Suspension
Spud Date: 1978-05-12
Final Drill Date: 1978-07-03
Well Total Depth: 3203.70 m
Surface Hole Latitude: 53.170671
Surface Hole Longitude: -115.764851

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-05-01 Obtained License
1978-07-03 Finished Drilling
1978-07-04 Drill Stem Test Performed
1978-07-07 Drill Stem Test Performed
1978-07-08 Kick Occurred
1978-07-11 Liner Casing Operation Performed
1978-10-22 Perforation Treatment Performed - Jet Perforation
1978-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-05 Plug Back Performed
1997-02-05 Well Log Performed
1997-02-09 Perforation Treatment Performed - Jet Perforation
1997-02-09 Well Log Performed
1997-02-11 Perforation Treatment Performed - Fractured
1997-02-22 Well Mode changed to Drilled and Cased
2002-06-04 Well Log Performed
2002-06-05 Perforation Treatment Performed - Jet Perforation
2002-06-05 Well Log Performed
2002-06-06 Perforation Treatment Performed - Fractured
2002-08-17 Well Began Production
2002-08-17 Well Fluid changed to Gas
2002-08-17 Well Mode changed to Flowing
2015-03-01 Well Fluid changed to Gas
2015-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-10-22 Perforation 3132.40 3134.90 7
1997-02-11 Fracture 2523.70 2527.90 0
2002-06-05 Perforation 1574.60 1580.40 17
2002-06-06 Fracture 1574.60 1580.40 0
1978-10-23 Acid Treatment 3132.40 3134.90 0
1997-02-05 Packing Device Capped w/Cement 3088.00 3096.00 0
1997-02-05 Packing Device Capped w/Cement 2962.00 2970.00 0
1997-02-09 Perforation 2535.90 2542.00 17
1997-02-09 Perforation 2527.90 2532.90 17
1997-02-09 Perforation 2523.70 2527.90 17
1997-02-11 Fracture 2535.90 2542.00 0
1997-02-11 Fracture 2527.90 2532.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 2957 0.0 0.0 0.0
2003 3955 0.0 0.0 0.0
2004 2761 0.0 0.0 0.0
2005 5208 0.0 0.0 0.0
2006 6563 0.0 0.0 0.0
2007 6048 0.0 0.0 0.0
2008 7925 0.0 0.0 0.0
2009 8106 0.0 0.0 0.0
2010 6806 0.0 0.0 0.0
2011 3793 0.0 0.0 0.0
2012 99 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-07-08 Kick 3063.00 3063.00

For data sources see[6]

References