X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485132605000

Well Details

Well ID: 0485132605000
Loading map...
Location: 00/05-26-048-13W5/0
Location Alias: 00/05-26-48-13 W5M
Location Alias 2: 00/05-26-048-13 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 13
Section: 26
County/Municipality: Yellowhead County
Well Name: TIDEWATER BRAZR 5-26-48-13
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0072175
License Date: 1978-09-28
License Status: Issued
Spud Date: 1978-10-09
Final Drill Date: 1978-12-05
Well Total Depth: 3311.00 m
Surface Hole Latitude: 53.167743
Surface Hole Longitude: -115.801382

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-09-28 Obtained License
1978-12-05 Finished Drilling
1978-12-05 Well Mode changed to Drilled and Cased
1978-12-07 Liner Casing Operation Performed
1978-12-16 Well Log Performed
1978-12-18 Perforation Treatment Performed - Jet Perforation
1978-12-20 Well Began Production
1978-12-20 Well Fluid changed to Crude Oil
1978-12-20 Well Mode changed to Flowing
1979-09-01 Well Fluid changed to Crude Oil
1979-09-01 Well Mode changed to Suspended
1980-10-01 Well Fluid changed to Crude Oil
1980-10-01 Well Mode changed to Flowing
1996-04-12 Well Log Performed
1996-05-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-05-05 Perforation Treatment Performed - Cement Squeeze
1996-05-09 Perforation Treatment Performed - Jet Perforation
1996-05-13 Perforation Treatment Performed - Cement Squeeze
1996-05-15 Perforation Treatment Performed - Jet Perforation
2000-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-05-25 Well Log Performed
2000-05-26 Perforation Treatment Performed - Jet Perforation
2000-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-03-28 Perforation Treatment Performed - Jet Perforation
2002-03-28 Well Log Performed
2002-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-08-01 Well Fluid changed to Crude Oil
2019-08-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-12-18 Perforation 3206.00 3210.00 13
2002-03-28 Perforation 3186.30 3191.20 20
2002-03-28 Perforation 3194.00 3196.00 20
2002-06-10 Acid Treatment 3186.30 3208.00 0
1996-05-03 Acid Treatment 3206.00 3210.00 0
1996-05-05 Cement Squeeze 3206.00 3210.00 0
1996-05-09 Perforation 3213.50 3216.50 13
1996-05-13 Cement Squeeze 3213.50 3216.50 0
1996-05-15 Perforation 3213.50 3216.50 18
2000-05-25 Packing Device Capped w/Cement 3209.00 3210.50 0
2000-05-26 Perforation 3203.00 3208.00 13
2000-05-27 Acid Treatment 3203.00 3208.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 128 0.0 0.0 0.0
1979 1650 0.0 0.0 0.0
1980 759 0.0 0.0 0.0
1981 6300 0.0 0.0 0.0
1982 5474 0.0 0.0 0.0
1983 5116 0.0 0.0 0.0
1984 6832 0.0 0.0 0.0
1985 5122 0.0 0.0 0.0
1986 6124 0.0 0.0 0.0
1987 7460 0.0 0.0 0.0
1988 7631 0.0 0.0 0.0
1989 7862 0.0 0.0 0.0
1990 7933 0.0 0.0 0.0
1991 7858 0.0 0.0 0.0
1992 8102 0.0 0.0 0.0
1993 7972 0.0 0.0 0.0
1994 8440 0.0 0.0 0.0
1995 7843 0.0 0.0 0.0
1996 8284 0.0 0.0 0.0
1997 8580 0.0 0.0 0.0
1998 8748 0.0 0.0 0.0
1999 8649 0.0 0.0 0.0
2000 8394 0.0 0.0 0.0
2001 8277 0.0 0.0 0.0
2002 8482 0.0 0.0 0.0
2003 8667 0.0 0.0 0.0
2004 8719 0.0 0.0 0.0
2005 8725 0.0 0.0 0.0
2006 8598 0.0 0.0 0.0
2007 8748 0.0 0.0 0.0
2008 7957 0.0 0.0 0.0
2009 8237 0.0 0.0 0.0
2010 8366 0.0 0.0 0.0
2011 8247 0.0 0.0 0.0
2012 7886 0.0 0.0 0.0
2013 7999 0.0 0.0 0.0
2014 6557 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 6215 0.0 0.0 0.0
2017 7344 0.0 0.0 0.0
2018 1560 0.0 0.0 0.0

For data sources see[5]

References