X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485142113000

Well Details

Well ID: 0485142113000
Loading map...
Location: 00/13-21-048-14W5/0
Location Alias: 00/13-21-48-14 W5M
Location Alias 2: 00/13-21-048-14 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 14
Section: 21
County/Municipality: Yellowhead County
Well Name: ESSO BRAZEAU RIVER 13-21-48-14
Operator Name: Obsidian Energy Ltd.
License Number: 0131600
License Date: 1988-01-21
License Status: Suspension
Spud Date: 1988-01-29
Final Drill Date: 1988-02-08
Well Total Depth: 1869.00 m
Surface Hole Latitude: 53.160559
Surface Hole Longitude: -115.996991

For data sources see[1][2]

Well History

Date Event
1988-01-21 Obtained License
1988-01-31 Surface Casing Operation Performed
1988-02-08 Finished Drilling
1988-02-10 Well Log Performed
1988-02-12 Production Casing Operation Performed
1988-02-12 Rig Released
1988-03-07 Perforation Treatment Performed - Jet Perforation
1988-03-09 Perforation Treatment Performed - Fractured
1988-03-10 Well Mode changed to Drilled and Cased
1997-12-17 Well Began Production
1997-12-17 Well Fluid changed to Crude Oil
1997-12-17 Well Mode changed to Flowing
1998-10-02 Well Fluid changed to Crude Oil
1998-10-02 Well Mode changed to Suspended
2000-01-01 Well Fluid changed to Crude Oil
2000-01-01 Well Mode changed to Pumping
2006-06-24 Perforation Treatment Performed - Jet Perforation
2006-06-25 Perforation Treatment Performed - Remedial Casing
2006-06-28 Perforation Treatment Performed - Jet Perforation
2006-07-09 Perforation Treatment Performed - Remedial Casing
2017-11-01 Well Fluid changed to Crude Oil
2017-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-03-07 Perforation 1797.00 1808.00 13
1988-03-09 Fracture 1797.00 1808.00 0
2006-06-24 Perforation 1209.00 1210.50 17
2006-06-25 Remedial Casing Cementing 1209.00 1210.50 0
2006-06-28 Perforation 764.00 765.00 17
2006-07-09 Remedial Casing Cementing 764.00 765.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 125 0.0 0.0 0.0
2000 6073 0.0 0.0 0.0
2001 8180 0.0 0.0 0.0
2002 8511 0.0 0.0 0.0
2003 8505 0.0 0.0 0.0
2004 8311 0.0 0.0 0.0
2005 7760 0.0 0.0 0.0
2006 7631 0.0 0.0 0.0
2007 5961 0.0 0.0 0.0
2008 7478 0.0 0.0 0.0
2009 7115 0.0 0.0 0.0
2010 7807 0.0 0.0 0.0
2011 7813 0.0 0.0 0.0
2012 6332 0.0 0.0 0.0
2013 5536 0.0 0.0 0.0

For data sources see[5]

References