X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485150602000

Well Details

Well ID: 0485150602000
Loading map...
Location: 00/02-06-048-15W5/0
Location Alias: 00/02-06-48-15 W5M
Location Alias 2: 00/02-06-048-15 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 15
Section: 06
County/Municipality: Yellowhead County
Well Name: CVE PECO 2-6-48-15
Operator Name: Cenovus Energy Inc.
License Number: 0183692
License Date: 1995-12-18
License Status: Amended
Spud Date: 1995-12-28
Final Drill Date: 1996-01-22
Well Total Depth: 3265.00 m
Surface Hole Latitude: 53.108543
Surface Hole Longitude: -116.177481

For data sources see[1][2]

Well History

Date Event
1995-12-18 Obtained License
1995-12-31 Surface Casing Operation Performed
1996-01-17 Well Log Performed
1996-01-22 Finished Drilling
1996-01-23 Well Log Performed
1996-01-24 Kick Occurred
1996-01-24 Well Log Performed
1996-01-26 Production Casing Operation Performed
1996-01-27 Rig Released
1996-01-27 Well Mode changed to Drilled and Cased
1996-02-14 Well Log Performed
1996-02-15 Perforation Treatment Performed - Jet Perforation
1996-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-21 Well Log Performed
1996-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-02-22 Plug Back Performed
1996-02-22 Well Log Performed
1996-02-23 Perforation Treatment Performed - Jet Perforation
1996-02-24 Well Log Performed
1996-02-25 Perforation Treatment Performed - Fractured
1996-02-25 Perforation Treatment Performed - Jet Perforation
1996-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-02-26 Plug Back Performed
1996-02-26 Well Log Performed
1996-02-28 Perforation Treatment Performed - Fractured
1996-02-28 Perforation Treatment Performed - Jet Perforation
1996-03-04 Perforation Treatment Performed - Fractured
2001-04-24 Well Began Production
2001-04-24 Well Fluid changed to Gas
2001-04-24 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-02-15 Perforation 3228.00 3232.50 20
1996-02-26 Packing Device Capped w/Cement 3084.70 3093.00 0
1996-02-28 Perforation 3047.50 3052.50 20
1996-02-28 Fracture 3047.50 3052.50 0
1996-03-04 Fracture 3047.50 3052.50 0
1996-02-15 Perforation 3240.00 3245.00 20
1996-02-19 Acid Treatment 3228.00 3245.00 0
1996-02-22 Packing Device Capped w/Cement 3205.00 3212.00 0
1996-02-23 Perforation 3105.00 3108.00 20
1996-02-25 Perforation 3150.00 3154.00 20
1996-02-25 Perforation 3159.00 3163.00 20
1996-02-25 Fracture 3150.00 3163.00 0
1996-02-26 Packing Device Capped w/Cement 3137.00 3145.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 4736 0.0 0.0 0.0
2002 2472 0.0 0.0 0.0
2003 8377 0.0 0.0 0.0
2004 8266 0.0 0.0 0.0
2005 8567 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8349 0.0 0.0 0.0
2008 7960 0.0 0.0 0.0
2009 8448 0.0 0.0 0.0
2010 8712 0.0 0.0 0.0
2011 8348 0.0 0.0 0.0
2012 8304 0.0 0.0 0.0
2013 8711 0.0 0.0 0.0
2014 8256 0.0 0.0 0.0
2015 5880 0.0 0.0 0.0
2017 6774 0.0 0.0 0.0
2018 8735 0.0 0.0 0.0
2019 8756 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-01-24 Kick 3265.00 3265.00

For data sources see[6]

References