X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485161012000

Well Details

Well ID: 0485161012000
Loading map...
Location: 00/12-10-048-16W5/0
Location Alias: 00/12-10-48-16 W5M
Location Alias 2: 00/12-10-048-16 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 16
Section: 10
County/Municipality: Yellowhead County
Well Name: CVE PECO 12-10-48-16
Operator Name: Cenovus Energy Inc.
License Number: 0097686
License Date: 1982-10-01
License Status: Abandoned
Spud Date: 1982-10-26
Final Drill Date: 1982-12-20
Well Total Depth: 3202.00 m
Surface Hole Latitude: 53.129301
Surface Hole Longitude: -116.263125

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-10-01 Obtained License
1982-11-13 Drill Stem Test Performed
1982-12-16 Drill Stem Test Performed
1982-12-20 Finished Drilling
1982-12-26 Drill Stem Test Performed
1982-12-29 Production Casing Operation Performed
1983-01-02 Well Mode changed to Drilled and Cased
1983-02-04 Perforation Treatment Performed - Jet Perforation
1983-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-02-05 Perforation Treatment Performed - Cement Squeeze
1983-02-08 Perforation Treatment Performed - Jet Perforation
1983-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-03-12 Perforation Treatment Performed - Jet Perforation
1983-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-13 Perforation Treatment Performed - Cement Squeeze
1983-03-17 Perforation Treatment Performed - Jet Perforation
1983-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-27 Perforation Treatment Performed - Fractured
1983-05-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-05-22 Perforation Treatment Performed - Jet Perforation
1983-05-26 Perforation Treatment Performed - Fractured
1983-05-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-05-30 Perforation Treatment Performed - Jet Perforation
1983-05-31 Perforation Treatment Performed - Cement Squeeze
1983-05-31 Perforation Treatment Performed - Fractured
1983-06-07 Perforation Treatment Performed - Cement Squeeze
1983-06-09 Perforation Treatment Performed - Jet Perforation
1983-06-10 Perforation Treatment Performed - Cement Squeeze
1983-06-13 Perforation Treatment Performed - Jet Perforation
1983-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-17 Perforation Treatment Performed - Fractured
1999-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-06-23 Plug Back Performed
1999-06-23 Well Log Performed
1999-06-24 Perforation Treatment Performed - Jet Perforation
1999-06-24 Perforation Treatment Performed - Remedial Casing
1999-07-26 Well Abandoned
1999-07-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-02-04 Perforation 3176.40 3177.00 13
1983-03-13 Acid Treatment 3061.00 3080.50 0
1983-03-13 Cement Squeeze 3080.00 3080.50 0
1983-03-17 Perforation 3068.00 3072.50 13
1983-03-18 Acid Treatment 3061.00 3072.50 0
1983-03-24 Acid Treatment 3061.00 3072.50 0
1983-03-27 Fracture 3061.00 3072.50 0
1983-05-21 Packing Device Capped w/Cement 3049.00 3049.00 0
1983-05-22 Perforation 2865.50 2870.00 13
1983-05-26 Fracture 2865.50 2870.00 0
1983-05-30 Packing Device Capped w/Cement 2850.00 2850.00 0
1983-02-05 Acid Treatment 3176.40 3177.00 0
1983-05-30 Packing Device Capped w/Cement 2590.00 2590.00 0
1983-05-30 Perforation 2065.00 2066.00 14
1983-05-30 Perforation 1925.00 1926.00 14
1983-05-31 Fracture 2065.00 2066.00 0
1983-05-31 Cement Squeeze 2065.00 2066.00 0
1983-06-07 Cement Squeeze 1925.00 1926.00 0
1983-06-09 Perforation 1995.00 1996.00 13
1983-06-10 Cement Squeeze 1995.00 1996.00 0
1983-06-13 Perforation 1978.50 1982.50 14
1983-06-15 Acid Treatment 1978.50 1982.50 0
1983-02-05 Cement Squeeze 3176.40 3177.00 0
1983-06-17 Fracture 1978.50 1982.50 0
1999-06-23 Packing Device Capped w/Cement 1960.00 1968.00 0
1999-06-23 Packing Device Capped w/Cement 1905.00 1913.00 0
1999-06-24 Perforation 606.00 606.30 20
1999-06-24 Remedial Casing Cementing 606.00 606.30 0
1983-02-08 Perforation 3167.00 3173.00 13
1983-02-09 Acid Treatment 3167.00 3173.00 0
1983-02-13 Acid Treatment 3167.00 3173.00 0
1983-03-12 Packing Device Capped w/Cement 3144.00 3149.00 0
1983-03-12 Perforation 3061.00 3061.50 13
1983-03-12 Perforation 3080.00 3080.50 13

For data sources see[4]



References