X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485161510000

Well Details

Well ID: 0485161510000
Loading map...
Location: 00/10-15-048-16W5/0
Location Alias: 00/10-15-48-16 W5M
Location Alias 2: 00/10-15-048-16 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 16
Section: 15
County/Municipality: Yellowhead County
Well Name: CVE PECO 10-15-48-16
Operator Name: Cenovus Energy Inc.
License Number: 0056003
License Date: 1975-11-28
License Status: RecCertified
Spud Date: 1975-12-12
Final Drill Date: 1976-02-01
Well Total Depth: 3159.30 m
Surface Hole Latitude: 53.144315
Surface Hole Longitude: -116.251604

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-11-28 Obtained License
1976-01-15 Lost Circulation Occurred
1976-02-01 Finished Drilling
1976-02-03 Drill Stem Test Performed
1976-02-04 Drill Stem Test Performed
1976-02-06 Perforation Treatment Performed - Open-Hole Completion
1976-02-06 Production Casing Operation Performed
1976-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-03-10 Well Log Performed
1976-03-14 Perforation Treatment Performed - Jet Perforation
1976-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-21 Perforation Treatment Performed - Jet Perforation
1976-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-24 Perforation Treatment Performed - Cement Squeeze
1976-03-31 Perforation Treatment Performed - Jet Perforation
1976-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-04-02 Perforation Treatment Performed - Acid Wash - No Pressure
1976-08-11 Well Mode changed to Drilled and Cased
1999-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-10-17 Perforation Treatment Performed - Jet Perforation
1999-10-17 Plug Back Performed
1999-10-17 Well Log Performed
1999-10-18 Perforation Treatment Performed - Cement Plug
1999-10-18 Perforation Treatment Performed - Remedial Casing
1999-11-04 Well Fluid changed to Crude Oil
1999-11-04 Well Mode changed to Potential
1999-11-05 Well Abandoned
1999-11-05 Well Fluid changed to Crude Oil
1999-11-05 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-02-06 Open Hole/Barefoot Completion 3128.20 3159.30 0
1976-03-24 Cement Squeeze 2418.90 2445.70 0
1976-03-31 Perforation 2427.40 2432.30 13
1976-04-02 Acid Wash 2427.40 2432.30 0
1976-04-02 Acid Treatment 2427.40 2432.30 0
1999-10-17 Packing Device Capped w/Cement 2403.00 2411.00 0
1999-10-17 Perforation 615.00 616.00 13
1999-10-18 Remedial Casing Cementing 615.00 616.00 0
1999-10-18 Cement Plug 298.60 616.00 0
1976-03-07 Acid Treatment 3128.20 3159.30 0
1976-03-10 Packing Device Capped w/Cement 3110.50 3110.50 0
1976-03-14 Perforation 3031.20 3036.40 13
1976-03-15 Acid Treatment 3031.20 3036.40 0
1976-03-21 Perforation 2418.90 2421.60 13
1976-03-21 Perforation 2427.40 2432.30 13
1976-03-21 Perforation 2442.70 2445.70 13
1976-03-22 Acid Treatment 2418.90 2445.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 1225 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1976-01-15 Lost Circulation 2987.00 3011.40

For data sources see[6]

References