X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485161715000

Well Details

Well ID: 0485161715000
Loading map...
Location: 00/15-17-048-16W5/0
Location Alias: 00/15-17-48-16 W5M
Location Alias 2: 00/15-17-048-16 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 16
Section: 17
County/Municipality: Yellowhead County
Well Name: CVE PECO 15-17-48-16
Operator Name: Cenovus Energy Inc.
License Number: 0065270
License Date: 1977-08-12
License Status: Issued
Spud Date: 1977-10-21
Final Drill Date: 1978-01-23
Well Total Depth: 3202.50 m
Surface Hole Latitude: 53.146229
Surface Hole Longitude: -116.299354

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-08-12 Obtained License
1977-12-02 Kick Occurred
1977-12-03 Lost Circulation Occurred
1978-01-23 Finished Drilling
1978-01-23 Well Mode changed to Drilled and Cased
1978-01-27 Production Casing Operation Performed
1978-03-19 Perforation Treatment Performed - Jet Perforation
1978-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-11-11 Perforation Treatment Performed - Jet Perforation
1978-11-14 Perforation Treatment Performed - Nitrogen Treatment
1978-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-11-16 Perforation Treatment Performed - Fractured
1979-09-18 Well Began Production
1979-09-18 Well Fluid changed to Gas
1979-09-18 Well Mode changed to Flowing
1984-10-17 Well Log Performed
1993-03-27 Well Log Performed
1993-04-09 Well Log Performed
1993-04-12 Well Log Performed
2003-01-01 Well Fluid changed to Gas
2003-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-03-19 Perforation 3068.40 3072.40 13
1978-03-20 Acid Treatment 3068.40 3072.40 0
1978-11-11 Perforation 3068.40 3072.40 13
1978-11-14 Nitrogen Treatment 3068.40 3072.40 0
1978-11-15 Acid Treatment 3068.40 3072.40 0
1978-11-16 Fracture 3068.40 3072.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 845 0.0 0.0 0.0
1980 1631 0.0 0.0 0.0
1981 1929 0.0 0.0 0.0
1982 5041 0.0 0.0 0.0
1983 4093 0.0 0.0 0.0
1984 8517 0.0 0.0 0.0
1985 8048 0.0 0.0 0.0
1986 6225 0.0 0.0 0.0
1987 5907 0.0 0.0 0.0
1988 7525 0.0 0.0 0.0
1989 8177 0.0 0.0 0.0
1990 8115 0.0 0.0 0.0
1991 8316 0.0 0.0 0.0
1992 8554 0.0 0.0 0.0
1993 5093 0.0 0.0 0.0
1994 8490 0.0 0.0 0.0
1995 7756 0.0 0.0 0.0
1996 8544 0.0 0.0 0.0
1997 8229 0.0 0.0 0.0
1998 8064 0.0 0.0 0.0
1999 7859 0.0 0.0 0.0
2000 8384 0.0 0.0 0.0
2001 8288 0.0 0.0 0.0
2002 8493 0.0 0.0 0.0
2003 8502 0.0 0.0 0.0
2004 8461 0.0 0.0 0.0
2005 7966 0.0 0.0 0.0
2006 8462 0.0 0.0 0.0
2007 8679 0.0 0.0 0.0
2008 8568 0.0 0.0 0.0
2009 8583 0.0 0.0 0.0
2010 8381 0.0 0.0 0.0
2011 8735 0.0 0.0 0.0
2012 8759 0.0 0.0 0.0
2013 8543 0.0 0.0 0.0
2014 6763 0.0 0.0 0.0
2015 8689 0.0 0.0 0.0
2016 8733 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8533 0.0 0.0 0.0
2019 8631 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-12-02 Kick 2468.90 2468.90
1977-12-03 Lost Circulation 2469.00 2469.00

For data sources see[6]

References