X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485162906000

Well Details

Well ID: 0485162906000
Loading map...
Location: 00/06-29-048-16W5/0
Location Alias: 00/06-29-48-16 W5M
Location Alias 2: 00/06-29-048-16 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 16
Section: 29
County/Municipality: Yellowhead County
Well Name: CVE PECO 6-29-48-16
Operator Name: Cenovus Energy Inc.
License Number: 0046615
License Date: 1973-07-19
License Status: Abandoned
Spud Date: 1973-07-28
Final Drill Date: 1973-09-19
Well Total Depth: 3278.10 m
Surface Hole Latitude: 53.167731
Surface Hole Longitude: -116.310044

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-07-19 Obtained License
1973-08-02 Drill Stem Test Performed
1973-08-30 Drill Stem Test Performed
1973-09-19 Finished Drilling
1973-09-21 Production Casing Operation Performed
1974-02-22 Perforation Treatment Performed - Jet Perforation
1974-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-02-26 Perforation Treatment Performed - Cement Plug
1974-02-27 Perforation Treatment Performed - Jet Perforation
1974-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-03-08 Perforation Treatment Performed - Jet Perforation
1974-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-03-12 Perforation Treatment Performed - Cement Plug
1974-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-03-02 Perforation Treatment Performed - Jet Perforation
1975-03-02 Well Mode changed to Drilled and Cased
1975-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-03 Perforation Treatment Performed - Jet Perforation
1975-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-07-23 Perforation Treatment Performed - Fractured
1976-12-04 Perforation Treatment Performed - Casing Patch (Over Perfs)
1976-12-05 Perforation Treatment Performed - Casing Patch (Over Perfs)
1976-12-07 Perforation Treatment Performed - Jet Perforation
1976-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-21 Perforation Treatment Performed - Fractured
2008-06-27 Well Log Performed
2008-07-23 Perforation Treatment Performed - Jet Perforation
2008-07-24 Perforation Treatment Performed - Jet Perforation
2008-07-25 Perforation Treatment Performed - Cement Plug
2008-07-25 Plug Back Performed
2008-07-25 Well Mode changed to Abandoned Zone
2008-07-26 Perforation Treatment Performed - Jet Perforation
2008-07-27 Perforation Treatment Performed - Jet Perforation
2008-07-27 Perforation Treatment Performed - Remedial Casing
2008-07-27 Well Log Performed
2008-07-28 Perforation Treatment Performed - Remedial Casing
2008-07-29 Perforation Treatment Performed - Jet Perforation
2008-07-29 Well Log Performed
2008-07-30 Perforation Treatment Performed - Remedial Casing
2008-08-17 Well Abandoned
2008-08-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-02-22 Perforation 3246.70 3248.60 13
1974-03-09 Acid Treatment 3216.20 3221.10 0
1974-03-12 Cement Plug 3209.50 3209.50 0
1974-03-13 Acid Treatment 3158.30 3176.60 0
1975-03-02 Perforation 2847.40 2851.10 7
1975-03-02 Perforation 2853.50 2857.20 7
1975-03-03 Acid Treatment 2847.40 2857.20 0
1975-12-03 Perforation 3046.80 3051.60 7
1975-12-05 Acid Treatment 3046.80 3051.60 0
1975-12-17 Acid Treatment 3046.80 3051.60 0
1976-07-23 Fracture 3046.80 3051.60 0
1974-02-24 Acid Treatment 3246.70 3248.60 0
1976-12-04 Casing Patch 3046.80 3051.60 0
1976-12-05 Casing Patch 2847.40 2857.20 0
1976-12-07 Perforation 3146.40 3147.90 13
1976-12-07 Perforation 3150.10 3156.80 13
1976-12-14 Acid Treatment 3146.40 3156.80 0
1976-12-21 Fracture 3146.40 3156.80 0
2008-07-23 Perforation 2847.40 2851.10 7
2008-07-24 Perforation 2853.50 2857.20 7
2008-07-25 Cement Plug 2727.00 3105.00 0
2008-07-26 Perforation 1400.00 1401.00 17
1974-02-26 Cement Plug 3240.00 3240.00 0
2008-07-27 Remedial Casing Cementing 1400.00 1401.00 0
2008-07-27 Perforation 620.00 621.00 17
2008-07-28 Remedial Casing Cementing 620.00 621.00 0
2008-07-29 Perforation 350.00 351.00 17
2008-07-30 Remedial Casing Cementing 350.00 351.00 0
1974-02-27 Perforation 3170.50 3176.60 7
1974-02-27 Perforation 3164.40 3167.50 7
1974-02-27 Perforation 3167.50 3170.50 7
1974-02-27 Perforation 3158.30 3164.40 7
1974-02-28 Acid Treatment 3158.30 3176.60 0
1974-03-08 Perforation 3216.20 3221.10 7

For data sources see[4]



References