If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494021406002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.224697,"lon":-110.192536,"icon":""}]} |
Location: 00/06-14-049-02W4/2 | |
Location Alias: 00/06-14-49-02 W4M | |
Location Alias 2: 00/06-14-049-02 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 02 | |
Section: 14 | |
County/Municipality: County of Vermilion River | |
Well Name: ESSO LLOYD 6-14-49-2 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0071987 | |
License Date: 1978-09-19 | |
License Status: RecCertified | |
Spud Date: 1978-10-22 | |
Final Drill Date: 1978-10-26 | |
Well Total Depth: 754.00 m | |
Surface Hole Latitude: 53.224697 | |
Surface Hole Longitude: -110.192536 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-09-19 | Obtained License |
1978-10-25 | Drill Stem Test Performed |
1978-10-26 | Finished Drilling |
1978-10-26 | Well Mode changed to Drilled and Cased |
1978-10-28 | Production Casing Operation Performed |
1978-11-04 | Perforation Treatment Performed - Jet Perforation |
1979-06-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-06-03 | Perforation Treatment Performed - Jet Perforation |
1979-06-09 | Well Began Production |
1979-06-09 | Well Fluid changed to Crude Oil |
1979-06-09 | Well Mode changed to Pumping |
1980-01-01 | Well Fluid changed to Crude Oil |
1980-01-01 | Well Mode changed to Suspended |
1986-09-21 | Well Fluid changed to Crude Oil |
1986-09-21 | Well Mode changed to Abandoned |
1986-09-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1986-09-24 | Plug Back Performed |
1986-09-24 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1978-11-04 | Perforation | 689.00 | 690.50 | 13 |
1979-06-03 | Packing Device Capped w/Cement | 686.00 | 686.00 | 0 |
1979-06-03 | Perforation | 626.00 | 628.00 | 13 |
1986-09-24 | Packing Device Capped w/Cement | 613.00 | 621.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 792 | 0.0 | 0.0 | 0.0 |
1981 | 720 | 0.0 | 0.0 | 0.0 |
For data sources see[5]