X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495120608002

Well Details

Well ID: 0495120608002
Loading map...
Location: 00/08-06-049-12W5/2
Location Alias: 00/08-06-49-12 W5M
Location Alias 2: 00/08-06-049-12 W5/02
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 06
County/Municipality: Yellowhead County
Well Name: PRECAM ET AL WESTPEM 8-6-49-12
Operator Name: Enerplus Corporation
License Number: 0098254
License Date: 1982-10-27
License Status: RecCertified
Spud Date: 1982-11-27
Final Drill Date: 1982-12-26
Well Total Depth: 2632.00 m
Surface Hole Latitude: 53.197300
Surface Hole Longitude: -115.737878

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-10-27 Obtained License
1982-12-26 Finished Drilling
1982-12-26 Kick Occurred
1982-12-26 Well Mode changed to Drilled and Cased
1983-01-02 Well Log Performed
1983-01-04 Drill Stem Test Performed
1983-01-06 Drill Stem Test Performed
1983-01-07 Drill Stem Test Performed
1983-01-09 Production Casing Operation Performed
1983-03-09 Perforation Treatment Performed - Jet Perforation
1983-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-03-13 Perforation Treatment Performed - Jet Perforation
1983-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-03-17 Perforation Treatment Performed - Jet Perforation
1983-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-21 Perforation Treatment Performed - Fractured
1983-04-04 Perforation Treatment Performed - Jet Perforation
1983-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-09 Well Began Production
1983-06-09 Well Fluid changed to Gas
1983-06-09 Well Mode changed to Flowing
1983-06-29 Well Fluid changed to Gas
1983-06-29 Well Mode changed to Suspended
1999-09-16 Well Log Performed
1999-09-17 Well Log Performed
1999-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-18 Plug Back Performed
1999-09-18 Well Log Performed
1999-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-19 Perforation Treatment Performed - Jet Perforation
1999-09-19 Plug Back Performed
1999-09-20 Well Abandoned
1999-09-20 Well Fluid changed to Gas
1999-09-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-03-09 Perforation 2465.50 2469.00 10
1983-04-04 Perforation 2138.40 2144.90 10
1983-04-05 Acid Treatment 2138.40 2144.90 0
1999-09-18 Packing Device Capped w/Cement 2223.50 2231.50 0
1999-09-18 Packing Device Capped w/Cement 2115.00 2123.00 0
1999-09-19 Perforation 600.00 601.00 14
1999-09-19 Packing Device Capped w/Cement 585.00 605.00 0
1983-03-11 Acid Treatment 2465.50 2469.00 0
1983-03-12 Packing Device Capped w/Cement 2452.00 2460.00 0
1983-03-13 Perforation 2430.60 2432.60 10
1983-03-15 Acid Treatment 2430.60 2432.60 0
1983-03-17 Packing Device Capped w/Cement 2417.00 2425.00 0
1983-03-17 Perforation 2254.20 2258.20 10
1983-03-19 Acid Treatment 2254.20 2258.20 0
1983-03-21 Fracture 2254.20 2258.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 502 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1982-12-26 Kick 2630.00 2630.00

For data sources see[6]

References