If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495121013020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.20549,"lon":-115.678488,"icon":""}]} |
Location: 02/13-10-049-12W5/0 | |
Location Alias: 02/13-10-49-12 W5M | |
Location Alias 2: 02/13-10-049-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 12 | |
Section: 10 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK PEMBINA 13-10-49-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0444307 | |
License Date: 2012-02-21 | |
License Status: Issued | |
Spud Date: 2012-06-22 | |
Final Drill Date: 2012-07-03 | |
Well Total Depth: 3501.00 m | |
Surface Hole Latitude: 53.205490 | |
Surface Hole Longitude: -115.678488 |
Date | Event |
---|---|
2012-02-21 | Obtained License |
2012-06-22 | Surface Casing Operation Performed |
2012-06-24 | Well Log Performed |
2012-06-25 | Direction Drilling Operation Performed - Deviate |
2012-06-27 | Direction Drilling Operation Performed - Horizontal |
2012-07-03 | Finished Drilling |
2012-07-03 | Well Mode changed to Drilled and Cased |
2012-07-05 | Production Casing Operation Performed |
2012-07-06 | Perforation Treatment Performed - Open-Hole Completion |
2012-07-06 | Rig Released |
2012-07-16 | Well Log Performed |
2012-07-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-29 | Well Began Production |
2012-07-29 | Well Fluid changed to Crude Oil |
2012-07-29 | Well Mode changed to Flowing |
2012-07-31 | Well Log Performed |
2017-04-01 | Well Fluid changed to Crude Oil |
2017-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-06-22 | Ironhand Drilling Inc. | 3 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-06-25 | 1611.00 | Deviate (5 - 79 degrees) |
2012-06-27 | 2033.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-07-06 | Open Hole/Barefoot Completion | 3495.00 | 3501.00 | 0 |
2012-07-27 | Multi-Stage Fracture | 2898.70 | 2898.80 | 0 |
2012-07-27 | Multi-Stage Fracture | 2837.90 | 2838.00 | 0 |
2012-07-27 | Multi-Stage Fracture | 2765.30 | 2765.40 | 0 |
2012-07-27 | Multi-Stage Fracture | 2690.90 | 2691.00 | 0 |
2012-07-27 | Multi-Stage Fracture | 2630.50 | 2630.60 | 0 |
2012-07-27 | Multi-Stage Fracture | 2556.20 | 2556.30 | 0 |
2012-07-27 | Multi-Stage Fracture | 2484.40 | 2484.50 | 0 |
2012-07-27 | Multi-Stage Fracture | 2410.70 | 2410.80 | 0 |
2012-07-27 | Multi-Stage Fracture | 2335.70 | 2335.80 | 0 |
2012-07-27 | Multi-Stage Fracture | 2274.50 | 2274.60 | 0 |
2012-07-27 | Multi-Stage Fracture | 3469.70 | 3469.80 | 0 |
2012-07-27 | Multi-Stage Fracture | 2200.20 | 2200.30 | 0 |
2012-07-27 | Multi-Stage Fracture | 2126.90 | 2127.00 | 0 |
2012-07-27 | Multi-Stage Fracture | 3402.10 | 3402.20 | 0 |
2012-07-27 | Multi-Stage Fracture | 3327.10 | 3327.20 | 0 |
2012-07-27 | Multi-Stage Fracture | 3252.70 | 3252.80 | 0 |
2012-07-27 | Multi-Stage Fracture | 3181.10 | 3181.20 | 0 |
2012-07-27 | Multi-Stage Fracture | 3120.40 | 3120.50 | 0 |
2012-07-27 | Multi-Stage Fracture | 3047.10 | 3047.20 | 0 |
2012-07-27 | Multi-Stage Fracture | 2973.40 | 2973.50 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 3095 | 0.0 | 0.0 | 0.0 |
2013 | 8694 | 0.0 | 0.0 | 0.0 |
2014 | 8473 | 0.0 | 0.0 | 0.0 |
2015 | 8742 | 0.0 | 0.0 | 0.0 |
2016 | 8780 | 0.0 | 0.0 | 0.0 |
2017 | 8722 | 0.0 | 0.0 | 0.0 |
2018 | 8749 | 0.0 | 0.0 | 0.0 |
2019 | 8582 | 0.0 | 0.0 | 0.0 |
2020 | 1320 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-07-06 | No Incident Encountered | 0.00 | 0.00 |
2012-08-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]