X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495121201020

Well Details

Well ID: 0495121201020
Loading map...
Location: 02/01-12-049-12W5/0
Location Alias: 02/01-12-49-12 W5M
Location Alias 2: 02/01-12-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 12
County/Municipality: Yellowhead County
Well Name: VEI HZ PEMBINA 1-12-49-12
Operator Name: Vermilion Energy Inc.
License Number: 0492090
License Date: 2018-11-16
License Status: Issued
Spud Date: 2019-01-04
Final Drill Date: 2019-01-11
Well Total Depth: 4103.00 m
Surface Hole Latitude: 53.203519
Surface Hole Longitude: -115.636642

For data sources see[1][2]

Well History

Date Event
2018-11-16 Obtained License
2019-01-04 Surface Casing Operation Performed
2019-01-06 Direction Drilling Operation Performed - Deviate
2019-01-08 Direction Drilling Operation Performed - Horizontal
2019-01-11 Finished Drilling
2019-01-11 Well Mode changed to Drilled and Cased
2019-01-12 Production Casing Operation Performed
2019-01-12 Well Log Performed
2019-01-13 Rig Released
2019-01-15 Well Log Performed
2019-01-20 Perforation Treatment Performed - Open-Hole Completion
2019-01-21 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-08 Well Began Production
2019-02-08 Well Fluid changed to Gas
2019-02-08 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-01-04 Ironhand Drilling Inc. 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-06 1979.80 Deviate (5 - 79 degrees)
2019-01-08 2753.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-20 Open Hole/Barefoot Completion 4096.00 4103.00 0
2019-01-21 Multi-Stage Fracture 3515.90 3516.00 0
2019-01-21 Multi-Stage Fracture 3447.00 3447.10 0
2019-01-21 Multi-Stage Fracture 3365.60 3365.70 0
2019-01-21 Multi-Stage Fracture 3299.10 3299.20 0
2019-01-21 Multi-Stage Fracture 3237.70 3237.80 0
2019-01-21 Multi-Stage Fracture 3170.70 3170.80 0
2019-01-21 Multi-Stage Fracture 3096.20 3096.30 0
2019-01-21 Multi-Stage Fracture 3031.20 3031.30 0
2019-01-21 Multi-Stage Fracture 2961.20 2961.30 0
2019-01-21 Multi-Stage Fracture 2891.40 2891.50 0
2019-01-21 Multi-Stage Fracture 4071.40 4071.50 0
2019-01-21 Multi-Stage Fracture 2877.9 2878 0
2019-01-21 Multi-Stage Fracture 3991.50 3991.60 0
2019-01-21 Multi-Stage Fracture 3926.60 3926.70 0
2019-01-21 Multi-Stage Fracture 3856.50 3856.60 0
2019-01-21 Multi-Stage Fracture 3786.50 3786.60 0
2019-01-21 Multi-Stage Fracture 3717.90 3718.00 0
2019-01-21 Multi-Stage Fracture 3650.10 3650.20 0
2019-01-21 Multi-Stage Fracture 3583.10 3583.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-21 2019-01-21 2,383 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* 7732-18-5 100 73.8888 N/A
YF125Flex. N002 Schlumberger Quartz. Crystalline silica 14808-60-7 100 21.7389 N/A
YF125Flex. N002 Schlumberger Energizing Fluid 2-hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.063 N/A
Acetic acid 64-19-7 100 0.0007 N/A
Amines. dicoco alkylmethyl 61788-62-3 100 0 N/A
Dextrin 9004-53-9 100 0 N/A
Diammonium peroxodisulphate 7727-54-0 100 0.0062 N/A
Dicoco dimethyl quaternary ammonium chloride 61789-77-3 100 0.0003 N/A
Glycerol 56-81-5 100 0.0261 N/A
Guar gum 9000-30-0 100 0.1441 N/A
Hemicellulase enzyme 9012-54-8 100 0 N/A
Lactose 63-42-3 100 0.0013 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0 N/A
Maltodextrin 9050-36-6 100 0 N/A
Methanol 67-56-1 100 0.0031 N/A
N-Coco. 1.3-diaminopropane di-acetate 61791-64-8 100 0.0016 N/A
Nitrogen. liquid form 7727-37-9 100 4.0111 N/A
Non-crystalline silica (impurity) 7631-86-9 100 0.0003 N/A
poly(tetrafluoroethylene) 9002-84-0 100 0 N/A
Polyethylene glycol monohexyl ether 31726-34-8 100 0.0039 N/A
Potassium borate 1332-77-0 100 0.08 N/A
Potassium hydroxide 1310-58-3 100 0.0295 N/A
Propan-2-ol 67-63-0 100 0 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.0013 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-01-21 2019-01-21 Central Water Distribution Facility 2479

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 7272 0.0 0.0 0.0
2020 2103 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-13 No Incident Encountered 0.00 0.00
2019-01-27 No Incident Encountered 0.00 0.00

For data sources see[10]

References