X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495121412000

Well Details

Well ID: 0495121412000
Loading map...
Location: 00/12-14-049-12W5/0
Location Alias: 00/12-14-49-12 W5M
Location Alias 2: 00/12-14-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 14
County/Municipality: Yellowhead County
Well Name: RIDGEBACK PEMBINA 12-14-49-12
Operator Name: Ridgeback Resources Inc.
License Number: 0440581
License Date: 2011-12-07
License Status: Issued
Spud Date: 2012-02-13
Final Drill Date: 2012-02-23
Well Total Depth: 3505.00 m
Surface Hole Latitude: 53.232040
Surface Hole Longitude: -115.630903

For data sources see[1][2]

Well History

Date Event
2010-02-23 Well Log Performed
2011-12-07 Obtained License
2012-02-15 Surface Casing Operation Performed
2012-02-15 Well Log Performed
2012-02-16 Direction Drilling Operation Performed - Horizontal
2012-02-18 Well Log Performed
2012-02-23 Finished Drilling
2012-02-23 Well Mode changed to Drilled and Cased
2012-02-25 Perforation Treatment Performed - Open-Hole Completion
2012-02-25 Production Casing Operation Performed
2012-02-25 Rig Released
2012-03-23 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-24 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-25 Well Began Production
2012-03-25 Well Fluid changed to Crude Oil
2012-03-25 Well Mode changed to Flowing
2017-04-01 Well Fluid changed to Crude Oil
2017-04-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-13 Ironhand Drilling Inc. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-16 2008.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-25 Open Hole/Barefoot Completion 3503.50 3505.00 0
2012-03-23 Multi-Stage Fracture 2913.30 2913.40 0
2012-03-23 Multi-Stage Fracture 2841.60 2841.70 0
2012-03-23 Multi-Stage Fracture 2781.30 2781.40 0
2012-03-24 Multi-Stage Fracture 2707.70 2707.80 0
2012-03-24 Multi-Stage Fracture 2635.00 2635.10 0
2012-03-24 Multi-Stage Fracture 2562.50 2562.60 0
2012-03-24 Multi-Stage Fracture 2490.60 2490.70 0
2012-03-24 Multi-Stage Fracture 2418.40 2418.50 0
2012-03-24 Multi-Stage Fracture 2357.50 2357.60 0
2012-03-24 Multi-Stage Fracture 2282.60 2282.70 0
2012-03-23 Multi-Stage Fracture 3478.10 3478.20 0
2012-03-24 Multi-Stage Fracture 2212.20 2212.30 0
2012-03-24 Multi-Stage Fracture 2150.50 2150.60 0
2012-03-23 Multi-Stage Fracture 3412.10 3412.20 0
2012-03-23 Multi-Stage Fracture 3340.20 3340.30 0
2012-03-23 Multi-Stage Fracture 3266.50 3266.60 0
2012-03-23 Multi-Stage Fracture 3193.80 3193.90 0
2012-03-23 Multi-Stage Fracture 3119.70 3119.80 0
2012-03-23 Multi-Stage Fracture 3063.00 3063.10 0
2012-03-23 Multi-Stage Fracture 2988.30 2988.40 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5757 0.0 0.0 0.0
2013 8622 0.0 0.0 0.0
2014 8435 0.0 0.0 0.0
2015 8689 0.0 0.0 0.0
2016 8613 0.0 0.0 0.0
2017 8733 0.0 0.0 0.0
2018 8741 0.0 0.0 0.0
2019 8735 0.0 0.0 0.0
2020 2177 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-30 No Incident Encountered 0.00 0.00

For data sources see[8]

References