X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495121905000

Well Details

Well ID: 0495121905000
Loading map...
Location: 00/05-19-049-12W5/0
Location Alias: 00/05-19-49-12 W5M
Location Alias 2: 00/05-19-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 19
County/Municipality: Yellowhead County
Well Name: RIDGEBACK HZ PEMBINA 5-19-49-12
Operator Name: Ridgeback Resources Inc.
License Number: 0488362
License Date: 2018-02-20
License Status: Issued
Spud Date: 2018-02-24
Final Drill Date: 2018-03-05
Well Total Depth: 4530.00 m
Surface Hole Latitude: 53.261908
Surface Hole Longitude: -115.759491

For data sources see[1][2]

Well History

Date Event
2018-02-20 Obtained License
2018-02-25 Surface Casing Operation Performed
2018-02-27 Direction Drilling Operation Performed - Deviate
2018-02-27 Direction Drilling Operation Performed - Horizontal
2018-03-05 Finished Drilling
2018-03-05 Well Log Performed
2018-03-05 Well Mode changed to Drilled and Cased
2018-03-10 Perforation Treatment Performed - Open-Hole Completion
2018-03-10 Production Casing Operation Performed
2018-03-10 Rig Released
2018-09-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-09-10 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-04 Well Began Production
2018-10-04 Well Fluid changed to Crude Oil
2018-10-04 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-02-24 Precision Drilling Corporation 183 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-02-27 1663.80 Deviate (5 - 79 degrees)
2018-02-27 2033.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-03-10 Open Hole/Barefoot Completion 4525.00 4530.00 0
2018-09-08 Multi-Stage Fracture 4147.10 4147.20 0
2018-09-08 Multi-Stage Fracture 4106.80 4106.90 0
2018-09-08 Multi-Stage Fracture 4066.40 4066.50 0
2018-09-08 Multi-Stage Fracture 4026.10 4026.20 0
2018-09-08 Multi-Stage Fracture 3985.80 3985.90 0
2018-09-08 Multi-Stage Fracture 3945.40 3945.50 0
2018-09-08 Multi-Stage Fracture 3905.10 3905.20 0
2018-09-09 Multi-Stage Fracture 3864.80 3864.90 0
2018-09-09 Multi-Stage Fracture 3824.40 3824.50 0
2018-09-09 Multi-Stage Fracture 3784.40 3784.50 0
2018-09-08 Multi-Stage Fracture 4469.80 4469.90 0
2018-09-09 Multi-Stage Fracture 3743.70 3743.80 0
2018-09-09 Multi-Stage Fracture 3703.40 3703.50 0
2018-09-09 Multi-Stage Fracture 3663.10 3663.20 0
2018-09-09 Multi-Stage Fracture 3622.70 3622.80 0
2018-09-09 Multi-Stage Fracture 3582.40 3582.50 0
2018-09-09 Multi-Stage Fracture 3542.00 3542.10 0
2018-09-09 Multi-Stage Fracture 3501.70 3501.80 0
2018-09-09 Multi-Stage Fracture 3461.40 3461.50 0
2018-09-09 Multi-Stage Fracture 3421.00 3421.10 0
2018-09-09 Multi-Stage Fracture 3380.70 3380.80 0
2018-09-08 Multi-Stage Fracture 4429.50 4429.60 0
2018-09-09 Multi-Stage Fracture 3340.30 3340.40 0
2018-09-09 Multi-Stage Fracture 3300.00 3300.10 0
2018-09-09 Multi-Stage Fracture 3259.70 3259.80 0
2018-09-09 Multi-Stage Fracture 3219.30 3219.40 0
2018-09-09 Multi-Stage Fracture 3179.00 3179.10 0
2018-09-09 Multi-Stage Fracture 3138.60 3138.70 0
2018-09-09 Multi-Stage Fracture 3098.30 3098.40 0
2018-09-09 Multi-Stage Fracture 3058.00 3058.10 0
2018-09-09 Multi-Stage Fracture 3017.60 3017.70 0
2018-09-09 Multi-Stage Fracture 2977.30 2977.40 0
2018-09-08 Multi-Stage Fracture 4389.20 4389.30 0
2018-09-09 Multi-Stage Fracture 2937.00 2937.10 0
2018-09-10 Multi-Stage Fracture 2896.60 2896.70 0
2018-09-10 Multi-Stage Fracture 2856.30 2856.40 0
2018-09-10 Multi-Stage Fracture 2815.90 2816.00 0
2018-09-10 Multi-Stage Fracture 2775.60 2775.70 0
2018-09-10 Multi-Stage Fracture 2735.30 2735.40 0
2018-09-10 Multi-Stage Fracture 2694.90 2695.00 0
2018-09-10 Multi-Stage Fracture 2654.60 2654.70 0
2018-09-10 Multi-Stage Fracture 2614.20 2614.30 0
2018-09-10 Multi-Stage Fracture 2573.90 2574.00 0
2018-09-08 Multi-Stage Fracture 4348.80 4348.90 0
2018-09-10 Multi-Stage Fracture 2533.60 2533.70 0
2018-09-10 Multi-Stage Fracture 2493.20 2493.30 0
2018-09-10 Multi-Stage Fracture 2452.90 2453.00 0
2018-09-10 Multi-Stage Fracture 2412.50 2412.60 0
2018-09-10 Multi-Stage Fracture 2372.20 2372.30 0
2018-09-10 Multi-Stage Fracture 2331.90 2332.00 0
2018-09-10 Multi-Stage Fracture 2291.50 2291.60 0
2018-09-10 Multi-Stage Fracture 2251.20 2251.30 0
2018-09-10 Multi-Stage Fracture 2210.90 2211.00 0
2018-09-10 Multi-Stage Fracture 2170.50 2170.60 0
2018-09-08 Multi-Stage Fracture 4308.50 4308.60 0
2018-09-10 Multi-Stage Fracture 2130.20 2130.30 0
2018-09-08 Multi-Stage Fracture 4268.10 4268.20 0
2018-09-08 Multi-Stage Fracture 4227.80 4227.90 0
2018-09-08 Multi-Stage Fracture 4187.50 4187.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-09-08 2018-09-10 1,922 7,230 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 94.3167 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 2.82 N/A
40/70 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 2.9125 N/A
ELEBR-4 Element Breaker Ammonium persulfate 7727-54-0 100 0.013 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0984 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0984 N/A
ELEFE-3 Element Surfactant Isopropyl alcohol 67-63-0 100 0.1011 N/A
Methanol 67-56-1 100 0.1011 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.1011 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-09-07 2018-09-10 Surface Water - Runoff 6863
2018-09-10 2018-09-10 Surface Water - Runoff 1220

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2007 0.0 0.0 0.0
2019 8728 0.0 0.0 0.0
2020 2125 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-03-10 No Incident Encountered 0.00 0.00
2018-09-11 No Incident Encountered 0.00 0.00

For data sources see[10]

References