If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495121905000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.261908,"lon":-115.759491,"icon":""}]} |
Location: 00/05-19-049-12W5/0 | |
Location Alias: 00/05-19-49-12 W5M | |
Location Alias 2: 00/05-19-049-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 12 | |
Section: 19 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK HZ PEMBINA 5-19-49-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0488362 | |
License Date: 2018-02-20 | |
License Status: Issued | |
Spud Date: 2018-02-24 | |
Final Drill Date: 2018-03-05 | |
Well Total Depth: 4530.00 m | |
Surface Hole Latitude: 53.261908 | |
Surface Hole Longitude: -115.759491 |
Date | Event |
---|---|
2018-02-20 | Obtained License |
2018-02-25 | Surface Casing Operation Performed |
2018-02-27 | Direction Drilling Operation Performed - Deviate |
2018-02-27 | Direction Drilling Operation Performed - Horizontal |
2018-03-05 | Finished Drilling |
2018-03-05 | Well Log Performed |
2018-03-05 | Well Mode changed to Drilled and Cased |
2018-03-10 | Perforation Treatment Performed - Open-Hole Completion |
2018-03-10 | Production Casing Operation Performed |
2018-03-10 | Rig Released |
2018-09-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-09-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-09-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-10-04 | Well Began Production |
2018-10-04 | Well Fluid changed to Crude Oil |
2018-10-04 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-02-24 | Precision Drilling Corporation | 183 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-02-27 | 1663.80 | Deviate (5 - 79 degrees) |
2018-02-27 | 2033.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-03-10 | Open Hole/Barefoot Completion | 4525.00 | 4530.00 | 0 |
2018-09-08 | Multi-Stage Fracture | 4147.10 | 4147.20 | 0 |
2018-09-08 | Multi-Stage Fracture | 4106.80 | 4106.90 | 0 |
2018-09-08 | Multi-Stage Fracture | 4066.40 | 4066.50 | 0 |
2018-09-08 | Multi-Stage Fracture | 4026.10 | 4026.20 | 0 |
2018-09-08 | Multi-Stage Fracture | 3985.80 | 3985.90 | 0 |
2018-09-08 | Multi-Stage Fracture | 3945.40 | 3945.50 | 0 |
2018-09-08 | Multi-Stage Fracture | 3905.10 | 3905.20 | 0 |
2018-09-09 | Multi-Stage Fracture | 3864.80 | 3864.90 | 0 |
2018-09-09 | Multi-Stage Fracture | 3824.40 | 3824.50 | 0 |
2018-09-09 | Multi-Stage Fracture | 3784.40 | 3784.50 | 0 |
2018-09-08 | Multi-Stage Fracture | 4469.80 | 4469.90 | 0 |
2018-09-09 | Multi-Stage Fracture | 3743.70 | 3743.80 | 0 |
2018-09-09 | Multi-Stage Fracture | 3703.40 | 3703.50 | 0 |
2018-09-09 | Multi-Stage Fracture | 3663.10 | 3663.20 | 0 |
2018-09-09 | Multi-Stage Fracture | 3622.70 | 3622.80 | 0 |
2018-09-09 | Multi-Stage Fracture | 3582.40 | 3582.50 | 0 |
2018-09-09 | Multi-Stage Fracture | 3542.00 | 3542.10 | 0 |
2018-09-09 | Multi-Stage Fracture | 3501.70 | 3501.80 | 0 |
2018-09-09 | Multi-Stage Fracture | 3461.40 | 3461.50 | 0 |
2018-09-09 | Multi-Stage Fracture | 3421.00 | 3421.10 | 0 |
2018-09-09 | Multi-Stage Fracture | 3380.70 | 3380.80 | 0 |
2018-09-08 | Multi-Stage Fracture | 4429.50 | 4429.60 | 0 |
2018-09-09 | Multi-Stage Fracture | 3340.30 | 3340.40 | 0 |
2018-09-09 | Multi-Stage Fracture | 3300.00 | 3300.10 | 0 |
2018-09-09 | Multi-Stage Fracture | 3259.70 | 3259.80 | 0 |
2018-09-09 | Multi-Stage Fracture | 3219.30 | 3219.40 | 0 |
2018-09-09 | Multi-Stage Fracture | 3179.00 | 3179.10 | 0 |
2018-09-09 | Multi-Stage Fracture | 3138.60 | 3138.70 | 0 |
2018-09-09 | Multi-Stage Fracture | 3098.30 | 3098.40 | 0 |
2018-09-09 | Multi-Stage Fracture | 3058.00 | 3058.10 | 0 |
2018-09-09 | Multi-Stage Fracture | 3017.60 | 3017.70 | 0 |
2018-09-09 | Multi-Stage Fracture | 2977.30 | 2977.40 | 0 |
2018-09-08 | Multi-Stage Fracture | 4389.20 | 4389.30 | 0 |
2018-09-09 | Multi-Stage Fracture | 2937.00 | 2937.10 | 0 |
2018-09-10 | Multi-Stage Fracture | 2896.60 | 2896.70 | 0 |
2018-09-10 | Multi-Stage Fracture | 2856.30 | 2856.40 | 0 |
2018-09-10 | Multi-Stage Fracture | 2815.90 | 2816.00 | 0 |
2018-09-10 | Multi-Stage Fracture | 2775.60 | 2775.70 | 0 |
2018-09-10 | Multi-Stage Fracture | 2735.30 | 2735.40 | 0 |
2018-09-10 | Multi-Stage Fracture | 2694.90 | 2695.00 | 0 |
2018-09-10 | Multi-Stage Fracture | 2654.60 | 2654.70 | 0 |
2018-09-10 | Multi-Stage Fracture | 2614.20 | 2614.30 | 0 |
2018-09-10 | Multi-Stage Fracture | 2573.90 | 2574.00 | 0 |
2018-09-08 | Multi-Stage Fracture | 4348.80 | 4348.90 | 0 |
2018-09-10 | Multi-Stage Fracture | 2533.60 | 2533.70 | 0 |
2018-09-10 | Multi-Stage Fracture | 2493.20 | 2493.30 | 0 |
2018-09-10 | Multi-Stage Fracture | 2452.90 | 2453.00 | 0 |
2018-09-10 | Multi-Stage Fracture | 2412.50 | 2412.60 | 0 |
2018-09-10 | Multi-Stage Fracture | 2372.20 | 2372.30 | 0 |
2018-09-10 | Multi-Stage Fracture | 2331.90 | 2332.00 | 0 |
2018-09-10 | Multi-Stage Fracture | 2291.50 | 2291.60 | 0 |
2018-09-10 | Multi-Stage Fracture | 2251.20 | 2251.30 | 0 |
2018-09-10 | Multi-Stage Fracture | 2210.90 | 2211.00 | 0 |
2018-09-10 | Multi-Stage Fracture | 2170.50 | 2170.60 | 0 |
2018-09-08 | Multi-Stage Fracture | 4308.50 | 4308.60 | 0 |
2018-09-10 | Multi-Stage Fracture | 2130.20 | 2130.30 | 0 |
2018-09-08 | Multi-Stage Fracture | 4268.10 | 4268.20 | 0 |
2018-09-08 | Multi-Stage Fracture | 4227.80 | 4227.90 | 0 |
2018-09-08 | Multi-Stage Fracture | 4187.50 | 4187.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-09-08 | 2018-09-10 | 1,922 | 7,230 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 94.3167 | N/A | |||
30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 2.82 | N/A | ||
40/70 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 2.9125 | N/A | ||
ELEBR-4 | Element | Breaker | Ammonium persulfate | 7727-54-0 | 100 | 0.013 | N/A | |
ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0984 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0984 | N/A | ||||
ELEFE-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.1011 | N/A | |
Methanol | 67-56-1 | 100 | 0.1011 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.1011 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-09-07 | 2018-09-10 | Surface Water - Runoff | 6863 |
2018-09-10 | 2018-09-10 | Surface Water - Runoff | 1220 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 2007 | 0.0 | 0.0 | 0.0 |
2019 | 8728 | 0.0 | 0.0 | 0.0 |
2020 | 2125 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-03-10 | No Incident Encountered | 0.00 | 0.00 |
2018-09-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]