X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495122004020

Well Details

Well ID: 0495122004020
Loading map...
Location: 02/04-20-049-12W5/0
Location Alias: 02/04-20-49-12 W5M
Location Alias 2: 02/04-20-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 20
County/Municipality: Yellowhead County
Well Name: RIDGEBACK PEMBINA 4-20-49-12
Operator Name: Ridgeback Resources Inc.
License Number: 0427204
License Date: 2010-12-08
License Status: Issued
Spud Date: 2011-01-04
Final Drill Date: 2011-01-15
Well Total Depth: 3621.00 m
Surface Hole Latitude: 53.239079
Surface Hole Longitude: -115.705433

For data sources see[1][2]

Well History

Date Event
2010-12-08 Obtained License
2011-01-05 Surface Casing Operation Performed
2011-01-08 Direction Drilling Operation Performed - Horizontal
2011-01-15 Finished Drilling
2011-01-15 Perforation Treatment Performed - Open-Hole Completion
2011-01-15 Well Log Performed
2011-01-15 Well Mode changed to Drilled and Cased
2011-01-17 Liner Casing Operation Performed
2011-01-17 Production Casing Operation Performed
2011-01-18 Rig Released
2011-01-28 Well Log Performed
2011-02-08 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-09 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-12 Well Began Production
2011-02-12 Well Fluid changed to Crude Oil
2011-02-12 Well Mode changed to Flowing
2017-04-01 Well Fluid changed to Crude Oil
2017-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-01-08 1516.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-15 Open Hole/Barefoot Completion 3612.00 3621.00 0
2011-02-08 Multi-Stage Fracture 2991.10 2991.20 0
2011-02-08 Multi-Stage Fracture 2917.50 2917.60 0
2011-02-09 Multi-Stage Fracture 2845.70 2845.80 0
2011-02-09 Multi-Stage Fracture 2772.40 2772.50 0
2011-02-09 Multi-Stage Fracture 2699.70 2699.80 0
2011-02-09 Multi-Stage Fracture 2626.40 2626.50 0
2011-02-09 Multi-Stage Fracture 2553.70 2553.80 0
2011-02-09 Multi-Stage Fracture 2482.00 2482.10 0
2011-02-09 Multi-Stage Fracture 2407.90 2408.00 0
2011-02-09 Multi-Stage Fracture 2335.70 2335.80 0
2011-02-08 Multi-Stage Fracture 3577.80 3577.90 0
2011-02-09 Multi-Stage Fracture 2262.40 2262.50 0
2011-02-09 Multi-Stage Fracture 2189.40 2189.50 0
2011-02-08 Multi-Stage Fracture 3498.30 3498.40 0
2011-02-08 Multi-Stage Fracture 3425.70 3425.80 0
2011-02-08 Multi-Stage Fracture 3353.90 3354.00 0
2011-02-08 Multi-Stage Fracture 3282.20 3282.30 0
2011-02-08 Multi-Stage Fracture 3210.10 3210.20 0
2011-02-08 Multi-Stage Fracture 3137.20 3137.30 0
2011-02-08 Multi-Stage Fracture 3064.30 3064.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 5701 0.0 0.0 0.0
2012 8641 0.0 0.0 0.0
2013 8623 0.0 0.0 0.0
2014 8611 0.0 0.0 0.0
2015 8167 0.0 0.0 0.0
2016 8677 0.0 0.0 0.0
2017 8727 0.0 0.0 0.0
2018 8733 0.0 0.0 0.0
2019 8637 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References