X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495122206000

Well Details

Well ID: 0495122206000
Loading map...
Location: 00/06-22-049-12W5/0
Location Alias: 00/06-22-49-12 W5M
Location Alias 2: 00/06-22-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 22
County/Municipality: Yellowhead County
Well Name: 1107882 ACC PEMBINA 6-22-49-12
Operator Name: Obsidian Energy Ltd.
License Number: 0074712
License Date: 1979-03-01
License Status: Issued
Spud Date: 1979-03-25
Final Drill Date: 1979-05-18
Well Total Depth: 3098.00 m
Surface Hole Latitude: 53.242140
Surface Hole Longitude: -115.673020

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-03-01 Obtained License
1979-05-18 Finished Drilling
1979-05-18 Lost Circulation Occurred
1979-06-02 Lost Circulation Occurred
1979-06-12 Production Casing Operation Performed
1979-07-31 Perforation Treatment Performed - Jet Perforation
1979-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-03 Well Mode changed to Drilled and Cased
1980-08-02 Well Began Injection
1980-08-02 Well Fluid changed to Water
1980-08-02 Well Type changed to Disposal
1984-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-21 Well Log Performed
1985-05-16 Perforation Treatment Performed - Cement Plug
1985-05-28 Well Fluid changed to Water
1985-05-28 Well Mode changed to Suspended
1985-05-28 Well Type changed to Disposal
1985-06-16 Well Log Performed
1985-06-20 Well Began Production
1985-06-20 Well Fluid changed to Crude Oil
1985-06-20 Well Mode changed to Flowing
1985-06-21 Perforation Treatment Performed - Jet Perforation
1985-06-21 Well Log Performed
1985-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-24 Well Log Performed
1989-03-13 Well Log Performed
1989-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-06-14 Perforation Treatment Performed - Cement Squeeze
1989-06-18 Perforation Treatment Performed - Jet Perforation
1989-06-18 Well Log Performed
1989-07-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-04-28 Perforation Treatment Performed - Cement Squeeze
1991-05-01 Perforation Treatment Performed - Jet Perforation
1991-05-07 Perforation Treatment Performed - Jet Perforation
1991-05-07 Well Log Performed
1991-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-17 Perforation Treatment Performed - Cement Squeeze
1991-05-22 Perforation Treatment Performed - Jet Perforation
1991-05-22 Well Log Performed
1992-03-03 Well Log Performed
1992-04-19 Perforation Treatment Performed - Jet Perforation
1992-04-20 Well Log Performed
1996-06-03 Well Log Performed
2009-09-18 Well Log Performed
2009-09-27 Perforation Treatment Performed - Chemical Squeeze
2009-10-13 Well Log Performed
2009-10-15 Well Log Performed
2013-08-26 Well Log Performed
2013-09-24 Well Log Performed
2018-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-07-31 Perforation 3042.00 3049.00 13
1989-07-04 Acid Treatment 3015.50 3020.50 0
1991-04-28 Cement Squeeze 3015.50 3020.50 0
1991-05-01 Perforation 3020.00 3025.00 20
1991-05-07 Perforation 3015.50 3020.50 13
1991-05-11 Acid Treatment 3015.50 3025.00 0
1991-05-17 Acid Treatment 3015.50 3025.00 0
1991-05-17 Cement Squeeze 3015.50 3025.00 0
1991-05-22 Perforation 3027.30 3029.30 20
1992-04-19 Perforation 3042.00 3049.00 13
2009-09-27 Chemical Squeeze 3042.00 3049.00 0
1979-08-03 Acid Treatment 3042.00 3049.00 0
2018-02-10 Acid Treatment 3027.30 3029.30 0
1984-04-12 Acid Treatment 3042.00 3049.00 0
1985-05-16 Cement Plug 3035.70 3040.00 0
1985-06-21 Perforation 2994.50 3002.50 13
1985-06-22 Acid Treatment 2994.50 3002.50 0
1989-06-14 Acid Treatment 2994.50 3002.50 0
1989-06-14 Cement Squeeze 2994.50 3002.50 0
1989-06-18 Perforation 3015.50 3020.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 3328 0.0 0.0 0.0
1986 4265 0.0 0.0 0.0
1987 6893 0.0 0.0 0.0
1988 734 0.0 0.0 0.0
1989 4620 0.0 0.0 0.0
1990 8288 0.0 0.0 0.0
1991 7709 0.0 0.0 0.0
1992 8272 0.0 0.0 0.0
1993 8181 0.0 0.0 0.0
1994 7943 0.0 0.0 0.0
1995 8107 0.0 0.0 0.0
1996 8193 0.0 0.0 0.0
1997 8561 0.0 0.0 0.0
1998 8054 0.0 0.0 0.0
1999 8553 0.0 0.0 0.0
2000 8615 0.0 0.0 0.0
2001 8325 0.0 0.0 0.0
2002 8544 0.0 0.0 0.0
2003 8595 0.0 0.0 0.0
2004 8752 0.0 0.0 0.0
2005 8379 0.0 0.0 0.0
2006 8694 0.0 0.0 0.0
2007 8134 0.0 0.0 0.0
2008 8678 0.0 0.0 0.0
2009 7158 0.0 0.0 0.0
2010 8128 0.0 0.0 0.0
2011 8670 0.0 0.0 0.0
2012 7945 0.0 0.0 0.0
2013 2954 0.0 0.0 0.0
2014 7739 0.0 0.0 0.0
2015 7809 0.0 0.0 0.0
2016 8703 0.0 0.0 0.0
2017 8196 0.0 0.0 0.0
2018 7668 0.0 0.0 0.0
2019 6731 0.0 0.0 0.0
2020 2073 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-05-18 Lost Circulation 3098.00 3098.00
1979-06-02 Lost Circulation 3097.00 3097.00
2018-02-10 No Incident Encountered 0.00 0.00

For data sources see[6]

References