X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495122211020

Well Details

Well ID: 0495122211020
Loading map...
Location: 02/11-22-049-12W5/0
Location Alias: 02/11-22-49-12 W5M
Location Alias 2: 02/11-22-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 22
County/Municipality: Yellowhead County
Well Name: 1107882 ACC PEMBINA A11-22-49-12
Operator Name: Obsidian Energy Ltd.
License Number: 0061796
License Date: 1976-12-28
License Status: Issued
Spud Date: 1976-12-16
Final Drill Date: 1977-02-05
Well Total Depth: 3356.50 m
Surface Hole Latitude: 53.245327
Surface Hole Longitude: -115.671653

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-12-28 Obtained License
1977-01-15 Kick Occurred
1977-01-17 Drill Stem Test Performed
1977-01-22 Liner Casing Operation Performed
1977-01-22 Perforation Treatment Performed - Open-Hole Completion
1977-02-05 Finished Drilling
1977-02-05 Well Mode changed to Drilled and Cased
1977-03-06 Drill Stem Test Performed
1977-03-12 Perforation Treatment Performed - Cement Plug
1977-03-13 Perforation Treatment Performed - Cement Squeeze
1977-03-16 Perforation Treatment Performed - Jet Perforation
1977-03-17 Perforation Treatment Performed - Cement Squeeze
1977-03-18 Perforation Treatment Performed - Jet Perforation
1977-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-03-21 Perforation Treatment Performed - Cement Squeeze
1977-03-26 Perforation Treatment Performed - Jet Perforation
1977-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-03-28 Well Began Production
1977-03-28 Well Fluid changed to Crude Oil
1977-03-28 Well Mode changed to Flowing
1979-08-12 Well Fluid changed to Crude Oil
1979-08-12 Well Mode changed to Suspended
1979-10-01 Well Fluid changed to Crude Oil
1979-10-01 Well Mode changed to Flowing
1981-08-05 Well Log Performed
1985-01-31 Well Log Performed
1985-05-02 Perforation Treatment Performed - Cement Plug
1985-05-06 Perforation Treatment Performed - Jet Perforation
1985-05-06 Well Log Performed
1985-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-03 Well Began Injection
1985-07-03 Well Fluid changed to Gas
1985-07-03 Well Type changed to Injection
1988-04-02 Perforation Treatment Performed - Chemical Squeeze
1988-04-03 Perforation Treatment Performed - Chemical Squeeze
1988-07-31 Perforation Treatment Performed - Chemical Squeeze
1988-08-01 Perforation Treatment Performed - Chemical Squeeze
1988-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-03-22 Perforation Treatment Performed - Chemical Squeeze
1989-03-24 Perforation Treatment Performed - Fractured
1995-02-01 Well Fluid changed to Gas
1995-02-01 Well Mode changed to Suspended
1995-02-01 Well Type changed to Injection
2005-03-18 Perforation Treatment Performed - Jet Perforation
2005-03-18 Well Log Performed
2005-03-19 Well Log Performed
2005-03-23 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-01-22 Open Hole/Barefoot Completion 2974.20 3356.50 0
1977-03-28 Acid Treatment 2979.70 2987.60 0
1985-05-02 Cement Plug 2973.60 2977.90 0
1985-05-06 Perforation 2960.20 2972.40 13
1985-05-07 Acid Treatment 2960.20 2972.40 0
1988-04-02 Chemical Squeeze 2960.20 2972.40 0
1988-04-03 Chemical Squeeze 2960.20 2972.40 0
1988-07-31 Chemical Squeeze 2960.20 2972.40 0
1988-08-01 Chemical Squeeze 2960.20 2972.40 0
1988-08-06 Acid Treatment 2960.20 2972.40 0
1989-03-22 Chemical Squeeze 2960.20 2972.40 0
1977-03-12 Cement Plug 3109.00 3356.50 0
1989-03-24 Fracture 2960.20 2972.40 0
2005-03-18 Perforation 2430.50 2432.50 17
2005-03-18 Perforation 2409.00 2412.00 17
2005-03-23 Chemical Squeeze 2430.50 2432.50 0
2005-03-23 Chemical Squeeze 2409.00 2412.00 0
1977-03-13 Cement Squeeze 2974.20 3109.00 0
1977-03-16 Perforation 3023.30 3026.40 3
1977-03-17 Cement Squeeze 3023.30 3026.40 0
1977-03-18 Perforation 3012.60 3015.70 7
1977-03-19 Acid Treatment 3012.60 3015.70 0
1977-03-21 Cement Squeeze 3012.60 3015.70 0
1977-03-26 Perforation 2979.70 2987.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 1920 0.0 0.0 0.0
1978 4584 0.0 0.0 0.0
1979 4346 0.0 0.0 0.0
1980 5281 0.0 0.0 0.0
1981 5127 0.0 0.0 0.0
1982 6449 0.0 0.0 0.0
1983 7975 0.0 0.0 0.0
1984 8007 0.0 0.0 0.0
1985 3057 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-01-15 Kick 2974.20 2974.20

For data sources see[6]

References