X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495122602000

Well Details

Well ID: 0495122602000
Loading map...
Location: 00/02-26-049-12W5/0
Location Alias: 00/02-26-49-12 W5M
Location Alias 2: 00/02-26-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 26
County/Municipality: Yellowhead County
Well Name: RIDGEBACK PEMBINA 2-26-49-12
Operator Name: Ridgeback Resources Inc.
License Number: 0436985
License Date: 2011-09-20
License Status: Issued
Spud Date: 2011-10-29
Final Drill Date: 2011-11-06
Well Total Depth: 3388.00 m
Surface Hole Latitude: 53.266635
Surface Hole Longitude: -115.640169

For data sources see[1][2]

Well History

Date Event
2011-09-20 Obtained License
2011-10-29 Surface Casing Operation Performed
2011-10-30 Well Log Performed
2011-10-31 Direction Drilling Operation Performed - Horizontal
2011-11-06 Finished Drilling
2011-11-06 Well Log Performed
2011-11-06 Well Mode changed to Drilled and Cased
2011-11-07 Production Casing Operation Performed
2011-11-08 Perforation Treatment Performed - Open-Hole Completion
2011-11-08 Rig Released
2011-11-24 Well Log Performed
2011-12-11 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-12 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-14 Well Began Production
2011-12-14 Well Fluid changed to Crude Oil
2011-12-14 Well Mode changed to Flowing
2017-04-01 Well Fluid changed to Crude Oil
2017-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-31 1408.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-08 Open Hole/Barefoot Completion 3385.70 3388.00 0
2011-12-11 Multi-Stage Fracture 2810.80 2810.90 0
2011-12-11 Multi-Stage Fracture 2734.60 2734.70 0
2011-12-11 Multi-Stage Fracture 2672.70 2672.80 0
2011-12-12 Multi-Stage Fracture 2597.80 2597.90 0
2011-12-12 Multi-Stage Fracture 2535.30 2535.40 0
2011-12-12 Multi-Stage Fracture 2458.30 2458.40 0
2011-12-12 Multi-Stage Fracture 2395.50 2395.60 0
2011-12-12 Multi-Stage Fracture 2318.30 2318.40 0
2011-12-12 Multi-Stage Fracture 2255.50 2255.60 0
2011-12-12 Multi-Stage Fracture 2178.70 2178.80 0
2011-12-11 Multi-Stage Fracture 3357.10 3357.20 0
2011-12-12 Multi-Stage Fracture 2116.30 2116.40 0
2011-12-12 Multi-Stage Fracture 2054.30 2054.40 0
2011-12-11 Multi-Stage Fracture 3287.90 3288.00 0
2011-12-11 Multi-Stage Fracture 3225.50 3225.60 0
2011-12-11 Multi-Stage Fracture 3149.70 3149.80 0
2011-12-11 Multi-Stage Fracture 3087.60 3087.70 0
2011-12-11 Multi-Stage Fracture 3011.80 3011.90 0
2011-12-11 Multi-Stage Fracture 2949.50 2949.60 0
2011-12-11 Multi-Stage Fracture 2872.60 2872.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 120 0.0 0.0 0.0
2012 8474 0.0 0.0 0.0
2013 8514 0.0 0.0 0.0
2014 8505 0.0 0.0 0.0
2015 8659 0.0 0.0 0.0
2016 8780 0.0 0.0 0.0
2017 8746 0.0 0.0 0.0
2018 8645 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2139 0.0 0.0 0.0

For data sources see[6]

References