X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495122701000

Well Details

Well ID: 0495122701000
Loading map...
Location: 00/01-27-049-12W5/0
Location Alias: 00/01-27-49-12 W5M
Location Alias 2: 00/01-27-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 27
County/Municipality: Yellowhead County
Well Name: RIDGEBACK PEMBINA 1-27-49-12
Operator Name: Ridgeback Resources Inc.
License Number: 0436378
License Date: 2011-08-29
License Status: Issued
Spud Date: 2011-09-25
Final Drill Date: 2011-10-06
Well Total Depth: 3511.00 m
Surface Hole Latitude: 53.268307
Surface Hole Longitude: -115.664859

For data sources see[1][2]

Well History

Date Event
2011-08-29 Obtained License
2011-09-25 Surface Casing Operation Performed
2011-09-26 Well Log Performed
2011-09-27 Well Log Performed
2011-09-28 Direction Drilling Operation Performed - Horizontal
2011-10-06 Finished Drilling
2011-10-06 Well Mode changed to Drilled and Cased
2011-10-13 Perforation Treatment Performed - Open-Hole Completion
2011-10-13 Production Casing Operation Performed
2011-10-13 Rig Released
2011-10-19 Well Log Performed
2011-11-07 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-08 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-09 Well Began Production
2011-11-09 Well Fluid changed to Crude Oil
2011-11-09 Well Mode changed to Flowing
2017-04-01 Well Fluid changed to Crude Oil
2017-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-28 1424.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-13 Open Hole/Barefoot Completion 3508.30 3511.00 0
2011-11-07 Multi-Stage Fracture 2918.60 2918.70 0
2011-11-07 Multi-Stage Fracture 2858.00 2858.10 0
2011-11-08 Multi-Stage Fracture 2782.60 2782.70 0
2011-11-08 Multi-Stage Fracture 2720.60 2720.70 0
2011-11-08 Multi-Stage Fracture 2644.30 2644.40 0
2011-11-08 Multi-Stage Fracture 2582.60 2582.70 0
2011-11-08 Multi-Stage Fracture 2505.70 2505.80 0
2011-11-08 Multi-Stage Fracture 2443.40 2443.50 0
2011-11-08 Multi-Stage Fracture 2366.30 2366.40 0
2011-11-08 Multi-Stage Fracture 2305.50 2305.60 0
2011-11-07 Multi-Stage Fracture 3480.00 3480.10 0
2011-11-08 Multi-Stage Fracture 2228.40 2228.50 0
2011-11-08 Multi-Stage Fracture 2166.80 2166.90 0
2011-11-07 Multi-Stage Fracture 3411.10 3411.20 0
2011-11-07 Multi-Stage Fracture 3335.10 3335.20 0
2011-11-07 Multi-Stage Fracture 3272.80 3272.90 0
2011-11-07 Multi-Stage Fracture 3197.80 3197.90 0
2011-11-07 Multi-Stage Fracture 3135.10 3135.20 0
2011-11-07 Multi-Stage Fracture 3058.30 3058.40 0
2011-11-07 Multi-Stage Fracture 2995.50 2995.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 672 0.0 0.0 0.0
2012 8498 0.0 0.0 0.0
2013 8038 0.0 0.0 0.0
2014 8267 0.0 0.0 0.0
2015 8731 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8713 0.0 0.0 0.0
2018 8745 0.0 0.0 0.0
2019 8681 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References