X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495123205000

Well Details

Well ID: 0495123205000
Loading map...
Location: 00/05-32-049-12W5/0
Location Alias: 00/05-32-49-12 W5M
Location Alias 2: 00/05-32-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 32
County/Municipality: Yellowhead County
Well Name: VERMILION HZ PEMBINA 5-32-49-12
Operator Name: Vermilion Energy Inc.
License Number: 0433687
License Date: 2011-05-20
License Status: Issued
Spud Date: 2011-08-01
Final Drill Date: 2011-08-09
Well Total Depth: 3380.00 m
Surface Hole Latitude: 53.271743
Surface Hole Longitude: -115.705404

For data sources see[1][2]

Well History

Date Event
2011-05-20 Obtained License
2011-08-03 Surface Casing Operation Performed
2011-08-03 Well Log Performed
2011-08-04 Direction Drilling Operation Performed - Horizontal
2011-08-09 Finished Drilling
2011-08-09 Well Mode changed to Drilled and Cased
2011-08-11 Production Casing Operation Performed
2011-08-12 Rig Released
2011-09-13 Well Log Performed
2011-09-17 Perforation Treatment Performed - Open-Hole Completion
2011-09-18 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-19 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-30 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-01 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-01 Well Began Production
2011-10-01 Well Fluid changed to Crude Oil
2011-10-01 Well Mode changed to Pumping
2011-10-04 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-05 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-06 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-04 1400.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-17 Open Hole/Barefoot Completion 3376.00 3380.00 0
2011-10-05 Multi-Stage Fracture 2771.00 2771.10 0
2011-10-05 Multi-Stage Fracture 2698.80 2698.90 0
2011-10-05 Multi-Stage Fracture 2613.30 2613.40 0
2011-10-05 Multi-Stage Fracture 2541.10 2541.20 0
2011-10-05 Multi-Stage Fracture 2469.10 2469.20 0
2011-10-05 Multi-Stage Fracture 2396.90 2397.00 0
2011-10-05 Multi-Stage Fracture 2324.80 2324.90 0
2011-10-05 Multi-Stage Fracture 2239.40 2239.50 0
2011-10-06 Multi-Stage Fracture 2180.90 2181.00 0
2011-10-06 Multi-Stage Fracture 2095.30 2095.40 0
2011-09-18 Multi-Stage Fracture 3351.10 3351.20 0
2011-09-18 Multi-Stage Fracture 3285.50 3285.60 0
2011-09-18 Multi-Stage Fracture 3216.70 3216.80 0
2011-09-19 Multi-Stage Fracture 3144.60 3144.70 0
2011-09-30 Multi-Stage Fracture 3072.40 3072.50 0
2011-10-01 Multi-Stage Fracture 3000.30 3000.40 0
2011-10-01 Multi-Stage Fracture 2915.30 2915.40 0
2011-10-04 Multi-Stage Fracture 2843.10 2843.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1625 0.0 0.0 0.0
2012 8752 0.0 0.0 0.0
2013 8645 0.0 0.0 0.0
2014 8691 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 7729 0.0 0.0 0.0
2017 8728 0.0 0.0 0.0
2018 8527 0.0 0.0 0.0
2019 5771 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References