X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495123305000

Well Details

Well ID: 0495123305000
Loading map...
Location: 00/05-33-049-12W5/0
Location Alias: 00/05-33-49-12 W5M
Location Alias 2: 00/05-33-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 33
County/Municipality: Yellowhead County
Well Name: VEI HZ PEMBINA 5-33-49-12
Operator Name: Vermilion Energy Inc.
License Number: 0492118
License Date: 2018-11-16
License Status: Issued
Spud Date: 2018-12-05
Final Drill Date: 2018-12-14
Well Total Depth: 3642.00 m
Surface Hole Latitude: 53.265553
Surface Hole Longitude: -115.685643

For data sources see[1][2]

Well History

Date Event
2018-11-16 Obtained License
2018-12-06 Surface Casing Operation Performed
2018-12-10 Well Log Performed
2018-12-13 Direction Drilling Operation Performed - Deviate
2018-12-13 Direction Drilling Operation Performed - Horizontal
2018-12-14 Finished Drilling
2018-12-14 Production Casing Operation Performed
2018-12-14 Well Log Performed
2018-12-14 Well Mode changed to Drilled and Cased
2018-12-15 Rig Released
2018-12-15 Well Log Performed
2019-01-19 Perforation Treatment Performed - Open-Hole Completion
2019-01-20 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-30 Well Began Production
2019-01-30 Well Fluid changed to Gas
2019-01-30 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-12-05 Horizon Drilling Inc. 23 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-12-13 709.80 Deviate (5 - 79 degrees)
2018-12-13 2442.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-19 Open Hole/Barefoot Completion 3541.00 3642.00 0
2019-01-20 Multi-Stage Fracture 2965.50 2965.60 0
2019-01-20 Multi-Stage Fracture 2896.50 2896.60 0
2019-01-20 Multi-Stage Fracture 2829.50 2829.60 0
2019-01-20 Multi-Stage Fracture 2766.10 2766.20 0
2019-01-20 Multi-Stage Fracture 2697.40 2697.50 0
2019-01-20 Multi-Stage Fracture 2628.10 2628.20 0
2019-01-20 Multi-Stage Fracture 2558.50 2558.60 0
2019-01-20 Multi-Stage Fracture 2491.70 2491.80 0
2019-01-20 Multi-Stage Fracture 2477.6 2477.7 0
2019-01-20 Multi-Stage Fracture 3516.10 3516.20 0
2019-01-20 Multi-Stage Fracture 3454.50 3454.60 0
2019-01-20 Multi-Stage Fracture 3389.10 3389.20 0
2019-01-20 Multi-Stage Fracture 3320.50 3320.60 0
2019-01-20 Multi-Stage Fracture 3250.40 3250.50 0
2019-01-20 Multi-Stage Fracture 3183.60 3183.70 0
2019-01-20 Multi-Stage Fracture 3116.00 3116.10 0
2019-01-20 Multi-Stage Fracture 3034.60 3034.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-20 2019-01-20 2,384 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* 7732-18-5 100 73.0283 N/A
YF125Flex. N002 Schlumberger Quartz. Crystalline silica 14808-60-7 100 21.4894 N/A
YF125Flex. N002 Schlumberger Energizing Fluid 2-hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.062 N/A
Acetic acid 64-19-7 100 0.0006 N/A
Amines. dicoco alkylmethyl 61788-62-3 100 0 N/A
Dextrin 9004-53-9 100 0 N/A
Diammonium peroxodisulphate 7727-54-0 100 0.0057 N/A
Dicoco dimethyl quaternary ammonium chloride 61789-77-3 100 0.0003 N/A
Glycerol 56-81-5 100 0.0194 N/A
Guar gum 9000-30-0 100 0.1892 N/A
Hemicellulase enzyme 9012-54-8 100 0 N/A
Lactose 63-42-3 100 0.0011 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0 N/A
Maltodextrin 9050-36-6 100 0 N/A
Methanol 67-56-1 100 0.0027 N/A
N-Coco. 1.3-diaminopropane di-acetate 61791-64-8 100 0.0014 N/A
Nitrogen. liquid form 7727-37-9 100 5.1127 N/A
Non-crystalline silica (impurity) 7631-86-9 100 0.0004 N/A
poly(tetrafluoroethylene) 9002-84-0 100 0 N/A
Polyethylene glycol monohexyl ether 31726-34-8 100 0.0041 N/A
Potassium borate 1332-77-0 100 0.0596 N/A
Potassium hydroxide 1310-58-3 100 0.022 N/A
Propan-2-ol 67-63-0 100 0 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.0012 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-01-20 2019-01-20 Central Water Distribution Facility 2223

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 7376 0.0 0.0 0.0
2020 2094 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-12-15 No Incident Encountered 0.00 0.00
2019-01-25 No Incident Encountered 0.00 0.00

For data sources see[10]

References