X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495123414000

Well Details

Well ID: 0495123414000
Loading map...
Location: 00/14-34-049-12W5/0
Location Alias: 00/14-34-49-12 W5M
Location Alias 2: 00/14-34-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 34
County/Municipality: Yellowhead County
Well Name: TORC HZ PEMBINA 14-34-49-12
Operator Name: TORC Oil & Gas Ltd.
License Number: 0433377
License Date: 2011-05-09
License Status: Issued
Spud Date: 2012-01-22
Final Drill Date: 2012-02-02
Well Total Depth: 3208.00 m
Surface Hole Latitude: 53.265034
Surface Hole Longitude: -115.674769

For data sources see[1][2]

Well History

Date Event
2011-05-09 Obtained License
2012-01-24 Surface Casing Operation Performed
2012-01-25 Well Log Performed
2012-01-26 Direction Drilling Operation Performed - Deviate
2012-01-27 Direction Drilling Operation Performed - Horizontal
2012-01-28 Well Log Performed
2012-02-02 Finished Drilling
2012-02-02 Well Log Performed
2012-02-02 Well Mode changed to Drilled and Cased
2012-02-04 Perforation Treatment Performed - Open-Hole Completion
2012-02-04 Production Casing Operation Performed
2012-02-04 Rig Released
2012-02-13 Well Log Performed
2012-02-19 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-20 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-20 Well Began Production
2012-02-20 Well Fluid changed to Crude Oil
2012-02-20 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-22 Ensign Drilling Inc. 546 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-26 1423.00 Deviate (5 - 79 degrees)
2012-01-27 1945.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-04 Open Hole/Barefoot Completion 3203.00 3208.00 0
2012-02-19 Multi-Stage Fracture 2601.80 2602.80 0
2012-02-20 Multi-Stage Fracture 2529.60 2530.60 0
2012-02-20 Multi-Stage Fracture 2458.60 2459.60 0
2012-02-20 Multi-Stage Fracture 2374.90 2375.90 0
2012-02-20 Multi-Stage Fracture 2304.00 2305.00 0
2012-02-20 Multi-Stage Fracture 2223.50 2224.50 0
2012-02-20 Multi-Stage Fracture 2156.80 2157.80 0
2012-02-20 Multi-Stage Fracture 2074.30 2075.30 0
2012-02-20 Multi-Stage Fracture 2015.10 2016.10 0
2012-02-20 Multi-Stage Fracture 1986.50 1987.50 0
2012-02-19 Multi-Stage Fracture 3179.00 3181.00 0
2012-02-19 Multi-Stage Fracture 3125.50 3126.50 0
2012-02-19 Multi-Stage Fracture 3045.40 3046.40 0
2012-02-19 Multi-Stage Fracture 2974.80 2975.80 0
2012-02-19 Multi-Stage Fracture 2894.40 2895.40 0
2012-02-19 Multi-Stage Fracture 2823.40 2824.40 0
2012-02-19 Multi-Stage Fracture 2752.20 2753.20 0
2012-02-19 Multi-Stage Fracture 2680.70 2681.70 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7323 0.0 0.0 0.0
2013 8013 0.0 0.0 0.0
2014 7942 0.0 0.0 0.0
2015 6936 0.0 0.0 0.0
2016 8423 0.0 0.0 0.0
2017 8527 0.0 0.0 0.0
2018 8711 0.0 0.0 0.0
2019 2986 0.0 0.0 0.0
2020 863 0.0 0.0 0.0

For data sources see[7]

References