If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495123603000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.281433,"lon":-115.630567,"icon":""}]} |
Location: 00/03-36-049-12W5/0 | |
Location Alias: 00/03-36-49-12 W5M | |
Location Alias 2: 00/03-36-049-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 12 | |
Section: 36 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK PEMBINA 3-36-49-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0448188 | |
License Date: 2012-08-31 | |
License Status: Issued | |
Spud Date: 2012-09-16 | |
Final Drill Date: 2012-09-30 | |
Well Total Depth: 3574.90 m | |
Surface Hole Latitude: 53.281433 | |
Surface Hole Longitude: -115.630567 |
Date | Event |
---|---|
2012-08-31 | Obtained License |
2012-09-19 | Surface Casing Operation Performed |
2012-09-21 | Direction Drilling Operation Performed - Deviate |
2012-09-22 | Direction Drilling Operation Performed - Horizontal |
2012-09-30 | Finished Drilling |
2012-09-30 | Well Log Performed |
2012-09-30 | Well Mode changed to Drilled and Cased |
2012-10-02 | Production Casing Operation Performed |
2012-10-03 | Perforation Treatment Performed - Open-Hole Completion |
2012-10-03 | Rig Released |
2012-10-09 | Well Log Performed |
2012-11-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-04 | Well Began Production |
2012-11-04 | Well Fluid changed to Crude Oil |
2012-11-04 | Well Mode changed to Flowing |
2012-11-12 | Well Log Performed |
2017-04-01 | Well Fluid changed to Crude Oil |
2017-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-09-16 | Precision Drilling Corporation | 232 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-09-21 | 1496.00 | Deviate (5 - 79 degrees) |
2012-09-22 | 1912.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-10-03 | Open Hole/Barefoot Completion | 3572.00 | 3574.90 | 0 |
2012-11-03 | Multi-Stage Fracture | 2970.50 | 2970.60 | 0 |
2012-11-03 | Multi-Stage Fracture | 2897.50 | 2897.60 | 0 |
2012-11-03 | Multi-Stage Fracture | 2824.60 | 2824.70 | 0 |
2012-11-03 | Multi-Stage Fracture | 2751.70 | 2751.80 | 0 |
2012-11-03 | Multi-Stage Fracture | 2678.80 | 2678.90 | 0 |
2012-11-03 | Multi-Stage Fracture | 2606.00 | 2606.10 | 0 |
2012-11-03 | Multi-Stage Fracture | 2533.40 | 2533.50 | 0 |
2012-11-03 | Multi-Stage Fracture | 2460.50 | 2460.60 | 0 |
2012-11-03 | Multi-Stage Fracture | 2387.60 | 2387.70 | 0 |
2012-11-04 | Multi-Stage Fracture | 2314.70 | 2314.80 | 0 |
2012-11-02 | Multi-Stage Fracture | 3546.90 | 3547.00 | 0 |
2012-11-04 | Multi-Stage Fracture | 2242.40 | 2242.50 | 0 |
2012-11-04 | Multi-Stage Fracture | 2169.60 | 2169.70 | 0 |
2012-11-04 | Multi-Stage Fracture | 2096.60 | 2096.70 | 0 |
2012-11-04 | Multi-Stage Fracture | 2023.80 | 2023.90 | 0 |
2012-11-02 | Multi-Stage Fracture | 3480.80 | 3480.90 | 0 |
2012-11-02 | Multi-Stage Fracture | 3407.90 | 3408.00 | 0 |
2012-11-02 | Multi-Stage Fracture | 3335.10 | 3335.20 | 0 |
2012-11-02 | Multi-Stage Fracture | 3262.20 | 3262.30 | 0 |
2012-11-03 | Multi-Stage Fracture | 3189.30 | 3189.40 | 0 |
2012-11-03 | Multi-Stage Fracture | 3116.30 | 3116.40 | 0 |
2012-11-03 | Multi-Stage Fracture | 3043.40 | 3043.50 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 886 | 0.0 | 0.0 | 0.0 |
2013 | 8697 | 0.0 | 0.0 | 0.0 |
2014 | 8235 | 0.0 | 0.0 | 0.0 |
2015 | 8590 | 0.0 | 0.0 | 0.0 |
2016 | 8717 | 0.0 | 0.0 | 0.0 |
2017 | 8713 | 0.0 | 0.0 | 0.0 |
2018 | 8615 | 0.0 | 0.0 | 0.0 |
2019 | 8685 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-10-03 | No Incident Encountered | 0.00 | 0.00 |
2012-12-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]